Separate out sanitary water from rainwater lines Date: January 5, 2015Permit type: Application | Permit status: Approved | Completion date: November 24, 2014 | Permit id: 2014-241725-000 | |||||
Not okay for simplifified sewer. Inquiry simplified sewer 11/24/14 Permit type: Intake -we | Permit status: Closed | Completion date: December 16, 2014 | Permit id: 2014-243940-000 | |||||
Not okay for simplifified sewer. Inquiry simplified sewer 11/24/14 Permit type: Intake -we | Permit status: Closed | Completion date: December 2, 2014 | Permit id: 2014-243940-000 | |||||
Not okay for simplifified sewer. Inquiry simplified sewer 11/24/14 Permit type: Bond/insurance -we | Permit status: Closed | Completion date: March 30, 2015 | Permit id: 2014-243940-000 | |||||
Not okay for simplifified sewer. Inquiry simplified sewer 11/24/14 Permit type: Bond/insurance -we | Permit status: Closed | Completion date: March 18, 2015 | Permit id: 2014-243940-000 | |||||
Not okay for simplifified sewer. Inquiry simplified sewer 11/24/14 Permit type: Issuance -we | Permit status: Closed | Completion date: April 1, 2015 | Permit id: 2014-243940-000 | |||||
Not okay for simplifified sewer. Inquiry simplified sewer 11/24/14 Permit type: Plan review -we | Permit status: Closed | Completion date: January 5, 2015 | Permit id: 2014-243940-000 | |||||
Not okay for simplifified sewer. Inquiry simplified sewer 11/24/14 Permit type: Plan review -we | Permit status: Closed | Completion date: January 20, 2015 | Permit id: 2014-243940-000 | |||||
Not okay for simplifified sewer. Inquiry simplified sewer 11/24/14 Permit type: Plan review -we | Permit status: Closed | Completion date: December 24, 2014 | Permit id: 2014-243940-000 | |||||
Not okay for simplifified sewer. Inquiry simplified sewer 11/24/14 Permit type: Plan review -we | Permit status: Closed | Completion date: February 26, 2015 | Permit id: 2014-243940-000 | |||||
Not okay for simplifified sewer. Inquiry simplified sewer 11/24/14 Permit type: Plan review -we | Permit status: Closed | Completion date: February 2, 2015 | Permit id: 2014-243940-000 | |||||
Not okay for simplifified sewer. Inquiry simplified sewer 11/24/14 Permit type: Plan review -we | Permit status: Closed | Completion date: March 17, 2015 | Permit id: 2014-243940-000 | |||||
Separate sanitary and rainwater from process waste Date: January 5, 2015Permit type: Intake | Permit status: Closed | Completion date: January 5, 2015 | Permit id: 2015-100975-000 | |||||
Replace 2 old sumps with 2 new catch basins. Install 1 new sump and run these to the lift station as per plans. Date: March 10, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: March 27, 2015 | Permit id: 2015-131935-000 | |||||
Installation of a trench drain, 2 floor drains, 2 lavatory sinks, 1 shower and a toilet Date: March 26, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: March 27, 2015 | Permit id: 2015-140567-000 | |||||
Sa/st: 57 lf of 12 pvc combo main, (approx d=10), in se 6th ave contractor shall connect to existing st & sa branchs that wye at curb per std p-262 (approx l= and d=6) from smh (unnamed). Contractor to verify all depths and locations in field. Contact x37869 Date: May 12, 2015Permit type: Intake | Permit status: Closed | Completion date: May 12, 2015 | Permit id: 2015-169554-000 | |||||
Install sanitary sewer to serve new wastewater pre-treatment building Date: May 12, 2015Permit type: Intake | Permit status: Closed | Completion date: May 12, 2015 | Permit id: 2015-169560-000 | |||||
Hazardous-12,0 gallon ust at north end of facility (outside) was decommissioned in place by nrc environmentalwork don with out permit / stu beutler Date: June 8, 2015Permit type: Intake | Permit status: Approved | Completion date: June 8, 2015 | Permit id: 2015-174158-000 | |||||
New wastewater pre treatment facility, 2,034 sq ft with attached slab for tank storage, includes tanks, stairs and catwalk within building, office and restroom. Attached weather protection canopy per appeal 11408 Date: February 25, 2015Permit type: Application | Permit status: Approved | Completion date: June 27, 2014 | Permit id: 2014-176384-000 | |||||
Install (1) 6 amp service and (1) 2 amp service Date: September 29, 2014Permit type: Intake | Permit status: Closed | Completion date: September 15, 2014 | Permit id: 2014-212447-000 | |||||
Hazardous/tank - installation of (2) new chemical tanks for the wastewater pre-treatment system. The 15 gal tanks to be installed outside building under a covered area. Tanks to contain chemicals used for ph neutralization of industrial wastewater Date: May 21, 2015Permit type: Intake | Permit status: Approved | Completion date: September 22, 2014 | Permit id: 2014-215855-000 | |||||
San conn: 2 lf of 8 vsp main, (approx d=11), in se 6th ave. Contractor shall excavate to obtain appropriate depth of lateral for gravity service and connect to existing branch per std p-262, 63 from ds smh (aby872) located in the intersection of se 6th ave & se ivon st. Contractor to verify all depths and locations in field. Contact x37869 Date: October 20, 2014Permit type: Intake | Permit status: Closed | Completion date: October 20, 2014 | Permit id: 2014-227825-000 | |||||
Repair / repalce leaking water service from meter to building. Date: July 29, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: July 31, 2015 | Permit id: 2015-208826-000 | |||||
Of gravity sanitary drainage. Water to hoses and emergency showers. Date: August 19, 2015Permit type: Intake | Permit status: Closed | Completion date: August 19, 2015 | Permit id: 2015-221071-000 | |||||
Running 4 chemical supply tubes to points of injection in wastewater treatment plant. 1 inch, 5 psi gas line from header to hwh. Pressure test to 1. 5 times Date: September 3, 2015Permit type: Intake | Permit status: Approved | Completion date: September 3, 2015 | Permit id: 2015-230993-000 | |||||
1-t ductless split, restroom exhaust to operate continuously during occupied hours. Date: November 3, 2015Permit type: Intake | Permit status: Closed | Completion date: November 3, 2015 | Permit id: 2015-259956-000 | |||||
Dfs for hollow core plank roof engineering Date: February 8, 2016Permit type: Application | Permit status: Approved | Completion date: December 18, 2015 | Permit id: 2014-176384-Dfs | |||||
Darigold- 4 amp service Date: April 7, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: November 3, 2015 | Permit id: 2015-146216-000 | |||||
Sa/st: 57 lf of 12 pvc combo main, (approx d=10), in se 6th ave contractor shall connect to existing st & sa branchs that wye at curb per std p-262 (approx l= and d=6) out of smh (aqt821). Contractor to verify all depths and locations in field. Contact x37869 Date: May 12, 2015Permit type: Intake | Permit status: Closed | Completion date: May 12, 2015 | Permit id: 2015-169554-000 | |||||
Hazardous-four-3 gallon tanks removed from facility by north star. Removed in 2014. Two tanks for sulfuric acid and two tanks for sodium hydroxide. Date: July 14, 2015Permit type: Intake | Permit status: Approved | Completion date: July 14, 2015 | Permit id: 2015-181416-000 | |||||
Hazardous-four temporary tanks are located onsite at the wastewater pre-treatment area. Tanks will be removed once the new building is complete. Date: December 3, 2015Permit type: Intake | Permit status: Approved | Completion date: August 24, 2015 | Permit id: 2015-182845-000 | |||||
Repair repalce leaking water service from meter to building. Date: July 29, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: July 31, 2015 | Permit id: 2015-208826-000 | |||||
Hazardous tank - installation of (2) new chemical tanks for the wastewater pre-treatment system. The 15 gal tanks to be installed outside building under a covered area. Tanks to contain chemicals used for ph neutralization of industrial wastewater Date: May 21, 2015Permit type: Intake | Permit status: Approved | Completion date: September 22, 2014 | Permit id: 2014-215855-000 | |||||
Sa st: 57 lf of 12 pvc combo main, (approx d=10), in se 6th ave contractor shall connect to existing st & sa branchs that wye at curb per std p-262 (approx l= and d=6) out of smh (aqt821). Contractor to verify all depths and locations in field. Contact x37869 Date: May 12, 2015Permit type: Intake | Permit status: Closed | Completion date: May 12, 2015 | Permit id: 2015-169554-000 | |||||
Hazardous-12,0 gallon ust at north end of facility (outside) was decommissioned in place by nrc environmentalwork don with out permit stu beutler Date: June 8, 2015Permit type: Intake | Permit status: Approved | Completion date: June 8, 2015 | Permit id: 2015-174158-000 | |||||
Equipment platform and tank foundation for condenser Date: September 18, 2007Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: January 10, 2008 | Current use: Factory/industrial | Permit id: 2007-136684-000 | |||||
New platforms and penthouse for new manufacturing equipment Date: May 17, 2002Permit type: Addition | Permit status: Final | Completion date: November 27, 2002 | Current use: Factory/industrial | Permit id: 2001-173794-000 |