ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Robert weed Date: December 30, 2005Permit status: Issued | Permit id: 05-06282 | |||||
Date: August 22, 2007Permit status: Closed | Permit id: 02-04924 | |||||
Comment date: tue oct 29 00:00: est 2002 - applicant has been informed to discuss on street parkinf with the engineering department. Pmd weed residence - placement of existing stick built home. Pmd; c Value: $15,000Client: Weed Residence | Permit type: Res: new | Permit status: Closed | Current use: Residential | Permit id: 02-04924 | Parcel: 23695 | |||||
SCORE 56 Robert weed Client: Robert Weed | Permit type: Res: demolition | Permit status: Expired | Current use: Residential | Permit id: 05-06282 | Parcel: 23695 | |||||
Joyner avenue (robert weed) Client: Recombination | Permit type: Minor subdivision | Permit status: Under review | Current use: Subdivision | Permit id: 03-61000117pz | |||||
Applicant has been informed to discuss on street parkinf with the engineering department. Pmd weed residence - placement of existing stick built home. Pmd; one off-street parking space will be provided on site by owner.; recd amendment for footings. Pmd; 8/4/03 12:09:33 pm ammendment- foundation permit only. Lcs; driveway applicant wants to park on street. Checking on that. Ars 10/31/02 ; setbacks along streets must be measured from the street right of way line. All other setbacks are to be measured from the property boundary lines. Setbacks also apply to porches, decks, etc.; grading approved for a wavier of grading permit. If the inspector feels that there is a problem arising from the work being done, he will require erosion control measures and possibly a permit if scope exceeds what was stated on the application. Ars 1 Permit type: Res: new | Permit status: Closed | Permit id: 02-04924 | Parcel: 23695 | |||||
Applicant has been informed to discuss on street parkinf with the engineering department. Pmd weed residence - placement of existing stick built home. Pmd; c Date: August 22, 2007 Value: $15,000Client: Weed Residence | Permit type: Res: new | Permit status: Closed | Current use: Residential | Permit id: 02-04924 | Parcel: 23695 | |||||
Joyner avenue (robert weed) Date: July 11, 2003Client: Recombination | Permit type: Minor subdivision | Permit status: Under review | Current use: Subdivision | Permit id: 03-61000117pz | |||||
Robert weed Date: December 30, 2005 Value: $12,000Permit type: Residential | Permit status: Issued | Permit id: 05-06282 | |||||
Residential Date: August 22, 2007 Value: $15,000Permit status: Closed | Permit id: 02-04924 | |||||
Applicant has been informed to discuss on street parkinf with the engineering department. Pmd weed residence - placement of existing stick built home. Pmd; one off-street parking space will be provided on site by owner.; recd amendment for footings. Pmd; 8 4 03 12:09:33 pm ammendment- foundation permit only. Lcs; driveway applicant wants to park on street. Checking on that. Ars 10 31 02 ; setbacks along streets must be measured from the street right of way line. All other setbacks are to be measured from the property boundary lines. Setbacks also apply to porches, decks, etc.; grading approved for a wavier of grading permit. If the inspector feels that there is a problem arising from the work being done, he will require erosion control measures and possibly a permit if scope exceeds what was stated on the application. Ars 1 Date: August 22, 2007Permit type: Res: new | Permit status: Closed | Permit id: 02-04924 | Parcel: 23695 |