ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 100 [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] installation of a 4. 68(kw) solar photovoltaic system will be installed on roof of residence. Date: January 6, 2014 Contractor: Puget Sound Solar LlcPermit type: Electrical | Permit status: Permit closed | Completion date: January 29, 2014 | Expiration date: January 6, 2015 | Current use: Single family / duplex | Permit id: 6398563 | |||||
SCORE 56 Replace existing failing concrete stair and retaining wall with new concrete stair/walls at west property line and new rockery retaining wall along south yard, per plans. Applicant: Zaputil, Jean | Permit type: Construction | Permit status: Permit closed | Completion date: November 2, 2009 | Expiration date: December 9, 2010 | Current use: Single family / duplex | Permit id: 6171296 |