Install tele-data outlets. As per code. Date: August 19, 2015 Value: $16,000Permit id: Com2015-19364 | |||||
Use 5th floor of hospital for rehabilitation center Date: October 18, 2012Permit id: Use2012-03893 | |||||
Amend permit # com2012-18496 issued on 8/30/12 with plans# 2011-1632 to add electrical contractor as listed aboveoriginal permit description:(com2012-18496)categoryi: non structural alterations: interior work; 6 sq ft: the work will include the interior Date: September 28, 2012Permit id: Com2012-19945 | |||||
Amend permit#com201218496 issued on 8-30-12 to add plumber and hvac contractor as stated above. Original permit description:(com2012-18496)categoryi: non structural alterations: interior work; 6 sq ft: the work will include the interior alteration of the Date: September 20, 2012Permit id: Com2012-19948 | |||||
Original permit description:(com2011-11414)interior fit out of 5th floor shell space of the south tower. Work includes 21 patient units rehab spaces and supporting spaces. As per plans and as per code. Separate permit will be required for sprinkler syste Date: September 6, 2012Permit id: Com2012-18925 | |||||
Categoryi: non structural alterations: interior work; 6 sq ft: the work will include the interior alteration of the existing out patient facility; the space s renovated include the house keeping room converted to a flashing station room decon and clea Date: August 30, 2012 Value: $500,000Permit id: Com2012-18496 | |||||
Installation of ansul-r102 fire suppression system hospital 5th floor. As per plans as per code. Date: July 6, 2012 Value: $3,200Permit id: Com2012-10236 | |||||
New otaphic annunciator to be submitted for approval as per plans as per code. Date: June 13, 2012 Value: $80,000Permit id: Com2012-08461 | |||||
Amend permit #com2011-11414 issued on 07/21/11 with plans #2011-766 to add low voltage contractor as listed above. Original permit description:(com2011-11414)interior fit out of 5th floor shell space of the south tower. Work includes 21 patient units re Date: April 12, 2012Permit id: Com2012-07708 | |||||
Fire alarm modifications/ permit (com2011-20634 - added electrical & com2011-06239 - building) as per plans as per code. Date: February 23, 2012 Value: $9,212Permit id: Com2012-00909 | |||||
Fire alarm modifications/ permit (com2011-25855 - added electrical & com2011-20613 - building) as per plans as per code Date: February 23, 2012 Value: $2,545Permit id: Com2012-00910 | |||||
Fire alarm plans review for 5th floor renovation including: (2) booster panels (3) pull stations (3) monitor modules (46) smoke detectors (1) heat detector (3) duct smoke detectors (2) door holders (25) control modules (39) strobes (13) bell/stro Date: February 21, 2012 Value: $49,500Permit id: Com2012-01240 | |||||
Simplex grinnell to install fire sprinkler on the exist 5th floor. Occupancy light hazard per nfpa # 13 2007 ed. South tower tenant fit out total # of heads 292 2 zones north and south. As per plans and as per code. Date: February 14, 2012 Value: $60,600Permit id: Com2012-00034 | |||||
Amend permit # com2011-25278 issued on 01-20-12 with plans # 2011-1732 to add plumbing contractor and hvac contractor as listed above. Original permit description:(com2011-25278)amend permit com2011-11414 issued on 07/22/11 with plans #2011-766 to add th Date: January 31, 2012Permit id: Com2012-02167 | |||||
Amend permit com2011-11414 issued on 07/22/11 with plans #2011-766 to add the following additional work: added (8) additional patient rooms and corresponding support areas (all interior work no footprint required) . As per plans and as per code. Separate p Date: January 20, 2012 Value: $5,400,000Permit id: Com2011-25278 | |||||
Relocate (44) fire sprinkler heads & add (3) fire sprinkler heads to protect renovated patient access & lobby per nfpa 13 code and city of baltimore fire marshal requirements as per code. Building permit com2011-20613 Date: December 21, 2011 Value: $10,000Permit id: Com2011-27404 | |||||
Provide 200a temporary feeder to jobsite construction office trailer. Trailer permit #com2011-25403 - 1ckt as per code. Date: December 6, 2011 Value: $5,000Permit id: Com2011-26273 | |||||
Amend permit # com2011-11414 issued on 07-22-11 with plans # 2011-1225 to add electrical contractor as listed above. Original permit description:(com2011-11414)interior fit out of 5th floor shell space of the south tower. Work includes 21 patient units r Date: November 30, 2011Permit id: Com2011-25853 | |||||
Fire alarm plans review for ground floor boardroom renovation including: 1 booster panel 1 smoke detector 2 door holders 1 control module 6 strobes and 2 speaker/strobes as per code. Date: November 30, 2011Permit id: Com2011-25836 | |||||
Amend permit#com2011-11414 issued on 7-22-11 w/plans#2011-1225 to add the plumber and hvac contractor as stated above. Original permit description:(com2011-11414)interior fit out of 5th floor shell space of the south tower. Work includes 21 patient units Date: November 9, 2011Permit id: Com2011-24523 | |||||
1-6. 5 a/v booster power supply 2-12v 7 amp/hr battery 2-ionization smoke detectors 2- smoke detector bases 1-control relay 1-multi-voltage relay 7-strobe 15cd-red (wall mount) as perplans as per code. Date: October 6, 2011 Value: $60,000Permit id: Com2011-18814 | |||||
Amend permit#com2011-11414 issued on 7-22-11 w/plans#2011-766 to add prime contractor as stated above also amend to revise drawings; revised no. Of patient rooms relocated day rooms nourishment rooms as per plans as per code. Original permit description: Date: September 22, 2011 Value: $4,500,000Permit id: Com2011-17972 | |||||
Request for time extension on permit #com2010-028 issued on 04/01/ with original completion date of 10/01/11. Original permit description:(com2010-02800)interior demolition and fit out of space in the 4th floor to fit 4 new operating rooms a new cys Date: August 30, 2011Permit id: Com2011-18884 | |||||
Interior fit out of 5th floor shell space of the south tower. Work includes 21 patient units rehab spaces and supporting spaces. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Date: July 22, 2011 Value: $4,500,000Permit id: Com2011-11414 | |||||
Amend permit#issued on 4-21-11 with plans#2011-525 to add electrical contractor as listed above. Original permit description:(com2011-08071)complete renovation of an existing radiology suite on the 2nd flooor of sinai hospital including demolition of exist Date: June 28, 2011Permit id: Com2011-14205 | |||||
Amend permit# com2011-08071 issued on 04/21/11 with plans# 2011-525 to add plumbing & hvac contractor as listed above original permit description:(com2011-08071)complete renovation of an existing radiology suite on the 2nd flooor of sinai hospital includi Date: June 23, 2011Permit id: Com2011-13846 | |||||
Complete renovation of an existing radiology suite on the 2nd flooor of sinai hospital including demolition of existing radiology suite and fitout of new interventional radiology room and adjacent support spaces. Includes relocation of a mechanical room Date: April 21, 2011 Value: $560,000Permit id: Com2011-08071 | |||||
"the relocation of 13 sprinklers from existing outlets and the addition of 4 new sprinklers; the largest pipe size to be installed is 1""; the occupancy is a light hazard occupancy; all work will be done as per code." Date: March 29, 2011 Value: $9,000Permit id: Com2011-06781 | |||||
Request for time extension on permit# com2010-14379 issued on 09/14/ with original/amended completion date of 03/14/11original permit description:(com2010-14379)install 75 new sprinklers in a light hazard hospital addition as per plans and as per code. Date: March 11, 2011Permit id: Com2011-05397 | |||||
Request for time extension on permit com2010-028 issued on 04/01/ with original completion date of 04/01/11. Original permit description:(com2010-02800)interior demolition and fit out of space in the 4th floor to fit 4 new operating rooms a new cysto Date: March 9, 2011Permit id: Com2011-05164 | |||||
Request for time extension on permit com2010-02799 issued on 04/01/ with original completion date of 04/01/11. Original permit description:(com2010-02799)interior demoltion & renovation of existing central sterile department on the 5th floor interior f Date: March 8, 2011Permit id: Com2011-05014 | |||||
Installation of an automatic temperature control system consisting of 42 thermostats as per code Date: December 6, 2010 Value: $19,000Permit id: Com2010-26898 | |||||
Fire alarm system modifications/ permit Date: October 21, 2010 Value: $500Permit id: Com2010-15539 | |||||
(use) use portion of premises 3rd floor nw side as offices. Date: September 24, 2010Permit id: Use2010-01763 | |||||
Install 75 new sprinklers in a light hazard hospital addition as per plans and as per code. Date: September 14, 2010 Value: $7,000Permit id: Com2010-14379 | |||||
Fire alarm devices & review. 2 pull stations 27 smoke detectors 8 heat detectors 11 f/a bell 32 strobes 4 door holders and 3 control relays. Work per plans per code. Date: August 24, 2010 Value: $500,000Permit id: Com2010-12647 | |||||
Interior work sprinkler - add (8) and relocate (32) sprinklers due to renovations of phase 1b of pathology dept design per nfpa 13 (3rd floor) as per code. Date: August 18, 2010 Value: $21,000Permit id: Com2010-18422 | |||||
Amend permit #com2010-15828 issued on 08/06/ with plans #2010-991 to add electrical contractor as listed above. Original permit description:(com2010-15828)interior work 16 sqft: minor interior alterations new finishes as per code Date: August 10, 2010Permit id: Com2010-17612 | |||||
Interior work 16 sqft: minor interior alterations new finishes as per code Date: August 6, 2010 Value: $150,000Permit id: Com2010-15828 | |||||
(use) use portion of existing hospital as a pediatric hematology and oncology patient unit including 5 exam rooms. Date: July 16, 2010Permit id: Use2010-02238 | |||||
Installation of two (2) double-faced illuminated monument signs one on both the east and west side of west belvedere ave as you approach the main entrance to the hospital; both signs are behind the property line on hospital grounds as noted on the a Date: June 18, 2010 Value: $10,500Permit id: Com2010-11462 | |||||
Amend permit # com2010-028 issued on 04-01- with plans # 2010-205 to add plumbing contractor and hvac contractor as listed above. Original permit description:(com2010-02800)interior demolition and fit out of space in the 4th floor to fit 4 new operati Date: May 18, 2010Permit id: Com2010-10543 | |||||
Amend permit # com2010-02799 issued on 04-01- with plans # 2010-206 to add plumbing contractor and hvac contractor as listed above. Original permit description:(com2010-02799)interior demoltion & renovation of existing central sterile department on the Date: May 18, 2010Permit id: Com2010-10548 | |||||
Amend permit # com2010-02799 issued on 4/1/ with plans # 2010-206 to add electircal contractor as lised aboveoriginal permit description:(com2010-02799)interior demoltion & renovation of existing central sterile department on the 5th floor interior fi Date: May 18, 2010Permit id: Com2010-10509 | |||||
Installation of low voltage devices 1st peds/ hemoc as per codebuilding permit # com2009-21023 Date: May 18, 2010 Value: $36,960Permit id: Com2010-10617 | |||||
Amend permit # com2010-028 issued on 04/01/ wiht plans # 2010-205 to add eletrical contractor as listed aboveoriginal permit description:(com2010-02800)interior demolition and fit out of space in the 4th floor to fit 4 new operating rooms a new cysto Date: May 11, 2010Permit id: Com2010-09864 | |||||
Interior work to add (1) and relocate (6) due to revisions. Design per nfpa 13 for light hazard occupancy as per code. Date: April 26, 2010 Value: $6,000Permit id: Com2010-08567 | |||||
Amend permit com2010-02277 issued on 04/09/ with plans #2010-152 to add electrical contractor as listed above. Original permit description:(com2010-02277)the scope of work includes constructing new lab space for the microbiology functions as well as te Date: April 13, 2010Permit id: Com2010-07334 | |||||
The scope of work includes constructing new lab space for the microbiology functions as well as temporary offices within the shell space as per plans & as per code. Separate permit will be required for sprinkler system and fire alaram. Date: April 9, 2010 Value: $1,771,500Permit id: Com2010-02277 | |||||
Interior demoltion & renovation of existing central sterile department on the 5th floor interior fit-out of new office spaces as well as supporitng spaces new equipement installation and addition of two new exterior service elevators as per plans & as p Date: April 1, 2010 Value: $1,509,600Permit id: Com2010-02799 | |||||
Interior demolition and fit out of space in the 4th floor to fit 4 new operating rooms a new cysto room and supporting staff spaces as per plans & as per code. Separate permit will be required for sprinkler system and fire alaram. Date: April 1, 2010 Value: $4,357,500Permit id: Com2010-02800 | |||||
Fire alarm devices; 7 pull strings 9 bell/strobs 24 strobes 14 smoke detectors 1 smoke elevator recall 14 duct detectors 6 door holders and 4 monitor modules. Date: March 24, 2010 Value: $75,000Permit id: Com2010-04789 | |||||
Installation of new wet pipe sprinkler system in fourth floor pacu area. Design based on nfpa 13 2002. Light hazard occupancy max sprinkler spacing is 160. 08 sq. Ft. Work done to code and per plans. Date: February 2, 2010 Value: $41,899Permit id: Com2009-27151 | |||||
Installation of new wet pipe sprinkler system in fourth floor cicu pre op and waiting room areas. Design based on nfpa 2002- light hazard occupancy. Max spacing is 196 sq. Ft. Work done to code and per plans. Date: February 2, 2010 Value: $36,200Permit id: Com2009-27152 | |||||
"request for time extension on permit#com2009-10681 issued on 6/3/09 with original completion date of 12/3/09 and amend with plans #2009-584 to add the following addition work: install (1) 24"" dish antenna to existing permit as per plans & as per code." Date: December 9, 2009 Value: $5,000Permit id: Com2009-26407 | |||||
"relocate 26 heads to accomodate new layout. Max pipe size 1"" light hazard occupancy as per code." Date: November 20, 2009Permit id: Com2009-27142 | |||||
Amend permit#com2009-19922 issued on 10/23/09 with plans#2009-1144. To add contractor as listed aboveoriginal permit description:(com2009-19922)renovation of an existing pharmacy as per plans as per code. Separate permit will be required for sprinkler sy Date: October 28, 2009Permit id: Com2009-25165 | |||||
Amend permit com2009-19922 issued on 10/23/09 with plans #2009-1144 to add electrical contractor as listed above. Original permit description:(com2009-19922)renovation of an existing pharmacy as per plans as per code. Separate permit will be required for Date: October 26, 2009Permit id: Com2009-25004 | |||||
Renovation of an existing pharmacy as per plans as per code. Separate permit will be required for sprinkler system. Date: October 23, 2009 Value: $1,100,000Permit id: Com2009-19922 | |||||
(use) use newly renovated 1st floor area for lobby for existing hospital Date: September 18, 2009Permit id: Use2009-02928 | |||||
"relocate 14 heads to accommodate new layout (largest pipe: 1""; light hazard occupancy) as per code." Date: August 13, 2009 Value: $3,800Permit id: Com2009-18934 | |||||
"install 1- 12"" and 1- 30"" dish antenna on existing building as per plans as per code. If installing suppression system in equipment cabinet(s) then a separate permit is required." Date: June 3, 2009 Value: $5,000Permit id: Com2009-10681 | |||||
Relocate 15 and add 1 sprinkler head to accommodate tenant layout. Work done to code. Date: May 5, 2009 Value: $5,100Permit id: Com2009-10146 | |||||
Installing low voltage camera system total of (14) units to be installed run copper labling for connections works to be done in new atrium as per code on 4th & 6th floors Date: April 30, 2009 Value: $25,000Permit id: Com2009-09852 | |||||
Installing low voltage camera system total of (7) units to be installed run copper labling for connections works to be done in new atrium as per code on main floor Date: April 30, 2009 Value: $25,000Permit id: Com2009-09849 | |||||
Amend permit com2009-00419 issued on 01/22/09 with plans #2009-17 to add prime contractor as listed above. Original permit description:(com2009-00419)partial renovation of offices for diabetes education employer education employee health & learning ce Date: April 29, 2009Permit id: Com2009-09678 | |||||
Amend permit #com2009-00419 issued 1/22/09 to add contractor as listed above. Original permit description:(com2009-00419)partial renovation of offices for diabetes education employer education employee health & learning center as per plans as per code. Date: April 13, 2009Permit id: Com2009-08233 | |||||
F& i (7) strobes (1) smoke detector (1) fire alarm booster panel as per plans as per code. Date: April 9, 2009 Value: $2,100Permit id: Com2009-06533 | |||||
Amend permit com2009-00419 issued on 01/122/09 with plans #2009-17 to add electrical contractor as listed above. Original permit description:(com2009-00419)partial renovation of offices for diabetes education employer education employee health & learn Date: April 9, 2009Permit id: Com2009-08033 | |||||
Fire alarm system and fire alarm devices: tamper - 15; flow - 19; bell - 3; pull - 21; strobe - 69 bell/strobe - 32; smoke - 68; heat - 20; and horn/strobe - 13 as per plans as per code. Date: April 7, 2009 Value: $160,000Permit id: Com2009-01125 | |||||
Install (1) afff foam monitor on roof at helipad as per plans as per code. Date: April 3, 2009 Value: $14,500Permit id: Com2009-05225 | |||||
Install eyewash relocate existing fixture; install new air supply and return outlets as per plans as per code. Date: March 31, 2009 Value: $75,000Permit id: Com2009-06559 | |||||
Partial renovation of offices for diabetes education employer education employee health & learning center as per plans as per code. Separate permit will be required for sprinkler system. Date: January 22, 2009 Value: $300,000Permit id: Com2009-00419 | |||||
Amend permit # com2008-25468 issued on 11/6/08 with plans # 2008-13 to add the following additional work new 4 amp 277/4 vct 3 phase service as per codeoriginal permit description:(com2008-25468)addition of a mri/imaging room and supporting space an Date: January 22, 2009 Value: $2,000Permit id: Com2009-01461 | |||||
Simplex grinnell is to install (1) fire sprinkler with an occupancy of light hazard per nfpa 13 2002 ed for the new 4th floor tenent fit-out in the south tower of sinai hospital total of (272) heads as per plans. Date: December 19, 2008 Value: $97,900Permit id: Com2008-28715 | |||||
Amend permit com2008-25468 issued on 11/06/08 with plans #2008-13 to add electric contractor as listed above. Original permit description:(com2008-25468)addition of a mri/imaging room and supporting space and new fit-out in an unoccupied area in existi Date: November 18, 2008Permit id: Com2008-30779 | |||||
Amend permit com2008-25468 issued on 11/08/08 with plans #2008-13 to add plumber and hvac contractors as listed above. Original permit description:(com2008-25468)addition of a mri/imaging room and supporting space and new fit-out in an unoccupied area i Date: November 10, 2008Permit id: Com2008-30104 | |||||
Addition of a mri/imaging room and supporting space and new fit-out in an unoccupied area in existing medical office building as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: November 6, 2008 Value: $500,000Permit id: Com2008-25468 | |||||
Relocate (12) speaker to accomodate remodel Date: October 9, 2008Permit id: Com2008-27443 | |||||
Medical equipment replacement with same type equipment plumbing removed and capped no hvac modification and new electrical wiring and electrical panel as per plans as per code. Separate permit will be required for sprinkler sytem. Date: September 15, 2008 Value: $60,000Permit id: Com2008-22828 | |||||
"rework existing wet sprinkler system to accommodate the wall & ceiling plan light hazard relocate: sprinkler heads largest pipe size:1""" Date: August 1, 2008 Value: $1,000Permit id: Com2008-21158 | |||||
Amend permit #com2007-31037 issued 12/21/07 w/plans #2007-1471 to add contractor as listed above. Original permit description:(com2007-31037)interior renovation of existing post partum patient rooms existing rooms will be completely gutted with new bathro Date: April 7, 2008Permit id: Com2008-09498 | |||||
Install fire alarm per attached plans as per code. Date: March 28, 2008 Value: $10,000Permit id: Com2008-03446 | |||||
Amend permit com2007-31037 issued on 12/21/07 with plans 2007-1471 to add contractorsoriginal permit description:(com2007-31037)interior renovation of existing post partum patient rooms existing rooms will be completely gutted with new bathrooms and bla Date: March 26, 2008Permit id: Com2008-08214 | |||||
Amend permit com2008-01163 issued on 01/25/08 with plans #2008-58 to add electrical contractor as listed above. Original permit description:(com2008-01163)interior alteration of an existing procedure room control room and adjacent spaces to support the Date: February 7, 2008Permit id: Com2008-03444 | |||||
Amend permit #com2008-01163 issued on 1/25/08 with plans #2008-58 to add contractor (s) as listed above. Original permit description:(com2008-01163)interior alteration of an existing procedure room control room and adjacent spaces to support the replacem Date: January 31, 2008Permit id: Com2008-02825 | |||||
Interior alteration of an existing procedure room control room and adjacent spaces to support the replacement of the imaging equipment on the second floor of the north wing of the general hospital. New ceilings walls and new flooring included in work. S Date: January 25, 2008 Value: $848,000Permit id: Com2008-01163 | |||||
Relocate 15 sprinklers asper code. Date: January 10, 2008 Value: $4,900Permit id: Com2008-00764 | |||||
Interior renovation of existing post partum patient rooms existing rooms will be completely gutted with new bathrooms and blaustein section of hospital as per plans as per code. Seperate permit will be required for sprinkler system and fire alaram. Date: December 21, 2007 Value: $1,400,000Permit id: Com2007-31037 | |||||
Amend permit #com2006-21063 issued on 12/4/06 with plans #2006-1124 to add contractor (s) as listed above. Original permit description:(com2006-21063)vertical expansion of the existing cancer center including interior renovation of the existing admitting Date: August 22, 2007Permit id: Com2007-26223 | |||||
Amend permit#com2006-21063 issued on 12-11-07 w/plans#2006-1124 to name electrical contractor as stated above. Original permit description:(com2006-21063)vertical expansion of the existing cancer center including interior renovation of the existing admitti Date: August 21, 2007Permit id: Com2007-26008 | |||||
Add 1 new sprinkler head and relocate 2 sprinkler heads. Largest pipe size is 1 area of construction is 2 sq. Ft as per code. Date: August 8, 2007 Value: $2,000Permit id: Com2007-24711 | |||||
Request for time extension on permit com 2006-13734 issused on 8/16/06 with original completion date of 2/16/07original permit description:(com2006-13734)relocation of existing cardiology unit into new open shell space. Some ceiling work on the floor belo Date: February 28, 2007Permit id: Com2007-06023 | |||||
Vertical expansion of the existing cancer center including interior renovation of the existing admitting office/waiting area as per plans and code. Separate permit is required for sprinkler system. Per pud # 72 ordinance # 433 # 625 and 352 and final d Date: December 11, 2006 Value: $2,300,000Permit id: Com2006-21063 | |||||
Amend permit #com2006-13623 issued on 8/10/06 with plans# 2006-668 to add contractors as listed aboveoriginal permit description:(com2006-13623)tenant fit-out of existing 3rd floor (shell) of the extisting south tower of sinai hospital to house a 36 pati Date: October 18, 2006Permit id: Com2006-32240 | |||||
Relocation of existing cardiology unit into new open shell space. Some ceiling work on the floor below will be required. Shell space located on the second floor of a 3 story building as per code. Seperate permit will be required for sprinkler system. Date: August 16, 2006 Value: $5,700,000Permit id: Com2006-13734 | |||||
Tenant fit-out of existing 3rd floor (shell) of the extisting south tower of sinai hospital to house a 36 patient room neuroscience unit. Work includes new interior partitions new ceilings new floor & wall finishes plumbing hvac & electrical as per p Date: August 10, 2006 Value: $5,397,100Permit id: Com2006-13623 | |||||
Interior alteration to existing linear accelerator vault for the installation of cyber knife as per plans and as per code. Seperate permit will be required for sprinkler system. Date: August 3, 2006 Value: $250,000Permit id: Com2006-18370 | |||||
"connect to existing 4"" outlet and add (39) sprinklers in 4th floor zuckerburg office - blaustein bldg as per code and plans." Date: July 25, 2006 Value: $10,300Permit id: Com2006-19178 | |||||
Amend permit # com2006-12806 issued on 6/22/06 with plan # 2006-6 to add contractors as listed aboveoriginal permit description:(com2006-12806)renovation of existing 1 381 sq ft of office space interior as per plans and code. Separate permit will be r Date: July 17, 2006Permit id: Com2006-21678 | |||||
Alteration of existing floor - 4th flr blaustein bldg sinai hospital of baltimore as per plans and as per code. Separate permit needed for sprinkler and fire alarm alterations. Date: June 23, 2006 Value: $200,000Permit id: Com2006-16660 | |||||
Renovation of existing 1 381 sq ft of office space interior as per plans and code. Separate permit will be required for sprinkler system and fire alaram. Date: June 22, 2006 Value: $165,000Permit id: Com2006-12806 | |||||
Install fire alarm as per plans Date: March 15, 2006 Value: $50,000Permit id: Com2006-06087 | |||||
(use) use portion of premises as an accessory off-street 7-level parking garage with 592 parking spaces per pud ord 84-352. Date: March 3, 2006Permit id: Com2006-05484 | |||||
Use portion of premises as a ( 7 ) story 364 space garage per pud # 72 ( hoffberger garage ) Date: March 3, 2006Permit id: Com2006-06217 | |||||
The relocation of 13 sprinklers heads and the additon of 4 sprinklers heads in a light hazard occupancy as per code. Date: December 8, 2005 Value: $8,965Permit id: Com2005-38029 | |||||
Amend permit #com2007-31037 issued 12/21/07 w/plans #2007-1471 to add contractor as listed above. Original permit description:(com2007-31037)interior renovation of existing post partum patient rooms existing rooms will be completely gutted with new bathrooms and blaustein section of hospital as per plans as per code. Seperate permit will be required for sprinkler system and fire alaram. Date: April 7, 2008Expiration date: December 21, 2009 | Permit id: Com2008-09498 | |||||
Amend permit com2007-31037 issued on 12/21/07 with plans 2007-1471 to add contractorsoriginal permit description:(com2007-31037)interior renovation of existing post partum patient rooms existing rooms will be completely gutted with new bathrooms and blaustein section of hospital as per plans as per code. Seperate permit will be required for sprinkler system and fire alaram. Date: March 26, 2008Expiration date: December 21, 2009 | Permit id: Com2008-08214 | |||||
Amend permit#com2009-19922 issued on 10/23/09 with plans#2009-1144. To add contractor as listed aboveoriginal permit description:(com2009-19922)renovation of an existing pharmacy as per plans as per code. Separate permit will be required for sprinkler system. Date: October 28, 2009Expiration date: April 23, 2010 | Permit id: Com2009-25165 | |||||
Amend permit com2009-19922 issued on 10/23/09 with plans #2009-1144 to add electrical contractor as listed above. Original permit description:(com2009-19922)renovation of an existing pharmacy as per plans as per code. Separate permit will be required for sprinkler system. Date: October 26, 2009Expiration date: April 23, 2010 | Permit id: Com2009-25004 | |||||
Amend permit # com2010-02799 issued on 04-01- with plans # 2010-206 to add plumbing contractor and hvac contractor as listed above. Original permit description:(com2010-02799)interior demoltion & renovation of existing central sterile department on the 5th floor interior fit-out of new office spaces as well as supporitng spaces new equipement installation and addition of two new exterior service elevators as per plans & as per code. Date: May 18, 2010Expiration date: April 1, 2011 | Permit id: Com2010-10548 | |||||
Installation of two (2) double-faced illuminated monument signs one on both the east and west side of west belvedere ave as you approach the main entrance to the hospital; both signs are behind the property line on hospital grounds as noted on the attached site plan; sign type a: 31" height x 4 width x 8" depth = 12 sf; sign type b: 5 height x 4 width x 8" depth = sf; all work will be done as per plans and as per code. Date: June 18, 2010 Value: $10,500Expiration date: December 20, 2010 | Permit id: Com2010-11462 | |||||
Request for time extension on permit#com2009-10681 issued on 6/3/09 with original completion date of 12/3/09 and amend with plans #2009-584 to add the following addition work: install (1) 24" dish antenna to existing permit as per plans & as per code. Date: December 9, 2009 Value: $5,000Expiration date: June 9, 2010 | Permit id: Com2009-26407 | |||||
Relocate 14 heads to accommodate new layout (largest pipe: 1"; light hazard occupancy) as per code. Date: August 13, 2009 Value: $3,800Expiration date: February 13, 2010 | Permit id: Com2009-18934 | |||||
Amend permit # com2010-028 issued on 04-01- with plans # 2010-205 to add plumbing contractor and hvac contractor as listed above. Original permit description:(com2010-02800)interior demolition and fit out of space in the 4th floor to fit 4 new operating rooms a new cysto room and supporting staff spaces as per plans & as per code. Separate permit will be required for sprinkler system and fire alaram. Date: May 18, 2010Expiration date: April 1, 2011 | Permit id: Com2010-10543 | |||||
Amend permit # com2010-02799 issued on 4/1/ with plans # 2010-206 to add electircal contractor as lised aboveoriginal permit description:(com2010-02799)interior demoltion & renovation of existing central sterile department on the 5th floor interior fit-out of new office spaces as well as supporitng spaces new equipement installation and addition of two new exterior service elevators as per plans & as per code. Date: May 18, 2010Expiration date: April 1, 2011 | Permit id: Com2010-10509 | |||||
Amend permit # com2010-028 issued on 04/01/ wiht plans # 2010-205 to add eletrical contractor as listed aboveoriginal permit description:(com2010-02800)interior demolition and fit out of space in the 4th floor to fit 4 new operating rooms a new cysto room and supporting staff spaces as per plans & as per code. Separate permit will be required for sprinkler system and fire alaram. Date: May 11, 2010Expiration date: April 1, 2011 | Permit id: Com2010-09864 | |||||
Install 1- 12" and 1- 30" dish antenna on existing building as per plans as per code. If installing suppression system in equipment cabinet(s) then a separate permit is required. Date: June 3, 2009 Value: $5,000Expiration date: December 3, 2009 | Permit id: Com2009-10681 | |||||
Amend permit com2009-00419 issued on 01/122/09 with plans #2009-17 to add electrical contractor as listed above. Original permit description:(com2009-00419)partial renovation of offices for diabetes education employer education employee health & learning center as per plans as per code. Separate permit will be required for sprinkler system. Date: April 9, 2009Expiration date: January 22, 2010 | Permit id: Com2009-08033 | |||||
Amend permit # com2008-25468 issued on 11/6/08 with plans # 2008-13 to add the following additional work new 4 amp 277/4 vct 3 phase service as per codeoriginal permit description:(com2008-25468)addition of a mri/imaging room and supporting space and new fit-out in an unoccupied area in existing medical office building as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: January 22, 2009 Value: $2,000Expiration date: January 16, 2010 | Permit id: Com2009-01461 | |||||
Amend permit com2010-02277 issued on 04/09/ with plans #2010-152 to add electrical contractor as listed above. Original permit description:(com2010-02277)the scope of work includes constructing new lab space for the microbiology functions as well as temporary offices within the shell space as per plans & as per code. Separate permit will be required for sprinkler system and fire alaram. Date: April 13, 2010Expiration date: October 19, 2011 | Permit id: Com2010-07334 | |||||
Amend permit com2008-01163 issued on 01/25/08 with plans #2008-58 to add electrical contractor as listed above. Original permit description:(com2008-01163)interior alteration of an existing procedure room control room and adjacent spaces to support the replacement of the imaging equipment on the second floor of the north wing of the general hospital. New ceilings walls and new flooring included in work. Separate permit will be required for sprinkler system and fire alaram. Date: February 7, 2008Expiration date: January 25, 2009 | Permit id: Com2008-03444 | |||||
Amend permit com2008-25468 issued on 11/08/08 with plans #2008-13 to add plumber and hvac contractors as listed above. Original permit description:(com2008-25468)addition of a mri/imaging room and supporting space and new fit-out in an unoccupied area in existing medical office building as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: November 10, 2008Expiration date: November 6, 2010 | Permit id: Com2008-30104 | |||||
Amend permit #com2008-01163 issued on 1/25/08 with plans #2008-58 to add contractor (s) as listed above. Original permit description:(com2008-01163)interior alteration of an existing procedure room control room and adjacent spaces to support the replacement of the imaging equipment on the second floor of the north wing of the general hospital. New ceilings walls and new flooring included in work. Separate permit will be required for sprinkler system and fire alaram. Date: January 31, 2008Expiration date: January 25, 2009 | Permit id: Com2008-02825 | |||||
Rework existing wet sprinkler system to accommodate the wall & ceiling plan light hazard relocate: sprinkler heads largest pipe size:1" Date: August 1, 2008 Value: $1,000Expiration date: February 1, 2009 | Permit id: Com2008-21158 | |||||
Interior demoltion & renovation of existing central sterile department on the 5th floor interior fit-out of new office spaces as well as supporitng spaces new equipement installation and addition of two new exterior service elevators as per plans & as per code. Date: April 1, 2010 Value: $1,509,600Expiration date: April 1, 2011 | Permit id: Com2010-02799 | |||||
Amend permit com2008-25468 issued on 11/06/08 with plans #2008-13 to add electric contractor as listed above. Original permit description:(com2008-25468)addition of a mri/imaging room and supporting space and new fit-out in an unoccupied area in existing medical office building as per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Date: November 18, 2008Expiration date: November 6, 2010 | Permit id: Com2008-30779 | |||||
Amend permit #com2009-00419 issued 1/22/09 to add contractor as listed above. Original permit description:(com2009-00419)partial renovation of offices for diabetes education employer education employee health & learning center as per plans as per code. Separate permit will be required for sprinkler system. Date: April 13, 2009Expiration date: January 22, 2010 | Permit id: Com2009-08233 | |||||
Amend permit com2009-00419 issued on 01/22/09 with plans #2009-17 to add prime contractor as listed above. Original permit description:(com2009-00419)partial renovation of offices for diabetes education employer education employee health & learning center as per plans as per code. Separate permit will be required for sprinkler system. Date: April 29, 2009Expiration date: January 22, 2010 | Permit id: Com2009-09678 | |||||
Request for time extension on permit com2010-02799 issued on 04/01/ with original completion date of 04/01/11. Original permit description:(com2010-02799)interior demoltion & renovation of existing central sterile department on the 5th floor interior fit-out of new office spaces as well as supporitng spaces new equipement installation and addition of two new exterior service elevators as per plans & as per code. Date: March 8, 2011Expiration date: October 1, 2011 | Permit id: Com2011-05014 | |||||
Request for time extension on permit com2010-028 issued on 04/01/ with original completion date of 04/01/11. Original permit description:(com2010-02800)interior demolition and fit out of space in the 4th floor to fit 4 new operating rooms a new cysto room and supporting staff spaces as per plans & as per code. Separate permit will be required for sprinkler system and fire alaram. Date: March 9, 2011Expiration date: October 1, 2011 | Permit id: Com2011-05164 | |||||
The relocation of 13 sprinklers from existing outlets and the addition of 4 new sprinklers; the largest pipe size to be installed is 1"; the occupancy is a light hazard occupancy; all work will be done as per code. Date: March 29, 2011 Value: $9,000Expiration date: September 29, 2011 | Permit id: Com2011-06781 | |||||
Request for time extension on permit com 2006-13734 issused on 8/16/06 with original completion date of 2/16/07original permit description:(com2006-13734)relocation of existing cardiology unit into new open shell space. Some ceiling work on the floor below will be required. Shell space located on the second floor of a 3 story building as per code. Seperate permit will be required for sprinkler system. Date: February 28, 2007Expiration date: August 28, 2007 | Permit id: Com2007-06023 | |||||
Categoryi: non structural alterations: interior work; 6 sq ft: the work will include the interior alteration of the existing out patient facility; the space s renovated include the house keeping room converted to a flashing station room decon and clean rooms converted t storage rooms and minor modifications to the restricted corridor in the core area first floor of the hecht building. All work will be done on per plans and per code. . Approved and reviewed under plans#2011-1632. Date: August 30, 2012 Value: $500,000Expiration date: August 30, 2013 | Permit id: Com2012-18496 | |||||
Original permit description:(com2011-11414)interior fit out of 5th floor shell space of the south tower. Work includes 21 patient units rehab spaces and supporting spaces. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Date: September 6, 2012Expiration date: March 6, 2013 | Permit id: Com2012-18925 | |||||
Amend permit # com2012-18496 issued on 8/30/12 with plans# 2011-1632 to add electrical contractor as listed aboveoriginal permit description:(com2012-18496)categoryi: non structural alterations: interior work; 6 sq ft: the work will include the interior alteration of the existing out patient facility; the space s renovated include the house keeping room converted to a flashing station room decon and clean rooms converted t storage rooms and minor modifications to the restricted corridor in the core area first floor of the hecht building. All work will be done on per plans and per code. . Approved and reviewed under plans#2011-1632. Date: September 28, 2012Expiration date: March 20, 2013 | Permit id: Com2012-19945 | |||||
Amend permit#com201218496 issued on 8-30-12 to add plumber and hvac contractor as stated above. Original permit description:(com2012-18496)categoryi: non structural alterations: interior work; 6 sq ft: the work will include the interior alteration of the existing out patient facility; the space s renovated include the house keeping room converted to a flashing station room decon and clean rooms converted t storage rooms and minor modifications to the restricted corridor in the core area first floor of the hecht building. All work will be done on per plans and per code. . Approved and reviewed under plans#2011-1632. Date: September 20, 2012Expiration date: August 30, 2013 | Permit id: Com2012-19948 | |||||
Complete renovation of an existing radiology suite on the 2nd flooor of sinai hospital including demolition of existing radiology suite and fitout of new interventional radiology room and adjacent support spaces. Includes relocation of a mechanical room entrance per plans as per code. Seperate permit will be required for sprinkler system and fire alaram. Date: April 21, 2011 Value: $560,000Expiration date: April 21, 2012 | Permit id: Com2011-08071 | |||||
Amend permit# com2011-08071 issued on 04/21/11 with plans# 2011-525 to add plumbing & hvac contractor as listed above original permit description:(com2011-08071)complete renovation of an existing radiology suite on the 2nd flooor of sinai hospital including demolition of existing radiology suite and fitout of new interventional radiology room and adjacent support spaces. Includes relocation of a mechanical room entrance per plans as per code. Seperate permit will be required for sprinkler system and fire alaram. Date: June 23, 2011Expiration date: April 21, 2012 | Permit id: Com2011-13846 | |||||
Amend permit#issued on 4-21-11 with plans#2011-525 to add electrical contractor as listed above. Original permit description:(com2011-08071)complete renovation of an existing radiology suite on the 2nd flooor of sinai hospital including demolition of existing radiology suite and fitout of new interventional radiology room and adjacent support spaces. Includes relocation of a mechanical room entrance per plans as per code. Seperate permit will be required for sprinkler system and fire alaram. Date: June 28, 2011Expiration date: April 21, 2012 | Permit id: Com2011-14205 | |||||
Amend permit#com2011-11414 issued on 7-22-11 w/plans#2011-766 to add prime contractor as stated above also amend to revise drawings; revised no. Of patient rooms relocated day rooms nourishment rooms as per plans as per code. Original permit description:(com2011-11414)interior fit out of 5th floor shell space of the south tower. Work includes 21 patient units rehab spaces and supporting spaces. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Date: September 22, 2011 Value: $4,500,000Expiration date: September 22, 2012 | Permit id: Com2011-17972 | |||||
Request for time extension on permit #com2010-028 issued on 04/01/ with original completion date of 10/01/11. Original permit description:(com2010-02800)interior demolition and fit out of space in the 4th floor to fit 4 new operating rooms a new cysto room and supporting staff spaces as per plans & as per code. Separate permit will be required for sprinkler system and fire alaram. Date: August 30, 2011Expiration date: April 1, 2012 | Permit id: Com2011-18884 | |||||
Amend permit#com2011-11414 issued on 7-22-11 w/plans#2011-1225 to add the plumber and hvac contractor as stated above. Original permit description:(com2011-11414)interior fit out of 5th floor shell space of the south tower. Work includes 21 patient units rehab spaces and supporting spaces. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Date: November 9, 2011Expiration date: July 12, 2012 | Permit id: Com2011-24523 | |||||
Amend permit com2011-11414 issued on 07/22/11 with plans #2011-766 to add the following additional work: added (8) additional patient rooms and corresponding support areas (all interior work no footprint required) . As per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Original permit description:(com2011-11414)interior fit out of 5th floor shell space of the south tower. Work includes 21 patient units rehab spaces and supporting spaces. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Date: January 20, 2012 Value: $5,400,000Expiration date: July 21, 2012 | Permit id: Com2011-25278 | |||||
Amend permit # com2011-11414 issued on 07-22-11 with plans # 2011-1225 to add electrical contractor as listed above. Original permit description:(com2011-11414)interior fit out of 5th floor shell space of the south tower. Work includes 21 patient units rehab spaces and supporting spaces. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Date: November 30, 2011Expiration date: July 21, 2012 | Permit id: Com2011-25853 | |||||
Fire alarm plans review for 5th floor renovation including: (2) booster panels (3) pull stations (3) monitor modules (46) smoke detectors (1) heat detector (3) duct smoke detectors (2) door holders (25) control modules (39) strobes (13) bell/strobes as per plans as per code. Date: February 21, 2012 Value: $49,500Expiration date: February 21, 2013 | Permit id: Com2012-01240 | |||||
Amend permit # com2011-25278 issued on 01-20-12 with plans # 2011-1732 to add plumbing contractor and hvac contractor as listed above. Original permit description:(com2011-25278)amend permit com2011-11414 issued on 07/22/11 with plans #2011-766 to add the following additional work: added (8) additional patient rooms and corresponding support areas (all interior work no footprint required) . As per plans and as per code. Separate permit will be required for sprinkler system and fire alaram. Original permit description:(com2011-11414)interior fit out of 5th floor shell space of the south tower. Work includes 21 patient units rehab spaces and supporting spaces. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Date: January 31, 2012Expiration date: July 21, 2012 | Permit id: Com2012-02167 | |||||
Amend permit #com2011-11414 issued on 07/21/11 with plans #2011-766 to add low voltage contractor as listed above. Original permit description:(com2011-11414)interior fit out of 5th floor shell space of the south tower. Work includes 21 patient units rehab spaces and supporting spaces. As per plans and as per code. Separate permit will be required for sprinkler system and fire alarm. Date: April 12, 2012Expiration date: July 21, 2012 | Permit id: Com2012-07708 | |||||
Amend permit#com2006-21063 issued on 12-11-07 w/plans#2006-1124 to name electrical contractor as stated above. Original permit description:(com2006-21063)vertical expansion of the existing cancer center including interior renovation of the existing admitting office/waiting area as per plans and code. Separate permit is required for sprinkler system. Per pud # 72 ordinance # 433 # 625 and 352 and final design of the planning commission of 9/22/05 c/o required on a seperate form upon completion Date: August 21, 2007Expiration date: December 11, 2007 | Permit id: Com2007-26008 | |||||
Amend permit #com2006-21063 issued on 12/4/06 with plans #2006-1124 to add contractor (s) as listed above. Original permit description:(com2006-21063)vertical expansion of the existing cancer center including interior renovation of the existing admitting office/waiting area as per plans and code. Separate permit is required for sprinkler system. Per pud # 72 ordinance # 433 # 625 and 352 and final design of the planning commission of 9/22/05 c/o required on a seperate form upon completion Date: August 22, 2007Expiration date: December 11, 2007 | Permit id: Com2007-26223 | |||||
Interior alteration of an existing procedure room control room and adjacent spaces to support the replacement of the imaging equipment on the second floor of the north wing of the general hospital. New ceilings walls and new flooring included in work. Separate permit will be required for sprinkler system and fire alaram. Date: January 25, 2008 Value: $848,000Expiration date: January 25, 2009 | Permit id: Com2008-01163 | |||||
Relocate 26 heads to accomodate new layout. Max pipe size 1" light hazard occupancy as per code. Date: November 20, 2009Expiration date: May 20, 2010 | Permit id: Com2009-27142 | |||||
Tenant fit-out of existing 3rd floor (shell) of the extisting south tower of sinai hospital to house a 36 patient room neuroscience unit. Work includes new interior partitions new ceilings new floor & wall finishes plumbing hvac & electrical as per plans and as per code. Separate permit will be required for sprinkler system and fire alarm . Date: August 10, 2006 Value: $5,397,100Expiration date: August 10, 2007 | Permit id: Com2006-13623 | |||||
Connect to existing 4" outlet and add (39) sprinklers in 4th floor zuckerburg office - blaustein bldg as per code and plans. Date: July 25, 2006 Value: $10,300Expiration date: January 25, 2007 | Permit id: Com2006-19178 | |||||
Vertical expansion of the existing cancer center including interior renovation of the existing admitting office/waiting area as per plans and code. Separate permit is required for sprinkler system. Per pud # 72 ordinance # 433 # 625 and 352 and final design of the planning commission of 9/22/05 c/o required on a seperate form upon completion Date: December 11, 2006 Value: $2,300,000Expiration date: December 11, 2007 | Permit id: Com2006-21063 | |||||
Amend permit # com2006-12806 issued on 6/22/06 with plan # 2006-6 to add contractors as listed aboveoriginal permit description:(com2006-12806)renovation of existing 1 381 sq ft of office space interior as per plans and code. Separate permit will be required for sprinkler system and fire alaram. Date: July 17, 2006Expiration date: January 17, 2007 | Permit id: Com2006-21678 | |||||
Amend permit #com2006-13623 issued on 8/10/06 with plans# 2006-668 to add contractors as listed aboveoriginal permit description:(com2006-13623)tenant fit-out of existing 3rd floor (shell) of the extisting south tower of sinai hospital to house a 36 patient room neuroscience unit. Work includes new interior partitions new ceilings new floor & wall finishes plumbing hvac & electrical as per plans and as per code. Separate permit will be required for sprinkler system and fire alarm . Date: October 18, 2006Expiration date: August 10, 2007 | Permit id: Com2006-32240 |