The work will include a 3rd & 4th floor expansion. This expansion will extend and connect to the existing general hospital. The structure system will include steel structure with composite steel beams and trusses to span over the existing loading deck acc Date: March 9, 2006 Value: $3,500,000Permit id: Com2004-23212 | |||||
Request for time extension on permit# com2004-25542 with plans# 2004-1311 issue date 1/26/05 with completion date of 10/13/05. To extend to 4/19/06. Date: October 19, 2005Permit id: Com2005-31045 | |||||
Erect 2 story addition with stair & elevator penthouse above an existing 1 story building with basement. Scope includes upgrade of existing patient elevator and existing extension of existing service elecvator shaft for future patient elevator installatio Date: January 26, 2005 Value: $7,612,000Permit id: Com2004-25542 | |||||
The work includes installation of new equipment as part of a fit-out of an existing shell space and renovation to the nuclear medicine suite on the second floor. Work include new ceiling new walls new finishes and new hvac air distribution as per plans. Date: October 27, 2004 Value: $425,000Permit id: Com2004-24821 | |||||
Add (304) sprinklers per plans on 1st floor of labor and delivery. Date: October 1, 2004 Value: $10,000Permit id: Com2004-22851 | |||||
The work will include a 3rd & 4th floor expansion. This expansion will extend and connect to the existing general hospital. The structure system will include steel structure with composite steel beams and trusses to span over the existing loading deck access aisle. Exterior walls consist of high end e. L. F. S. On metal studs and storefront glazing. Separate permit will be required for fire alarm system. Hoffberger garage and operating room addition per pud # 72 ordinance # 433 approved by mcc 2/2/ # 625 approved by mcc 11/29/ and ordinance # 352 approved 10/22/94 and final design approval of the planning coimmission of 11/11/04 Date: March 9, 2006 Value: $3,500,000Expiration date: March 9, 2006 | Permit id: Com2004-23212 | |||||
The work includes installation of new equipment as part of a fit-out of an existing shell space and renovation to the nuclear medicine suite on the second floor. Work include new ceiling new walls new finishes and new hvac air distribution as per plans. Separate permit is required for sprinkler system. Date: October 27, 2004 Value: $425,000Expiration date: October 27, 2005 | Permit id: Com2004-24821 | |||||
Erect 2 story addition with stair & elevator penthouse above an existing 1 story building with basement. Scope includes upgrade of existing patient elevator and existing extension of existing service elecvator shaft for future patient elevator installation. Construction of a new stair tower and relocation of a heliport to the roof. Separate permit required for fire alarm system. Per pud # 72 ordinance # 433 approved 2/2/ ordinance # 635 approved 11/29/ ordinance# 362 approved 10/22/94 and minor pud amendment and final design approval of the planning commission of 6/10/04 Date: January 26, 2005 Value: $7,612,000Expiration date: October 13, 2005 | Permit id: Com2004-25542 |