ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electric heat pump and or air conditioner replacement, no modifications or alterations to existing system Date: September 19, 2017Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: September 22, 2017 Contractor: Semper Solaris Construction IncPermit type: Addn | Permit status: Completed | Completion date: November 14, 2017 | Permit id: Pds2017-Resalt- | |||||
Foundation/steel/holdowns/abs/2nd Date: May 3, 2005Permit status: Pass | Permit id: Pds2005-1003-20 | |||||
Final Date: November 15, 2011Permit status: Pass | Permit id: Pds2005-1003-20 | |||||
Stormwater insp Date: December 20, 2010Permit status: Monitor | Permit id: Pds2005-1003-20 | |||||
Combo frame Date: September 10, 2007Permit status: Fail | Permit id: Pds2005-1003-20 | |||||
Combo frame Date: October 2, 2006Permit status: Fail | Permit id: Pds2005-1003-20 |