ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Apt #1) at living room, bedroom#2 and kitchen : install (2 each rooms) window guards complete. Remove all work related debris. Date: June 24, 2008 Value: $135Permit type: Gc | Permit id: E836153 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: July 12, 2007Permit type: Delead | Permit id: E801739 | |||||
Doh clean of the following areas: 1) apartment entrance 2) living room from entrance 3) front bedroom from living room 4) kitchen 5) bathroom fro Date: May 28, 2002 Value: $304Permit type: Delead | Permit id: E220993 | |||||
P/a: secure stairs tread 3rd tread down 2nd story intermediate landing. Date: November 13, 2001 Value: $94Permit type: Gc | Permit id: E208501 | |||||
Make all necessary repairs to gas fired boiler to restore to good working condition. Restore hot water to building. Note: contractor must call l Date: September 10, 2001Permit type: Heat | Permit id: E203649 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: May 27, 2008Permit type: Delead | Permit id: E833201 | |||||
Perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 24, 2008Permit type: Delead | Permit id: E835347 | |||||
Doh lead abatement violation: attached scope of work thoroughly remove all lead violations as per department of health order to abate nuisance, orde Date: April 23, 2001Permit type: Delead | Permit id: E120294 | |||||
Doh lead abatement violation: as per rc #0040078 (asbestway) and attached scope of work thoroughly remove all lead violations as per department of Date: September 19, 2000Permit type: Delead | Permit id: E104769 | |||||
As per rc #20010019679c (emsl), perform total lead analysis of 15 dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 method Date: June 6, 2002Permit type: Delead | Permit id: E221516 |