ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Temporary construction entrance construct temporary stabilized construction entrance. Proper precautions must be taken to keep the roadways free of mud, debris or other obstructions. Prior to release this permit remove construction entrance. Complete repair (restoration of right of way including haul routes) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be complete as directed by the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). Md dnr permit and mc dps tree protection plan approval are required prior to remove street trees. Repair, sea Date: October 24, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 324647 | |||||
Repair and provide lining in sewer main and reset/replace sewer manhole frame and cover in accordance with wssc plans. Work shall comply with the current montgomery county specifications for utility construction permit and the direction of the dps inspector. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Date: May 20, 2011Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 269509 |