ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
6 air handling units Date: October 13, 2006Permit status: Completed | Permit id: 06hvc0000000084 | |||||
Install fire alarm on 1st floor burch center enh Date: August 30, 2007Permit status: Issued | Permit id: 07fal0000000056 | |||||
4th floor d & t north icu expansion fire alarm upgrade Date: February 29, 2008Permit status: Issued | Permit id: 08fal0000000015 | |||||
Sprinkler heads in surgery & icu area, 3rd & 4th floor job # f-8498 Date: March 26, 2008Permit status: Issued | Permit id: 08fsp0000000012 | |||||
Install sprinklers heads in the environmental services at ev hosp. Date: April 9, 2008Permit status: Completed | Permit id: 08fsp0000000014 | |||||
Remodel basement environ services areas Date: January 24, 2008Permit status: Completed | Permit id: 08int0000000012 | |||||
Remodel pain clinic - 3rd floor Date: April 2, 2008Permit status: Issued | Permit id: 08int0000000048 | |||||
6 air handling units Date: January 20, 2009Permit status: Completed | Permit id: 06hvc0000000084 | |||||
Install fire alarm on 1st floor burch center enh Date: December 11, 2008Permit status: Issued | Permit id: 07fal0000000056 | |||||
4th floor d & t north icu expansion / fire alarm upgrade Date: July 31, 2008Permit status: Issued | Permit id: 08fal0000000015 | |||||
Sprinkler heads in surgery & icu area, 3rd & 4th floor / job # f-8498 Date: June 20, 2008Permit status: Issued | Permit id: 08fsp0000000012 | |||||
Construction fence Date: August 5, 2008Permit type: Building/fence | Permit status: Issued | Permit id: 08fnce-0202 | |||||
Fire alarm work Date: May 29, 2008Permit type: Building/fire alarm | Permit status: Completed | Permit id: 08falm-0009 | |||||
Fire alarm work Date: May 29, 2008Permit type: Building/fire alarm | Permit status: Issued | Permit id: 08falm-0010 | |||||
Campus fire alarm upgrades Date: June 26, 2008Permit type: Building/fire alarm | Permit status: Issued | Permit id: 08falm-0016 | |||||
Fire alarm system replacement Date: November 4, 2008Permit type: Building/fire alarm | Permit status: Issued | Permit id: 08falm-0050 | |||||
Fourth floor center building remodel Date: November 5, 2008Permit type: Building/remodel/int | Permit status: Issued | Permit id: 08intr-0241 | |||||
Replace one ahu Date: July 8, 2008Permit type: Building/hvac work o | Permit status: Issued | Permit id: 08hvac-0034 | |||||
Add 4 duct smoke detectors with test station modles & 7 data transmit unit relays. Date: February 28, 2014Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 14falm-0014 | |||||
Addition of heat & smoke detection, sprinkler monitoring & elevator control of existing system Date: January 15, 2013Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 13falm-0007 | |||||
Relocate existing sprinklers Date: June 2, 2010Permit type: Building/fire suppre | Permit status: Issued | Permit id: 10frsp-0024 | |||||
Furnish and install 6 backflow prevention devices in the autopsy lab Date: December 23, 2014Permit type: Building/cccd | Permit status: Completed | Current use: Commercial | Permit id: 14cccd-0203 | |||||
Install new mri room Date: June 13, 2012Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 12intr-0229 | |||||
Extension relocation of existing fire alarm devices Date: January 14, 2009Permit type: Building/fire alarm | Permit status: Issued | Permit id: 09falm-0002 | |||||
Extension relocation of existing fire alarm devices Date: March 12, 2009Permit type: Building/fire alarm | Permit status: Issued | Permit id: 09falm-0014 | |||||
Extension relocation of new existing fire alarm devices. Date: April 10, 2009Permit type: Building/fire alarm | Permit status: Issued | Permit id: 09falm-0020 | |||||
Install new frie protection system Date: February 9, 2009Permit type: Building/fire suppre | Permit status: Issued | Permit id: 09frsp-0009 | |||||
Relocate 9 sprinkler heads Date: March 13, 2009Permit type: Building/fire suppre | Permit status: Issued | Permit id: 09frsp-0017 | |||||
Installing 24 sprinkler heads Date: April 27, 2009Permit type: Building/fire suppre | Permit status: Issued | Permit id: 09frsp-0023 | |||||
Installing 66 sprinkler heads Date: May 15, 2009Permit type: Building/fire suppre | Permit status: Issued | Permit id: 09frsp-0030 | |||||
Installing 7 sprinkler heads Date: May 18, 2009Permit type: Building/fire suppre | Permit status: Issued | Permit id: 09frsp-0031 | |||||
Install new sprinklers into existing space including new control valve & flow switch Date: October 20, 2009Permit type: Building/fire suppre | Permit status: Issued | Permit id: 09frsp-0058 | |||||
Deans office renovation Date: February 17, 2009Permit type: Building/remodel/int | Permit status: Completed | Permit id: 09intr-0019 | |||||
Interior remodel, mammography buildout 1st floor south building Date: February 23, 2009Permit type: Building/remodel/int | Permit status: Issued | Permit id: 09intr-0023 | |||||
Room g4 remodel for new outpatient pharmacy Date: April 27, 2009Permit type: Building/remodel/int | Permit status: Completed | Permit id: 09intr-0059 | |||||
Remodel room g208 Date: September 17, 2009Permit type: Building/remodel/int | Permit status: Issued | Permit id: 09intr-0215 | |||||
Build out shell space in kellogg cancer center 2nd floor oncology offices including 2nd floor build-out Date: October 21, 2009Permit type: Building/remodel/int | Permit status: Completed | Permit id: 09intr-0251 | |||||
Replace comed switchgear Date: October 18, 2010Permit type: Building/electrical | Permit status: Closed | Permit id: 10elec-0233 | |||||
Renovation of elevator 20-fire alarm Date: April 12, 2010Permit type: Building/fire alarm | Permit status: Issued | Permit id: 10falm-0012 | |||||
Renovation - fire alarm Date: April 12, 2010Permit type: Building/fire alarm | Permit status: Issued | Permit id: 10falm-0013 | |||||
Modifications to fire alarm system Date: September 13, 2010Permit type: Building/fire alarm | Permit status: Issued | Permit id: 10falm-0031 | |||||
Fire alarm work Date: September 17, 2010Permit type: Building/fire alarm | Permit status: Issued | Permit id: 10falm-0032 | |||||
Fire alarm expansion Date: November 9, 2010Permit type: Building/fire alarm | Permit status: Issued | Permit id: 10falm-0039 | |||||
Add relocate sprinkler heads for 4th flr build out Date: February 8, 2010Permit type: Building/fire suppre | Permit status: Issued | Permit id: 10frsp-0006 | |||||
Relocate existing heads to conform to new wall layouts Date: June 2, 2010Permit type: Building/fire suppre | Permit status: Issued | Permit id: 10frsp-0025 | |||||
Relocate existing sprinkler heads to new floor plan Date: September 7, 2010Permit type: Building/fire suppre | Permit status: Issued | Permit id: 10frsp-0046 | |||||
Relocate existing sprinkler heads Date: October 28, 2010Permit type: Building/fire suppre | Permit status: Issued | Permit id: 10frsp-0056 | |||||
Relocate existing sprinkler heads Date: October 28, 2010Permit type: Building/fire suppre | Permit status: Issued | Permit id: 10frsp-0057 | |||||
Build out medical office space searle bldg bsmt flr searle products room renovation Date: May 24, 2010Permit type: Building/remodel/int | Permit status: Completed | Permit id: 10intr-0157 | |||||
Cstar misti lab and conference center remodel Date: September 16, 2010Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 10intr-0305 | |||||
1st floor searle bldg - interior renovation of existing shell space to create a new freezer storage & lab room Date: September 24, 2010Permit type: Building/remodel/int | Permit status: Completed | Permit id: 10intr-0313 | |||||
Interior remodel two walls added Date: October 25, 2010Permit type: Building/remodel/int | Permit status: Issued | Permit id: 10intr-0352 | |||||
Rpz installation Date: March 11, 2010Permit type: Building/plumbing on | Permit status: Issued | Permit id: 10plmb-0045 | |||||
Installing (1) set of halo illuminated letters on copper background panel. Date: March 15, 2010Permit type: Building/sign-awning | Permit status: Issued | Permit id: 10sgna-0025 | |||||
Fire alarm work Date: October 14, 2011Permit type: Building/fire alarm | Permit status: Issued | Permit id: 11falm-0050 | |||||
Installing 2 smokes & 2 strobes into an existing system due to renovation Date: October 25, 2011Permit type: Building/fire alarm | Permit status: Issued | Permit id: 11falm-0054 | |||||
Relocate and install new fire alarm system and add a few devices to existing fire alarm system Date: December 14, 2011Permit type: Building/fire alarm | Permit status: Issued | Permit id: 11falm-0061 | |||||
Installation of 14 concealed type sprinkler heads from existing piping. Date: April 20, 2011Permit type: Building/fire suppre | Permit status: Issued | Permit id: 11frsp-0013 | |||||
Relocate existing sprinklers for new wall layout Date: October 10, 2011Permit type: Building/fire suppre | Permit status: Issued | Permit id: 11frsp-0059 | |||||
Relocate existing heads to conform to new wall layout Date: October 19, 2011Permit type: Building/fire suppre | Permit status: Issued | Permit id: 11frsp-0060 | |||||
Relocate existing heads to accomodate new wall layout Date: October 24, 2011Permit type: Building/fire suppre | Permit status: Issued | Permit id: 11frsp-0064 | |||||
Relocate add heads per re-design of patient rooms Date: December 15, 2011Permit type: Building/fire suppre | Permit status: Issued | Permit id: 11frsp-0069 | |||||
Renovate existing patient rooms on 3rd floor south building to create offices Date: March 4, 2011Permit type: Building/remodel/int | Permit status: Completed | Permit id: 11intr-0064 | |||||
Interior remodel modification of the g. I. Lab, south bldg Date: July 19, 2011Permit type: Building/remodel/int | Permit status: Completed | Permit id: 11intr-0227 | |||||
Build-out 3rd floor kellogg Date: September 12, 2011Permit type: Building/remodel/int | Permit status: Completed | Permit id: 11intr-0304 | |||||
Interior renovation of existing patient rooms within evanston hospital - 4th floor south building, painting, flooring replacement, minor demolition, mechanical upgrades, etc. Date: November 4, 2011Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 11intr-0369 | |||||
Rpz installation - 1-10", 2-8", 1-6" & 4-4" (fire) Date: March 2, 2011Permit type: Building/plumbing on | Permit status: Completed | Permit id: 11plmb-0039 | |||||
Rpz installation Date: January 12, 2012Permit type: Building/cccd | Permit status: Issued | Current use: Commercial | Permit id: 12cccd-0005 | |||||
Replace 1 rpz to autopsy table. Add 1 rpz to same. Date: March 5, 2012Permit type: Building/cccd | Permit status: Completed | Current use: Commercial | Permit id: 12cccd-0030 | |||||
Cccd Date: April 16, 2012Permit type: Building/cccd | Permit status: Completed | Current use: Commercial | Permit id: 12cccd-0057 | |||||
Fire alarm expansion Date: February 10, 2012Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 12falm-0006 | |||||
Fire alarm modification Date: March 13, 2012Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 12falm-0020 | |||||
Provide detection & notification Date: March 22, 2012Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 12falm-0025 | |||||
Provide adequate notification coverage in remodeled area Date: April 17, 2012Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 12falm-0031 | |||||
Provide notification coverage in remodeled area. Date: June 20, 2012Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 12falm-0058 | |||||
Fence Date: October 4, 2012Permit type: Building/fence | Permit status: Issued | Current use: Commercial | Permit id: 12fnce-0234 | |||||
Relocate add sprinkler heads to conform to new layout. Date: March 13, 2012Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 12frsp-0015 | |||||
Installation of 8 sprinkler heads Date: June 19, 2012Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 12frsp-0051 | |||||
Relocate sprinkler heads to new wall & ceiling layout Date: June 21, 2012Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 12frsp-0053 | |||||
Installation of sprinkler heads Date: November 14, 2012Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 12frsp-0102 | |||||
Interior renovation of new fluroscopy equipment ro0m g932 Date: January 9, 2012Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 12intr-0010 | |||||
Installation of new ct equipment in room g925 Date: January 20, 2012Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 12intr-0031 | |||||
Interior build out and remodel of the multimedia remote studio Date: February 16, 2012Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 12intr-0059 | |||||
Ct simulator replacement - ground floor north building, room g316 Date: April 3, 2012Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 12intr-0118 | |||||
Upgrade to isolation room - ground floor and first floor Date: May 8, 2012Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 12intr-0172 | |||||
Elevator modernization c=. F. E. & dietry Date: October 1, 2012Permit type: Building/remodel/int | Permit status: Issued | Current use: Commercial | Permit id: 12intr-0407 | |||||
Remove pavers in courtyard and water proof and install roof system Date: November 12, 2012Permit type: Building/roofing | Permit status: Issued | Current use: Commercial | Permit id: 12roof-0392 | |||||
Addition of smoke & heat detection, sprinkler monitoring & elevator control to existing system Date: January 15, 2013Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 13falm-0006 | |||||
Addition of smoke & heat detection,spinkler monitoring & elevator control to existing system Date: January 15, 2013Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 13falm-0008 | |||||
Addition of strobe to ir lab Date: September 18, 2013Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 13falm-0105 | |||||
Elevator upgrade Date: December 19, 2013Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 13falm-0128 | |||||
Elevator upgrade Date: December 19, 2013Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 13falm-0129 | |||||
Elevator upgrades Date: December 19, 2013Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 13falm-0130 | |||||
Installation of 4 sprinkler heads Date: January 25, 2013Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 13frsp-0003 | |||||
Installation of sprinkler heads Date: January 25, 2013Permit type: Building/fire suppre | Permit status: Review | Current use: Commercial | Permit id: 13frsp-0005 | |||||
Installation of 9 sprinkler heads Date: January 25, 2013Permit type: Building/fire suppre | Permit status: Review | Current use: Commercial | Permit id: 13frsp-0006 | |||||
Install 3 sprinkler heads Date: September 27, 2013Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 13frsp-0077 | |||||
Replace existing air handline unit, provide temporary air handling unit during construciotn, then remove. Date: October 22, 2013Permit type: Building/hvac work o | Permit status: Issued | Current use: Commercial | Permit id: 13hvac-0116 | |||||
Replacement of existing interventional radiation equipment with new Date: June 21, 2013Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 13intr-0274 | |||||
Replace existing instrument and cart washing equipment within the central sterile supply -- mechanical upgrades required to accomodate new equipment Date: November 22, 2013Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 13intr-0490 | |||||
Repair parapet wall on one of the hospitals lower roofs Date: April 16, 2013Permit type: Building/minor repai | Permit status: Issued | Current use: Commercial | Permit id: 13mrpr-0008 | |||||
Elevator modernization 2. 3. 4. 5. 13. 18. 19 Date: January 22, 2013Permit type: Building/miscellaneo | Permit status: Issued | Current use: Commercial | Permit id: 13mswk-0005 | |||||
Piping to relocate mag meter, 6" meter, install spool Date: February 25, 2013Permit type: Building/plumbing on | Permit status: Issued | Current use: Commercial | Permit id: 13plmb-0043 | |||||
Run a 1" d & c portable hot water loop Date: August 20, 2013Permit type: Building/plumbing on | Permit status: Issued | Current use: Commercial | Permit id: 13plmb-0231 | |||||
Relocate mag meter & gate valve, remove 6 meter, install spool Date: February 25, 2013Permit type: Building/water and s | Permit status: Issued | Current use: Commercial | Permit id: 13wsrp-0006 | |||||
Replace 3 rpzs to equipment washers and 1 to di system Date: February 4, 2014Permit type: Building/cccd | Permit status: Issued | Current use: Commercial | Permit id: 14cccd-0010 | |||||
Replace rpz that is feeding chiller Date: March 27, 2014Permit type: Building/cccd | Permit status: Completed | Current use: Commercial | Permit id: 14cccd-0028 | |||||
Addition of 5 strobes, 6 chimes, 2 smoke detectors Date: January 30, 2014Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 14falm-0004 | |||||
Replacement of 3 duct smoke detectors Date: March 27, 2014Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 14falm-0024 | |||||
Fire alarm remodel Date: June 6, 2014Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 14falm-0052 | |||||
Fire alarm addition Date: July 28, 2014Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 14falm-0069 | |||||
Fire alarm Date: July 30, 2014Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 14falm-0071 | |||||
Fire alarm Date: July 30, 2014Permit type: Building/fire alarm | Permit status: Completed | Current use: Commercial | Permit id: 14falm-0072 | |||||
Re-modeling existing fire alarm system to fit new floor plan layout. Date: November 20, 2014Permit type: Building/fire alarm | Permit status: Completed | Current use: Commercial | Permit id: 14falm-0101 | |||||
Installing 71 sprinkler heads Date: March 21, 2014Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 14frsp-0018 | |||||
Install 24 sprinkler heads Date: March 24, 2014Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 14frsp-0019 | |||||
Installing 6 sprinkler heads Date: March 27, 2014Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 14frsp-0020 | |||||
Installing 19 sprinkler heads Date: March 27, 2014Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 14frsp-0021 | |||||
Install 44 sprinkler heads Date: July 2, 2014Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 14frsp-0042 | |||||
Install 19 sprinkler heads Date: July 16, 2014Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 14frsp-0051 | |||||
Replace ahu and provide temporary during construction Date: March 28, 2014Permit type: Building/hvac work o | Permit status: Issued | Current use: Commercial | Permit id: 14hvac-0026 | |||||
Renovate storage area in l2 level of garage Date: February 14, 2014Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 14intr-0057 | |||||
Construct autopsy suite in existing storage area Date: March 5, 2014Permit type: Building/remodel/int | Permit status: Issued | Current use: Commercial | Permit id: 14intr-0072 | |||||
Elevator modernization of elevators: g, j, k and burch. Date: April 11, 2014Permit type: Building/remodel/int | Permit status: Issued | Current use: Commercial | Permit id: 14intr-0128 | |||||
X-ray room #4 remodel. Date: May 9, 2014Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 14intr-0166 | |||||
Remodel microbiology lab for installation of new equip. Date: May 19, 2014Permit type: Building/remodel/int | Permit status: Issued | Current use: Commercial | Permit id: 14intr-0187 | |||||
Interior remodel - flooring, wall coverings and millwork Date: July 16, 2014Permit type: Building/remodel/int | Permit status: Issued | Current use: Commercial | Permit id: 14intr-0289 | |||||
Renovation of the emergency department. Date: October 7, 2014Permit type: Building/remodel/int | Permit status: Issued | Current use: Commercial | Permit id: 14intr-0414 | |||||
Histology and blood bank renovation Date: December 8, 2014Permit type: Building/remodel/int | Permit status: Issued | Current use: Commercial | Permit id: 14intr-0494 | |||||
Modernization of 6 elevators gg--7 burch 121, j24-25 k26-27 (7) total Date: January 24, 2014Permit type: Building/miscellaneo | Permit status: Issued | Current use: Commercial | Permit id: 14mswk-0005 | |||||
Install one rpz to di system Date: February 16, 2015Permit type: Building/cccd | Permit status: Completed | Current use: Commercial | Permit id: 15cccd-0012 | |||||
Fire alarm Date: January 23, 2015Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 15falm-0005 | |||||
Fire alarm upgrade Date: March 9, 2015Permit type: Building/fire alarm | Permit status: Issued | Current use: Commercial | Permit id: 15falm-0028 | |||||
Add relocate fire sprinkler heads Date: January 8, 2015Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 15frsp-0001 | |||||
Sprinkler relocates Date: January 29, 2015Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 15frsp-0009 | |||||
Relocating 7 existing sprinkler heads Date: April 9, 2015Permit type: Building/fire suppre | Permit status: Issued | Current use: Commercial | Permit id: 15frsp-0041 | |||||
Interior remodel/modification of the g. I. Lab, south bldg Date: February 7, 2012Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 11intr-0227 | |||||
Rpz installation - 1-10", 2-8", 1-6" & 4-4" (fire) Date: February 28, 2013Permit type: Building/plumbing only | Permit status: Completed | Permit id: 11plmb-0039 | |||||
Histology and blood bank renovation Date: February 5, 2015Permit type: Building/remodel/interior only | Permit status: Issued | Permit id: 14intr-0494 | |||||
1st floor searle bldg - interior renovation of existing shell space to create a new freezer storage & lab room Date: July 19, 2011Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 10intr-0313 | |||||
Extension/relocation of existing fire alarm devices Date: April 3, 2009Permit type: Building/fire alarm | Permit status: Issued | Permit id: 09falm-0014 | |||||
Add/relocate fire sprinkler heads Date: January 12, 2015Permit type: Building/fire suppression | Permit status: Issued | Permit id: 15frsp-0001 | |||||
Relocate/add heads per re-design of patient rooms Date: December 20, 2011Permit type: Building/fire suppression | Permit status: Issued | Permit id: 11frsp-0069 | |||||
Build out shell space in kellogg cancer center 2nd floor oncology offices including 2nd floor build-out Date: August 14, 2012Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 09intr-0251 | |||||
Room g4 remodel for new outpatient pharmacy Date: August 14, 2012Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 09intr-0059 | |||||
Re-modeling existing fire alarm system to fit new floor plan layout. Date: April 2, 2015Permit type: Building/fire alarm | Permit status: Completed | Permit id: 14falm-0101 | |||||
Fire alarm Date: March 16, 2015Permit type: Building/fire alarm | Permit status: Completed | Permit id: 14falm-0072 | |||||
Renovate storage area in l2 level of garage Date: January 15, 2015Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 14intr-0057 | |||||
Extension/relocation of new/existing fire alarm devices. Date: May 4, 2009Permit type: Building/fire alarm | Permit status: Issued | Permit id: 09falm-0020 | |||||
Elevator upgrades Date: January 28, 2014Permit type: Building/fire alarm | Permit status: Issued | Permit id: 13falm-0130 | |||||
Cstar/misti lab and conference center remodel Date: August 14, 2012Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 10intr-0305 | |||||
Upgrade to isolation room - ground floor and first floor Date: February 20, 2013Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 12intr-0172 | |||||
Replace existing instrument and cart washing equipment within the central sterile supply -- mechanical upgrades required to accomodate new equipment Date: February 6, 2015Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 13intr-0490 | |||||
Elevator upgrade Date: January 28, 2014Permit type: Building/fire alarm | Permit status: Issued | Permit id: 13falm-0128 | |||||
Elevator upgrade Date: January 28, 2014Permit type: Building/fire alarm | Permit status: Issued | Permit id: 13falm-0129 | |||||
Relocate/add sprinkler heads to conform to new layout. Date: March 19, 2012Permit type: Building/fire suppression | Permit status: Issued | Permit id: 12frsp-0015 | |||||
Install new mri room Date: January 29, 2013Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 12intr-0229 | |||||
Extension/relocation of existing fire alarm devices Date: April 3, 2009Permit type: Building/fire alarm | Permit status: Issued | Permit id: 09falm-0002 | |||||
Replace comed switchgear Date: February 25, 2011Permit type: Building/electrical only | Permit status: Closed | Permit id: 10elec-0233 | |||||
Interior renovation of existing patient rooms within evanston hospital - 4th floor south building, painting, flooring replacement, minor demolition, mechanical upgrades, etc. Date: May 22, 2012Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 11intr-0369 | |||||
Renovate existing patient rooms on 3rd floor south building to create offices Date: February 28, 2013Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 11intr-0064 | |||||
Installing 2 smokes & 2 strobes into an existing system due to renovation Date: April 24, 2012Permit type: Building/fire alarm | Permit status: Issued | Permit id: 11falm-0054 | |||||
Add/relocate sprinkler heads for 4th flr build out Date: February 12, 2010Permit type: Building/fire suppression | Permit status: Issued | Permit id: 10frsp-0006 | |||||
Fire alarm system replacement Date: August 27, 2009Permit type: Building/fire alarm | Permit status: Issued | Permit id: 08falm-0050 | |||||
Furnish and install 6 backflow prevention devices in the autopsy lab Date: January 7, 2015Permit type: Building/cccd | Permit status: Completed | Permit id: 14cccd-0203 | |||||
Build out medical office space searle bldg bsmt flr searle products room renovation Date: August 15, 2012Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 10intr-0157 | |||||
Remove & install new linear accelerator Date: October 13, 2008Permit type: Building/remodel/int | Permit status: Issued | Permit id: 08intr-0220 | |||||
Install stop geared traction passenger elevator car #10 Date: April 29, 2008Permit type: Building/elevator | Permit status: Review | Permit id: 08elev-0003 | |||||
Interior remodel - residents lounge rm. 0235 Date: May 12, 2009Permit type: Building/remodel/int | Permit status: Completed | Permit id: 09intr-0076 | |||||
Interior remodel - residents lounge rm. 0235 Date: February 25, 2011Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 09intr-0076 | |||||
Equipment replacement in the radiosurgery suite - ground floor - north building Date: January 11, 2010Permit type: Building/remodel/int | Permit status: Completed | Permit id: 10intr-0004 | |||||
Equipment replacement in the radiosurgery suite - ground floor - north building Date: August 14, 2012Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 10intr-0004 | |||||
Build out open office space 4th floor Date: February 8, 2010Permit type: Building/remodel/int | Permit status: Completed | Permit id: 10intr-0025 | |||||
Build out open office space 4th floor Date: August 14, 2012Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 10intr-0025 | |||||
Psychiatric unit office renovation - 5th floor south center - louis bldg Date: March 31, 2010Permit type: Building/remodel/int | Permit status: Issued | Permit id: 10intr-0093 | |||||
Psychiatric unit/ office renovation - 5th floor south + center - louis bldg Date: May 14, 2010Permit type: Building/remodel/interior only | Permit status: Issued | Permit id: 10intr-0093 | |||||
Interior remodel - installation of new medical equipment - nuclear camera Date: November 16, 2011Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 11intr-0385 | |||||
Interior remodel - installation of new medical equipment - nuclear camera Date: April 17, 2012Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 11intr-0385 | |||||
Interior remodel - installation of new medical equipment - nuclear camera Date: November 16, 2011Permit type: Building/remodel/int | Permit status: Completed | Current use: Commercial | Permit id: 11intr-0386 | |||||
Interior remodel - installation of new medical equipment - nuclear camera Date: February 29, 2012Permit type: Building/remodel/interior only | Permit status: Completed | Permit id: 11intr-0386 |