ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
On randlph rd @ judson rd, provide lining in sewer main in accordance with wssc plans and specifications. Work shall comply with the current montgomery county specifications for utility construction permit. Complete restoration shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: March 11, 2010Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 264474 | |||||
Install gas service in accordance with washington gas plan no. 73706. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstructi Date: December 12, 2013Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 303333 |