ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 125a new electrical sub-panel has been added to relocate existing load from the main service panel to this sub-panel. A fee is added for misc. Electrical. Date: May 24, 2016Permit type: Residential alteration-addn | Permit status: Completed | Completion date: May 31, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: March 27, 2017Permit type: Addn | Permit status: Completed | Completion date: May 15, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: May 26, 2016Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. 125a new electrical sub-panel has been added to relocate existing load from the main service panel to this sub-panel. A fee is added for misc. Electrical. Date: May 24, 2016Permit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2016-Resalt- | |||||
SCORE 100 Hvac change out - package system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: March 27, 2017Permit type: Hvac change out | Permit status: Completed | Permit id: Pds2017-Resalt- |