ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Sec 1 amps Date: October 1, 2007Permit type: Electrical permit | Permit status: Finaled | Completion date: October 30, 2007 | Current use: Single family dwelling | Permit id: 467168 | |||||
Oil boiler Date: February 26, 2015Permit type: Mechanical permit | Permit status: Finaled | Completion date: March 30, 2015 | Current use: Single family dwelling | Permit id: 704496 | |||||
Restoration of row complete repair (restoration of right of way) shall be made of any and all damages done to existing improvements in the public right of way caused byreplacing driveway pipe culvert construction. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. (maryland dnr permit is required prior to remove/impact street trees. Complete tree protection and replanting per mc dps approved tree protection plan.) Date: March 23, 2016Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 351825 |