| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install alarm system to include siren keypad control panel 3 door sensors and one motion detector as per code. Date: June 18, 2007 Value: $200Permit id: Com2007-18666 | |||||
Reinstate permit #com2006-31004 for thirty (30) days for final inspection. Original permit description:(com2006-31004)install (20) circuits for renovation upgrade service to 2 amps. Install (10) low voltage devices. As per code. Date: June 7, 2007Permit id: Com2007-17923 | |||||
Original permit description:(com2006-25237)replace all dwv and water piping. Replace water services. Install new gas pipe to allappliances. Install new 75 gal gas wh as per code. Date: May 25, 2007Permit id: Com2007-16549 | |||||
Replace existing front steps as per sketches and per code. Date: May 22, 2007 Value: $1,500Permit id: Com2007-12647 | |||||
Chemical wash and point up brick at front of building. Work as per code. Date: April 25, 2007 Value: $2,500Permit id: Com2007-12519 | |||||
Request for time extension on permit #com2006-19717 issued on 6-27-06 with original completion date of 12-27-06. Original permit description:(com2006-19717)rehab framing(non structural) drywall one kitchen (2) full baths (2) half baths insulation 6 Date: March 23, 2007Permit id: Com2007-09034 | |||||
Reinstate permit #com2006-19717 for thirty (30) days for final inspectionoriginal permit description:(com2006-19717)rehab framing(non structural) drywall one kitchen (2) full baths (2) half baths insulation 6 fence in rear. Remove/replace concrete Date: February 5, 2007Permit id: Com2007-03661 | |||||
Interior work to install 2 amp temporary service and (1) circuit as per code. Date: December 12, 2006 Value: $800Permit id: Com2006-38498 | |||||
Install (20) circuits for renovation upgrade service to 2 amps. Install (10) low voltage devices. As per code. Date: October 6, 2006 Value: $4,000Permit id: Com2006-31004 | |||||
Temporary service install 2 amp. As per code. Date: October 6, 2006 Value: $500Permit id: Com2006-31005 | |||||
Replace water service from meter to home. Date: September 26, 2006 Value: $900Permit id: Com2006-29602 | |||||
Install (2) 2. 5 ton a/c system with duct workinstall (2) 75 0 btu gas furnace Date: August 17, 2006 Value: $14,000Permit id: Com2006-25434 | |||||
Replace all dwv and water piping. Replace water services. Install new gas pipe to allappliances. Install new 75 gal gas wh as per code. Date: August 16, 2006 Value: $3,000Permit id: Com2006-25237 | |||||
Rehab framing(non structural) drywall one kitchen (2) full baths (2) half baths insulation 6 fence in rear. Remove/replace concrete pad in rear. Tile and hardwood floor as needed. Install new windows and doors. Remove/replace existing deck in rear Date: June 27, 2006 Value: $45,000Permit id: Com2006-19717 | |||||
Interior demo as per code Date: May 9, 2006 Value: $5,500Permit id: Com2006-14338 | |||||
Reinstate permit #com2006-19717 for thirty (30) days for final inspectionoriginal permit description:(com2006-19717)rehab framing(non structural) drywall one kitchen (2) full baths (2) half baths insulation 6 fence in rear. Remove/replace concrete pad in rear. Tile and hardwood floor as needed. Install new windows and doors. Remove/replace existing deck in rear. As per code. Date: February 5, 2007Expiration date: March 5, 2007 | Permit id: Com2007-03661 | |||||
Request for time extension on permit #com2006-19717 issued on 6-27-06 with original completion date of 12-27-06. Original permit description:(com2006-19717)rehab framing(non structural) drywall one kitchen (2) full baths (2) half baths insulation 6 fence in rear. Remove/replace concrete pad in rear. Tile and hardwood floor as needed. Install new windows and doors. Remove/replace existing deck in rear. As per code. Date: March 23, 2007Expiration date: September 23, 2007 | Permit id: Com2007-09034 | |||||
Rehab framing(non structural) drywall one kitchen (2) full baths (2) half baths insulation 6 fence in rear. Remove/replace concrete pad in rear. Tile and hardwood floor as needed. Install new windows and doors. Remove/replace existing deck in rear. As per code. Date: June 27, 2006 Value: $45,000Expiration date: December 27, 2006 | Permit id: Com2006-19717 | |||||
Rehab framing(non structural) drywall one kitchen (2) full baths (2) half baths insulation 6 fence in rear. Remove replace concrete pad in rear. Tile and hardwood floor as needed. Install new windows and doors. Remove replace existing deck in rear. As per code. Date: June 27, 2006 Value: $45,000Expiration date: December 27, 2006 | Permit id: Com2006-19717 | |||||
Install (2) 2. 5 ton a c system with duct workinstall (2) 75 0 btu gas furnace Date: August 17, 2006 Value: $14,000Expiration date: February 17, 2007 | Permit id: Com2006-25434 | |||||
Request for time extension on permit #com2006-19717 issued on 6-27-06 with original completion date of 12-27-06. Original permit description:(com2006-19717)rehab framing(non structural) drywall one kitchen (2) full baths (2) half baths insulation 6 fence in rear. Remove replace concrete pad in rear. Tile and hardwood floor as needed. Install new windows and doors. Remove replace existing deck in rear. As per code. Date: March 23, 2007Expiration date: September 23, 2007 | Permit id: Com2007-09034 | |||||
Reinstate permit #com2006-19717 for thirty (30) days for final inspectionoriginal permit description:(com2006-19717)rehab framing(non structural) drywall one kitchen (2) full baths (2) half baths insulation 6 fence in rear. Remove replace concrete pad in rear. Tile and hardwood floor as needed. Install new windows and doors. Remove replace existing deck in rear. As per code. Date: February 5, 2007Expiration date: March 5, 2007 | Permit id: Com2007-03661 |