ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Survey will be conducted to determine the pre-project and post-project ground surface elevations during the washington unified high school utility line construction. The location of the survey points is provided on the attached map. All work shall comply with city standards and details. Final engineering encroachment inspection is required. Permit renewed 2 8 08. Permit good thru 11 8 08. Date: November 8, 2006Permit id: 06-0850 |