ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Date: December 16, 2009Permit id: 09-12-080 | Parcel: 046631006000 | |||||
Date: January 18, 2011Permit id: 11-01-049 | Parcel: 046631006000 | |||||
Newport estates unit 4--install 3 4" water meter. Temporary water paid for six months from issuance date. Curb, gutter, sidewalks, driveways and any other frontage improvements damaged during home construction shall be removed and replaced or repaired to the satisfaction of the engineering inspector prior to permit final. Nsfd- 2747 574 47 plan# 1 lot# 302 (nport est.) Date: December 18, 2009Permit id: 09-0361 | Parcel: 046631006000 | |||||
SCORE 74 Pool- access is limited to site driveway. Soil relocation requires written permission from receiving location. A pre-inspection is required! All work shall comply with city standards and details. Final engineering encroachment inspection is required prior to building permit final inspection. Any damage to the curb, gutter, sidewalk or landscape will be repaired prior to finalization of encroachment permit and deposit refund. Any damage to the curb, gutter, sidewalk, tree or landscape will be Date: January 20, 2011 Contractor: Viking Pools Of SacramentoPermit id: 11-0013 | Parcel: 046631006000 | |||||
1. Install second driveway per detail 205. 2. All work within the right-of-way shall be constructed per state and federal accessibility standards. 3. A preconstruction meeting is required call (916) 617-4692. 4. All work shall comply with city standards and details. 5. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal condition or better. Date: September 7, 2011Permit id: 11-0185 | Parcel: 046631006000 |