ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Apt # 3 >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> at boiler room at cellar, make all necessary repairs the burnham #2 oil-fire steam Date: December 17, 2015Permit type: Heat | Permit id: Eg09239 | |||||
Please meet hpd team at building 2. Pm 1/04/2012 to restore heat to the building. Boiler is running but producing hot water only. Make neccessary r Date: January 5, 2012Permit type: Heat | Permit id: Ec16997 | |||||
Boiler room: make repairs to no. 2 oil boiler to restore to proper working order. Restore heat and hot water to adequate level. Remove all work rel Date: December 10, 2009Permit type: Heat | Permit id: Ea18239 | |||||
As per rc #20080000875 (i. A. T. L.), perform total lead analysis of 08 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 m Date: July 12, 2007Permit type: Delead | Permit id: E801204 | |||||
At apt# 3 properly repair the defective ceramic tile floor (approx 4 sq. Ft) with simiklar type ceramic floor tiles including grouting. Alternativ Date: November 21, 2016Permit type: Gc | Permit id: Eh06697 | |||||
Please meet hpd team at building 2. Pm 1 04 2012 to restore heat to the building. Boiler is running but producing hot water only. Make neccessary r Date: January 5, 2012Permit type: Heat | Permit id: Ec16997 | |||||
Make all necessary repairs to electric supply service & points to restore electricity to the entire apartment 1l, 2nd story. Alternative enforcemen Date: December 22, 2008Permit type: Elec | Permit id: E919072 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: July 31, 2009Permit type: Gc | Permit id: Ea04920 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: January 12, 2010Permit type: Gc | Permit id: Ea20686 | |||||
Cellar: make all necessary repair (to #2 oil boiler) to supply adequate heat and hot water in enitre building. Note: field dimension and qua Date: November 14, 2011Permit type: Heat | Permit id: Ec12764 | |||||
Apt#2: apt# 3, apt#6 requirment contractor: bijoy construction corp. Contract no: 2012140666402 Permit type: Gc | Permit id: Ec20733 | |||||
Apt#2: apt# 3, apt#6 requirment contractor: bijoy construction corp. Contract no: 2012140666402 Permit type: Gc | Permit id: Ec20733 | |||||
Apt#2: apt# 3, apt#6 requirment contractor: bijoy construction corp. Contract no: 2012140666402 Permit type: Gc | Permit id: Ec20733 | |||||
Apt#2: apt# 3, apt#6 requirment contractor: bijoy construction corp. Contract no: 2012140666402 Permit type: Gc | Permit id: Ec20733 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: January 12, 2010Permit type: Gc | Permit id: Ea20686 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: July 29, 2009Permit type: Plumb | Permit id: Ea04913 | |||||
Apt#2: apt# 3, apt#6 requirment contractor: bijoy construction corp. Contract no: 2012140666402 Permit type: Gc | Permit id: Ec20733 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: May 26, 2010Permit type: Plumb | Permit id: Ea34673 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: December 29, 2009Permit type: Plumb | Permit id: Ea16543 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Permit type: Gc | Permit id: Ea34726 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Permit type: Gc | Permit id: Ea34726 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Permit type: Gc | Permit id: Ea34726 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Permit type: Gc | Permit id: Ea34726 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: December 29, 2009Permit type: Plumb | Permit id: Ea16543 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: May 26, 2010Permit type: Plumb | Permit id: Ea34673 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Permit type: Gc | Permit id: Ea34726 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: March 17, 2014Permit type: Delead | Permit id: Ee19065 | |||||
Provide single drop 5 gl,#2 fuel p/s boiler. Date: May 2, 2000Permit type: Util | Permit id: E021189 | |||||
Apt 1: as per the requirements contract with hpd, provide and install (2) window guard replace (6) and repair (1) throughout entire apartment. T Date: March 7, 2012Permit type: Gc | Permit id: Ec21909 | |||||
Apt#1: requirment contractor: bijoy construction corp. Contract no: 2012140666402 1] supply and in Permit type: Gc | Permit id: Ec20731 | |||||
Disconnect wiring to old thermostat and install new thermostat with lock box in the basement near the hatch entrace to the cellar . Give keys to hpd in Date: November 30, 2012Permit type: Heat | Permit id: Ed11169 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: July 29, 2010Permit type: Gc | Permit id: Ea34603 | |||||
Provide single fuel drop with prime and start #2ulsh fuel fill tank. Please report any problems immediately to esb fuel unit (212) 863-8781 Date: November 16, 2012Permit type: Util | Permit id: Ed10372 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: July 20, 2009Permit type: Gc | Permit id: Ea03770 | |||||
Make all necessary repairs to oil boiler to restore heat to the building. Alternative enforcement program note: contractor must contact hpd @ (212 Date: November 16, 2012Permit type: Heat | Permit id: Ed10355 | |||||
Apt#1: requirment contractor: bijoy construction corp. Contract no: 2012140666402 1] supply and in Permit type: Gc | Permit id: Ec20731 | |||||
Apt#1: requirment contractor: bijoy construction corp. Contract no: 2012140666402 1] supply and in Permit type: Gc | Permit id: Ec20731 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: July 20, 2009Permit type: Gc | Permit id: Ea03770 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: July 29, 2010Permit type: Gc | Permit id: Ea34603 | |||||
Apt#1: requirment contractor: bijoy construction corp. Contract no: 2012140666402 1] supply and in Permit type: Gc | Permit id: Ec20731 | |||||
Provide single drop 5 gl,#2 fuel p s boiler. Date: May 2, 2000Permit type: Util | Permit id: E021189 | |||||
Apt#1: requirment contractor: bijoy construction corp. Contract no: 2012140666402 1] supply and in Permit type: Gc | Permit id: Ec20731 | |||||
Provide single fuel drop. 10 gallons, #2 feul. Fill tank. Prime and start boiler. Boiler must be up and running upon completion of drop or esb f Date: December 26, 2001Permit type: Util | Permit id: E211275 | |||||
Make all necessary repairs to oil boiler to restore to proper working condition. Restore heat to entire building. Alternative enforcement program ( Date: December 19, 2008Permit type: Heat | Permit id: E919022 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problems immediately to esb fuel unit. (212) 863-8781 Date: December 8, 2010Permit type: Util | Permit id: Eb16893 | |||||
(apt. #5) restore heat to 2 radiators, (1) at livingroom and (1) at bedroom. Note: heating plant is up and running. Remove all work related debris Date: January 29, 2008Permit type: Plumb | Permit id: E820893 | |||||
Restore #2 oil boiler to proper working oder,boiler shut off by fire department due to excessive smoke. 1)vaccum,clean tune and adjust boiler and mak Date: December 8, 2010Permit type: Heat | Permit id: Eb16886 | |||||
O care fully disconnects all the fixtures at kitchen and save it for reuse. O demo the existing kitchen floor. Provide wonder board and ceramic tile Date: May 8, 2009Permit type: Gc | Permit id: E937598 | |||||
Boiler producing hot water but no heat,please make neccessary repairs and or adjustments to restore heat to the entire building. Please meet hpd cpm Permit type: Heat | Permit id: Ec16694 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: February 8, 2016Permit type: Delead | Permit id: Eg12555 | |||||
R/c 20141419802 apt 2: as per the requirement contract with hpd, provide and install / repair window guards throughout apartment. Remove all wor Date: June 29, 2015Permit type: Gc | Permit id: Ef22073 | |||||
Perform total lead analysis of 08 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: January 23, 2012Permit type: Delead | Permit id: Ec18719 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: January 12, 2012Permit type: Delead | Permit id: Ec17613 | |||||
Supply and install lf. Of leader affecting apt. #2. Supply and install leader head. Scaffold rental for 1 day. Restore entire bathroom affected Date: June 18, 2004Permit type: Gc | Permit id: E425844 | |||||
Boiler producing hot water but no heat,please make neccessary repairs and or adjustments to restore heat to the entire building. Please meet hpd cpm Permit type: Heat | Permit id: Ec16694 | |||||
Boiler producing hot water but no heat,please make neccessary repairs and or adjustments to restore heat to the entire building. Please meet hpd cpm Permit type: Heat | Permit id: Ec16694 | |||||
R c 20141419802 apt 2: as per the requirement contract with hpd, provide and install repair window guards throughout apartment. Remove all wor Date: June 29, 2015Permit type: Gc | Permit id: Ef22073 | |||||
Boiler producing hot water but no heat,please make neccessary repairs and or adjustments to restore heat to the entire building. Please meet hpd cpm Permit type: Heat | Permit id: Ec16694 | |||||
Boiler producing hot water but no heat,please make neccessary repairs and or adjustments to restore heat to the entire building. Please meet hpd cpm Permit type: Heat | Permit id: Ec16694 | |||||
Restore electricity to all sty p. H. Ensure that all sty p. H ceiling light is working properly. Please note: remove all work related debris. Permit type: Elec | Permit id: Ea13630 | |||||
Public area : at roof : flash approx. 1 l. Ft. Of seams that covers top floor hallway and around bulkhead. Scrape, plaster and paint approx. 8 sq. O Date: June 9, 2008Permit type: Gc | Permit id: E834005 | |||||
Properly pitch the roof at the bulkhead door area approximate sq. Ft. So that the water runs to the drain, also flash the skylight area to preven Date: August 30, 2004Permit type: Gc | Permit id: E506809 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: July 14, 2008Permit type: Delead | Permit id: E836584 | |||||
Public parts: roof level dumbwaiters seal up dumb waiter shaft doors as per nyc dob directiv Date: March 7, 2012Permit type: Gc | Permit id: Ec22213 | |||||
Install a new heavy duty mortise lock & mechanical closer at buildings entrance door. Provide copies (6no.) - one each per apartment, of keys. Ensure Date: December 17, 2008Permit type: Gc | Permit id: E919073 | |||||
Apt#4: apt#2 and cellar apt#4: 1] trace locate faulty elctrical wiring throught apt. And restore electricity. Apt#2: bathroom: 2] remo Date: March 5, 2012Permit type: Elec | Permit id: Ec20785 | |||||
At 2nd sty fire escape front west of bldg: repair drop ladder so that it will slide easily in the guide rods. Remove all work related debris Date: February 7, 2008Permit type: Gc | Permit id: E821877 | |||||
@ boiler room : ) supply and install new petrometer at the oil tank and ensure that same is working properly. Work must be done in accordan Date: February 16, 2012Permit type: Heat | Permit id: Ec20971 | |||||
1. As directed, demolish and discard all existing finish flooring, sub-flooring, moldings, ceramic tile approx 405 sq. Ft at 1st sty floor at top of ce Permit type: Gc | Permit id: E940112 | |||||
O raise the bulk head door saddle level and provide new aluminum saddle on bulkhead door. Ensure that bulk door saddle level is higher than roof level Date: May 7, 2009Permit type: Gc | Permit id: E937739 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: July 30, 2010Permit type: Gc | Permit id: Eb05007 | |||||
Public area: at public hall bulk head reapir the roof so that it with not leak into the public area. Aprrox. 1 sq. Ft. Restore damaged seffit appr Date: December 12, 2006Permit type: Gc | Permit id: E715570 | |||||
Remove approximately cuyds of rubbish and debris from basenent and stairwell going to basement. Leave basement in clean condition so machanics can Date: December 13, 2010Permit type: Gc | Permit id: Eb17003 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Replace with new the broken, defective tread 5th from top at ea Date: July 27, 2010Permit type: Gc | Permit id: Eb04997 | |||||
@ public hall: replace with new the metal nosing # 1, 6, 11, 12, 13, 14,17(total 7) from the bottom at stair case from 1st story to 2nd story. Date: February 16, 2012Permit type: Gc | Permit id: Ec20648 | |||||
Remove illegal tap from the back of the distribution panel apartment #4 and apartment #1 in the basement. Install new dual breakers of adequate capa Permit type: Elec | Permit id: Ec14333 | |||||
Public parts:remove accumulation of rubbish at shared driveway between 245 and 247 linden boulevard. Approx 5cy remove all work related debris. Date: January 15, 2016Permit type: Gc | Permit id: Eg10559 | |||||
Make necessary repair wood trade and intermediate landing at 1st tread leading to 2nd sty public hall and intermediate landing leading to 2nd sty at p Date: November 16, 2010Permit type: Gc | Permit id: Eb14518 | |||||
@ roof: provide and install 2 sf of lbs cap sheet on existing roof including of flashing adjacent to the perimeter of the bulk head are Date: June 22, 2012Permit type: Gc | Permit id: Ec31409 | |||||
Supply and install a new vestibule door with appropriate vestibule lock as per h. P. D. Specification door is approx 38 x 84 door must be self clos Date: November 6, 2003Permit type: Gc | Permit id: E407731 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: December 28, 2009Permit type: Gc | Permit id: Ea19007 | |||||
Apt 7..... Install (1) window guard throught-out apartment. Date: May 8, 2015 Value: $107Permit type: Gc | Permit id: Ef20467 | |||||
Locate and adjust mixing valve. Restore hot water to 1 degrees and ensure hot water is not greater than 1 degrees to apartment #2. At the time o Date: January 2, 2016 Value: $65Permit type: Heat | Permit id: Eg09951 | |||||
Public parts.......... Install (2) balusters at 2nd story public hall. At the time of this invitation to bid, it is not anticipated that this work w Date: December 30, 2015 Value: $112Permit type: Gc | Permit id: Eg09812 | |||||
Apt #5) at kitchen : replace (1) the broken or missing lower sash at window. Remove all work related debris. Date: May 5, 2008 Value: $448Permit type: Gc | Permit id: E831345 | |||||
Supply and install 4 was balusters at public hall at 3rd story and 4th story. Contractor must sign and return bid. Contractor must contact hpd a Date: January 25, 2008 Value: $196Permit type: Gc | Permit id: E820826 | |||||
Apt 5) at bathroom, repair defective leaky diverter valve. Date: November 21, 2006 Value: $41Permit type: Plumb | Permit id: E714078 | |||||
Apartment #4 install one (1) one way screws and stops in children room. Date: April 17, 2006 Value: $28Permit type: Gc | Permit id: E631033 | |||||
Install 1 mortise lock at vestibule door leading to first public hallway. Supply 6 set s of keys to tenants. Date: November 21, 2002 Value: $201Permit type: Gc | Permit id: E309920 | |||||
Apt # 4 bed: install 2 radiators valves at front and rear bedroom. Date: February 6, 2001 Value: $158Permit type: Plumb | Permit id: E115655 | |||||
Apt # 2 rear room: cover floor with drop cloth. Square-off ceiling approx. 16 sqft. Sheetrock ceiling 16 sqft. Plaster,tape and compound. Bag and Date: February 6, 2001 Value: $296Permit type: Gc | Permit id: E115651 | |||||
Apt # 2 bedroom: cover floor with drop cloth. Demo approx 25 sqft ceiling. Sheetrock ceiling 25 sqft. Plaster,tape and compound. Bag and remove all Date: April 4, 2001 Value: $378Permit type: Gc | Permit id: E120068 | |||||
Apt # 2 bath: cover floor with drop cloth. Demo approx 32 sqft ceiling. Sheetrock ceiling 32 sqft. Plaster,tape and compound. Bag and remove all ru Date: April 4, 2001 Value: $353Permit type: Gc | Permit id: E120067 | |||||
Apt # 4 bath: replace 1 defective radiator air valve. Bedroom: replace 2 radiator air valves. Livingroom: shut-of valve to abate water leaks to apt Date: April 4, 2001Permit type: Plumb | Permit id: E119992 | |||||
Public hall: install 1newel post to 1st floor stairs. Install handrail 3 lf. Install balusters to 1st floor stairs. Date: September 26, 2000 Value: $328Permit type: Gc | Permit id: E105880 | |||||
Restore electricity to all sty p. H. Ensure that all sty p. H ceiling light is working properly. Please note: remove all work related debris. Permit type: Elec | Permit id: Ea13630 | |||||
1. As directed, demolish and discard all existing finish flooring, sub-flooring, moldings, ceramic tile approx 405 sq. Ft at 1st sty floor at top of ce Permit type: Gc | Permit id: E940112 | |||||
Remove illegal tap from the back of the distribution panel apartment #4 and apartment #1 in the basement. Install new dual breakers of adequate capa Permit type: Elec | Permit id: Ec14333 | |||||
Remove illegal tap from the back of the distribution panel apartment #4 and apartment #1 in the basement. Install new dual breakers of adequate capa Permit type: Elec | Permit id: Ec14333 | |||||
1. As directed, demolish and discard all existing finish flooring, sub-flooring, moldings, ceramic tile approx 405 sq. Ft at 1st sty floor at top of ce Permit type: Gc | Permit id: E940112 | |||||
Restore electricity to all sty p. H. Ensure that all sty p. H ceiling light is working properly. Please note: remove all work related debris. Permit type: Elec | Permit id: Ea13630 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: August 4, 2009Permit type: Gc | Permit id: Ea05054 | |||||
Public parts: roof level dumbwaiters seal up dumb waiter shaft doors as per nyc dob directiv Date: February 28, 2012Permit type: Gc | Permit id: Ec20762 | |||||
Remove illegal tap from the back of the distribution panel apartment #4 and apartment #1 in the basement. Install new dual breakers of adequate capa Permit type: Elec | Permit id: Ec14333 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Replace with new the broken, defective tread 5th from top at ea Date: July 27, 2010Permit type: Gc | Permit id: Eb04997 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: July 30, 2010Permit type: Gc | Permit id: Eb05007 | |||||
1. As directed, demolish and discard all existing finish flooring, sub-flooring, moldings, ceramic tile approx 405 sq. Ft at 1st sty floor at top of ce Permit type: Gc | Permit id: E940112 | |||||
Restore electricity to all sty p. H. Ensure that all sty p. H ceiling light is working properly. Please note: remove all work related debris. Permit type: Elec | Permit id: Ea13630 | |||||
SCORE 95 Date: March 24, 2017 Contractor: Jerod GallimoreClient: Jerod Gallimore | Client Address: 233 South Columbus Avenue Mt Vernon Ny 10553 | Client Phone: (516) 209-1668 | Client Company: Billy Enterprises Inc | Permit status: Initial | Permit id: 340481482 | |||||
Restore electricity to all sty p. H. Ensure that all sty p. H ceiling light is working properly. Please note: remove all work related debris. Permit type: Elec | Permit id: Ea13630 | |||||
Remove illegal tap from the back of the distribution panel apartment #4 and apartment #1 in the basement. Install new dual breakers of adequate capa Permit type: Elec | Permit id: Ec14333 | |||||
1. As directed, demolish and discard all existing finish flooring, sub-flooring, moldings, ceramic tile approx 405 sq. Ft at 1st sty floor at top of ce Permit type: Gc | Permit id: E940112 | |||||
Make neccessary erepairs to #2 oil boiler to restore heat and hot water to the entire building Date: January 30, 2013Permit type: Heat | Permit id: Ed15170 | |||||
Provide single fuel drop 5 gallons #2 fuel fill/tank and prime & start boiler. Date: January 12, 2001Permit type: Util | Permit id: E113717 | |||||
Provide single fuel drop to the above address with prime and start. #2 fuel- fill 5 gl tank, please report problems immediately to the esb fuel unit Date: January 23, 2012Permit type: Util | Permit id: Ec18700 | |||||
Work must be done in accordance with all city, state and federal rules/regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: July 31, 2009Permit type: Gc | Permit id: Ea04988 | |||||
Boiler not working , producing hot water only meet hpd team at building and make neccessary repairs to restore Date: February 8, 2012Permit type: Heat | Permit id: Ec20379 | |||||
Apt#4: requirment contractor: bijoy construction corp. Contract no: 2012140666402 1] suppl Permit type: Gc | Permit id: Ec20730 | |||||
Entire apartment remove all defective/broken window balances, supply and install new balances to upper and lower sash window in the entire apar Date: July 13, 2012Permit type: Gc | Permit id: Ed01983 | |||||
In apt. 4 northeast-3 [1] remove and discard the broken/defective window & wooden frames in the livingroom @ south-1 window. Supply & install Date: September 11, 2012Permit type: Gc | Permit id: Ed05621 | |||||
1) replace the defective counter balance; remedy any other defect that cause the free falling and collapsing of window sashes (2no.) in the 3rd room f Date: December 26, 2008Permit type: Gc | Permit id: E919070 | |||||
Clean and vacuum complete. Replace cad cell and relay. Replair leak at boiler rear on hartford loop and equalizer. Restore to proper working ord Date: March 8, 2000Permit type: Heat | Permit id: E017912 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: March 23, 2012Permit type: Delead | Permit id: Ec25384 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: February 14, 2012Permit type: Delead | Permit id: Ec20564 | |||||
Apt#4: requirment contractor: bijoy construction corp. Contract no: 2012140666402 1] suppl Permit type: Gc | Permit id: Ec20730 | |||||
Apt#4: requirment contractor: bijoy construction corp. Contract no: 2012140666402 1] suppl Permit type: Gc | Permit id: Ec20730 | |||||
Entire apartment remove all defective broken window balances, supply and install new balances to upper and lower sash window in the entire apar Date: July 13, 2012Permit type: Gc | Permit id: Ed01983 | |||||
In apt. 4 northeast-3 [1] remove and discard the broken defective window & wooden frames in the livingroom @ south-1 window. Supply & install Date: September 11, 2012Permit type: Gc | Permit id: Ed05621 | |||||
Apt#4: requirment contractor: bijoy construction corp. Contract no: 2012140666402 1] suppl Permit type: Gc | Permit id: Ec20730 | |||||
Work must be done in accordance with all city, state and federal rules regulations. Work must be coordinated with hpd and all tenants in occupancy. Date: July 31, 2009Permit type: Gc | Permit id: Ea04988 | |||||
Provide single fuel drop 5 gallons #2 fuel fill tank and prime & start boiler. Date: January 12, 2001Permit type: Util | Permit id: E113717 | |||||
Apt#4: requirment contractor: bijoy construction corp. Contract no: 2012140666402 1] suppl Permit type: Gc | Permit id: Ec20730 |