Install 2 car chargers for volvo. Install 2 @ 2 pole amp ckts 270v single phase. As per code. Date: November 24, 2015 Value: $1,000Permit id: Com2015-27540 | |||||
Replace reznor duct furnace with same 300k btus 1 circuit as per code. Date: December 27, 2012 Value: $7,920Permit id: Com2012-25708 | |||||
Install emergency gas generator for security booth as per plans as per code. Date: May 28, 2009 Value: $5,000Permit id: Com2009-11001 | |||||
Provide the proper removal of (1) 5 0 gallon underground storage tank containing #2 fuel oil per code. Date: August 23, 2006 Value: $5,000Permit id: Com2006-25962 | |||||
Replace existing paint spray booth with a new paint spray booth garmat 30 series cabin. 998 with model 99373 heated air make up unit . Separate permit required for fire suppression system. Date: October 12, 2005 Value: $65,000Permit id: Com2005-24364 | |||||
Replaced existing sewer ejections pumps 2 each in pit in front of building 602a Date: June 29, 2005 Value: $12,000Permit id: Com2005-19023 | |||||
Provide new 1 amp sub panel. Wire 21 120volt motors. Wire 42 receptacles at gift wrap line and 25 low voltage drops as per code. Date: November 3, 2015 Value: $30,000Permit id: Com2015-26196 | |||||
Retrofit of existing sediment basin to swm pond as per plans as per code. Date: September 18, 2015 Value: $100,000Permit id: Com2015-18357 | |||||
Adding monitoring modules and water flow switches for connector bridge as per plans as per code. Date: July 15, 2015 Value: $2,584Permit id: Com2015-11776 | |||||
Use premises as a fulfillment center warehouse /office with conveyors for amazon. Com Date: June 29, 2015Permit id: Use2014-05225 | |||||
Conveyor installation (mechanical and electrical) as per plans and as per code. Separate electrical permit should be obtained for equipment marked as future. Date: March 11, 2015 Value: $7,000,000Permit id: Com2014-18100 | |||||
Installation of interior racks into an existing building as per plans as per code. Separate permits are required for sprinkler and fire alarm systems alterations. Date: February 24, 2015 Value: $969,622Permit id: Com2015-00729 | |||||
(use) use portion of premises as a warehouse with accessory offices with conveyors. Note that full use is from column lines ff. S to s. Balance of space is not fit-out and a separate use permit will be pulled for that space. Date: February 24, 2015Permit id: Use2015-00361 | |||||
Original permit description:(com2014-18837)installation of 2 sets of exterior faÒºade mounted channel letters and a monument sign as per plans and as per code. Date: November 17, 2014Permit id: Com2014-41773 | |||||
Amend permit 2013-1272 permit com2013-15395 issued 10/24/13: adds/alters office areas on interior of building and add/alters mezzanine layouts as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: November 5, 2014 Value: $250,000Permit id: Com2014-16065 | |||||
Installation of 2 sets of exterior faÒºade mounted channel letters and a monument sign as per plans and as per code. Date: November 5, 2014 Value: $8,155Permit id: Com2014-18837 | |||||
Use premises as fulfillment center for amazon (warehouse)o. K. For partial use of shell bldg only as a distribution center owner to submit a new use and occupancy permit for full use of bldg when interior robotic conveyer system is completed Date: October 22, 2014Permit id: Use2014-03829 | |||||
(2 applications submitted) construct a conveyor connector bridge to 5501 holabird ave (com2014-14991) as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: September 30, 2014 Value: $750,000Permit id: Com2014-14992 | |||||
Installing fire protection as per plans and as per code. Date: August 19, 2014 Value: $134,500Permit id: Com2014-10339 | |||||
Installation of (3) hydraulic elevator units (and components in shaft built by others) as per plans and as per code. Date: August 8, 2014 Value: $169,038Permit id: Com2014-15010 | |||||
Access system burglar alarm security system. 302 devices low voltage only. Not associated with fire alarm or sprinkler as per code. Date: July 11, 2014 Value: $300,000Permit id: Com2014-14272 | |||||
Installing fire protection under new process mezzanine and new 3 level pick modual as per plans and as per code. Date: April 29, 2014 Value: $1,000,000Permit id: Com2014-03863 | |||||
Access/ system burglar alarm security system install 6 devices low voltage only. Not associated with fire alarm or sprinkler as per code. Date: April 23, 2014 Value: $750,000Permit id: Com2014-08061 | |||||
Install fire alarm system in new one story building as per plans and as per code. Date: March 4, 2014 Value: $433,000Permit id: Com2014-00522 | |||||
Original permit description:(com2013-15395) construction of a new one story building warehouse/distribution center on a vacant lot as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. Date: December 3, 2013Permit id: Com2013-26077 | |||||
Amend permit#com2013-15395 issued on 10-24-13 w/plans#2013-1272 to add electrical contractor also amend to add the following additional work of 1 of conduit. Work done to code. Original permit description:(com2013-15395) construction of a new one story Date: November 19, 2013 Value: $1,500Permit id: Com2013-24927 | |||||
Setting of temporary office trailer ( x 137) for 6 months - the project duration as per drawings as per code. Electric by others Date: November 18, 2013 Value: $5,000Permit id: Com2013-23162 | |||||
Exterior work - install (1) #4 bare ground wire to 1/2 rebar for footer ground (cadweld) as per code. Date: November 6, 2013 Value: $250Permit id: Com2013-23447 | |||||
Construction of a new one story building warehouse/distribution center on a vacant lot as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. Date: October 24, 2013 Value: $100,000,000Permit id: Com2013-15395 | |||||
To install (1) 277v/480v 3phase 4w temp service for construction trailers (1) bg&e meter (1) 2 amp 480v w;p disconnect. Run overhead triplex wiring on 3 pole to sub panel & transformer location trans to be 1 kva w/ 5 amp 120/208 v 3 phase sub pan Date: October 16, 2013 Value: $20,000Permit id: Com2013-21177 | |||||
Install temporary office trailer (24 x 64) as per sketch as per code. Electric by others Date: September 27, 2013 Value: $20,000Permit id: Com2013-20620 | |||||
Exterior work: temporay trailer 60x12 less than 6 months as per sketch / code Date: September 26, 2013 Value: $10,000Permit id: Com2013-20238 | |||||
Partial permit subject to all conditions of agreement on file for grading only for a new warehouse pending action on application for plan 2013-1272 the issuance of the general permit and the understanding that the engineer/architect will comply with Date: September 10, 2013 Value: $171,144Permit id: Com2013-18970 | |||||
Electrical installation with structural review of the structure to carry the additional load of the solar system as per plans as per code. Date: September 7, 2016 Value: $980,000Expiration date: September 7, 2017 | Permit id: Com2016-15933 | |||||
Partial permit subject to all conditions of agreement on file for grading only for a new warehouse pending action on application for plan 2013-1272 the issuance of the general permit and the understanding that the engineer/architect will comply with the baltimore city building fire and related code 2013. Date: September 10, 2013 Value: $171,144Expiration date: September 10, 2014 | Permit id: Com2013-18970 | |||||
To install (1) 277v/480v 3phase 4w temp service for construction trailers (1) bg&e meter (1) 2 amp 480v w;p disconnect. Run overhead triplex wiring on 3 pole to sub panel & transformer location trans to be 1 kva w/ 5 amp 120/208 v 3 phase sub panel for wiring of trailers. Installing (1) 1 amp 1 phase feeds to double wide trailer installing (2) 1 volt amp 6ft recps as per code. Awc per planning: bottom of all panels need to be at least four feet of the ground. Date: October 16, 2013 Value: $20,000Expiration date: April 16, 2014 | Permit id: Com2013-21177 | |||||
Amend permit#com2013-15395 issued on 10-24-13 w/plans#2013-1272 to add electrical contractor also amend to add the following additional work of 1 of conduit. Work done to code. Original permit description:(com2013-15395) construction of a new one story building warehouse/distribution center on a vacant lot as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. Date: November 19, 2013 Value: $1,500Expiration date: October 24, 2015 | Permit id: Com2013-24927 | |||||
Installation of 2 sets of exterior faade mounted channel letters and a monument sign as per plans and as per code. Date: November 5, 2014 Value: $8,155Expiration date: May 5, 2015 | Permit id: Com2014-18837 | |||||
Original permit description:(com2014-18837)installation of 2 sets of exterior faade mounted channel letters and a monument sign as per plans and as per code. Date: November 17, 2014Expiration date: May 5, 2016 | Permit id: Com2014-41773 | |||||
Amend permit 2014-49 com2014-00522 for fire alarm as per plans as per code. Date: January 27, 2016 Value: $54,885Expiration date: January 27, 2017 | Permit id: Com2015-06377 | |||||
Amend permit com2016-10249 issued on 08/29/16 with plans #2016-859 to add plumber and hvac contractors as listed above.(original permit:com2016-10249:new construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code.)original permit description:(com2016-10249)new construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code. Date: September 23, 2016Expiration date: February 28, 2017 | Permit id: Com2016-24539 | |||||
Amend permit: change scope of work:18 voice and data outlets.(original permit:com2016-10249:new construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code.)original permit description:(com2016-10249)new construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code. Date: October 3, 2016Expiration date: February 28, 2017 | Permit id: Com2016-25434 | |||||
Relocate (17) add (7) fire sprinkler heads as per code no plans required as per code Date: September 27, 2016 Value: $4,800Expiration date: March 27, 2017 | Permit id: Com2016-24745 | |||||
Amend permit com2016-10249 issued on 08/29/16 with plans #2016-859 to add electrical contractor as listed above.(original permit:com2016-10249:new construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code.)original permit description:(com2016-10249)new construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code. Date: September 19, 2016Expiration date: February 28, 2017 | Permit id: Com2016-23891 | |||||
New construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code. Date: August 29, 2016 Value: $275,000Expiration date: February 28, 2017 | Permit id: Com2016-10249 | |||||
Amend permit # com2016-10249 issued on 08/29/16 to add the following additional work: adding (1) duct detector to existing fire alarm system as per code. Original permit description:(com2016-10249)new construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code. Date: October 11, 2016 Value: $3,000Expiration date: February 28, 2017 | Permit id: Com2016-25680 | |||||
Amend permit # com2016-10249 issued on 08 29 16 to add the following additional work: adding (1) duct detector to existing fire alarm system as per code. Original permit description:(com2016-10249)new construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code. Date: October 11, 2016 Value: $3,000Expiration date: February 28, 2017 | Permit id: Com2016-25680 | |||||
Amend permit: add contractor .(original permit:com2016-15933:electrical installation with structural review of the structure to carry the additional load of the solar system as per plans as per code.)original permit description:(com2016-15933)electrical installation with structural review of the structure to carry the additional load of the solar system as per plans as per code. Date: January 30, 2017Expiration date: September 7, 2017 | Permit id: Com2017-02268 | |||||
Use premises as a fulfillment center warehouse office with conveyors for amazon. Com Date: June 29, 2015Permit id: Use2014-05225 | |||||
Amend permit com2016-10249 issued on 08 29 16 with plans #2016-859 to add electrical contractor as listed above.(original permit:com2016-10249:new construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code.)original permit description:(com2016-10249)new construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code. Date: September 19, 2016Expiration date: February 28, 2017 | Permit id: Com2016-23891 | |||||
Amend permit com2016-10249 issued on 08 29 16 with plans #2016-859 to add plumber and hvac contractors as listed above.(original permit:com2016-10249:new construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code.)original permit description:(com2016-10249)new construction of 1 952 sq ft classroom inside existing amazon distribution center new partitions reflected ceiling work new finishes new rtu unit for space and minor plumbing as per plans as per code. Date: September 23, 2016Expiration date: February 28, 2017 | Permit id: Com2016-24539 | |||||
Install (14) # branch circuits feeders (7) # low voltage (1) # unclassified other work as per code. Date: October 18, 2017 Value: $10,000Expiration date: April 16, 2018 | Permit id: Com2017-63063 | |||||
Amend permit 2013-1272 permit com2013-15395 issued 10 24 13: adds alters office areas on interior of building and add alters mezzanine layouts as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: November 5, 2014 Value: $250,000Expiration date: November 5, 2015 | Permit id: Com2014-16065 | |||||
Partial permit subject to all conditions of agreement on file for grading only for a new warehouse pending action on application for plan 2013-1272 the issuance of the general permit and the understanding that the engineer architect will comply with the baltimore city building fire and related code 2013. Date: September 10, 2013 Value: $171,144Expiration date: September 10, 2014 | Permit id: Com2013-18970 | |||||
Exterior work: temporay trailer 60x12 less than 6 months as per sketch code Date: September 26, 2013 Value: $10,000Expiration date: March 26, 2014 | Permit id: Com2013-20238 | |||||
To install (1) 277v 480v 3phase 4w temp service for construction trailers (1) bg&e meter (1) 2 amp 480v w;p disconnect. Run overhead triplex wiring on 3 pole to sub panel & transformer location trans to be 1 kva w 5 amp 120 208 v 3 phase sub panel for wiring of trailers. Installing (1) 1 amp 1 phase feeds to double wide trailer installing (2) 1 volt amp 6ft recps as per code. Awc per planning: bottom of all panels need to be at least four feet of the ground. Date: October 16, 2013 Value: $20,000Expiration date: April 16, 2014 | Permit id: Com2013-21177 | |||||
Original permit description:(com2013-15395) construction of a new one story building warehouse distribution center on a vacant lot as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. Date: October 25, 2013Expiration date: October 24, 2015 | Permit id: Com2013-22866 | |||||
Exterior work - install (1) #4 bare ground wire to 1 2 rebar for footer ground (cadweld) as per code. Date: November 6, 2013 Value: $250Expiration date: May 6, 2014 | Permit id: Com2013-23447 | |||||
Amend permit#com2013-15395 issued on 10-24-13 w plans#2013-1272 to add electrical contractor also amend to add the following additional work of 1 of conduit. Work done to code. Original permit description:(com2013-15395) construction of a new one story building warehouse distribution center on a vacant lot as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. Date: November 19, 2013 Value: $1,500Expiration date: October 24, 2015 | Permit id: Com2013-24927 | |||||
Construction of a new one story building warehouse distribution center on a vacant lot as per plans as per code. Separate permit will be required for sprinkler system and fire alaram. Date: October 24, 2013 Value: $100,000,000Expiration date: October 24, 2015 | Permit id: Com2013-15395 | |||||
Access system burglar alarm security system install 6 devices low voltage only. Not associated with fire alarm or sprinkler as per code. Date: April 23, 2014 Value: $750,000Expiration date: October 23, 2014 | Permit id: Com2014-08061 |