ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
(apt # 5b) at room north (1): trace and repair the source of water leak and loose plaster. At room north (1): ceiling 187 sq. Ft. Of sheetrock, north Date: February 9, 2009Permit type: Gc | Permit id: E925429 | |||||
Apt. 3a: demo bath room ceiling, repair conceal water leak. Repair bath room ceiling with resistant sheetrock, prime and paint ceiling. Note: c Date: January 31, 2005Permit type: Gc | Permit id: E518767 | |||||
As per rc #2005001338401 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: March 3, 2005Permit type: Delead | Permit id: E523068 | |||||
(apt # 3a) at room north (3) and bathroom: trace and repair the source of water leak and loose plaster. At room north (3): ceiling and/or wall damage Date: October 7, 2008Permit type: Gc | Permit id: E910937 | |||||
(apt # 3a) at room north (3) and bathroom: trace and repair the source of water leak and loose plaster. At room north (3): ceiling and or wall damage Date: October 7, 2008Permit type: Gc | Permit id: E910937 | |||||
Apt #3b) at private hall : repair leak coming from bathroom above at apt wall and repair tile wall after work. Demo defective area at dining area, c Date: June 3, 2008Permit type: Gc | Permit id: E833398 | |||||
At apt #3b; at bathroom. Broken / defective plastered ceiling. Demo and repair with sheet rock . At ceiling and all walls approx. 14sq. Ft. Date: November 28, 2016Permit type: Gc | Permit id: Eh06879 | |||||
At apt #3b; at bathroom. Broken defective plastered ceiling. Demo and repair with sheet rock . At ceiling and all walls approx. 14sq. Ft. Date: November 28, 2016Permit type: Gc | Permit id: Eh06879 | |||||
Apt. #3d ,replace broken glass panes at kitchen lower window sash and bedroom lower window sash. Also vendor should make sure tenant can open and c Date: June 5, 2012Permit type: Gc | Permit id: Ec30018 | |||||
Locate and repair the leak in bathroom ceiling. Repair and paint the bathroom ceiling (16 sq. Ft.). Remove all mold mildew from bathroom walls. Tena Date: June 29, 2004Permit type: Gc | Permit id: E426631 | |||||
Bedroom remove mold from north wall and window frame . Apply stainkiller and paint to match. Bedroom (2) remove mold and mildew from north and west Date: February 27, 2003Permit type: Gc | Permit id: E315742 | |||||
Replace missing wire glass panes, total 3, at 6th story public hall casement window frame. Vendor must chaulk around perimeter wire glass after in Date: May 30, 2012Permit type: Gc | Permit id: Ec30017 | |||||
Pp; bulkhead:- demo and repair the entire bulkhead ceiling. Approx; 1 sq ft and approx; 3 sq ft. Of the walls compound, prime and paint all Date: August 28, 2012Permit type: Gc | Permit id: Ed04495 | |||||
(local law# 1 - clean only). Thoroughly re-clean the following areas as per new york city administrative code 27-2506. 11 and as noted in the scope of Date: December 20, 2011 Value: $146Permit type: Delead | Permit id: Ec15856 | |||||
Apt 6f; living room; install 1 w/g stop, reinstall 1 w/g stop and 1 w/g; kitchen; reinstall 1 w/g and install 2 w/g stops. Date: September 22, 2011 Value: $60Permit type: Gc | Permit id: Ec07990 | |||||
Apt 6c; living room; install 2 w/g stops and reinstall 1 w/g; bedroom ; install 3 w/g stops; bathroom; reinstall 1 w/g stop and install 1 w/g stop. Date: September 22, 2011 Value: $58Permit type: Gc | Permit id: Ec07984 | |||||
Apt 4a; living room; install 2 w/g stops; kitchen; reinstall 1 w/g ; bedroom 1; reinstall 2 w/gs; bathroom; reinstall 1 w/g; bedroom 2; reinstall Date: September 22, 2011 Value: $77Permit type: Gc | Permit id: Ec07980 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: August 3, 2010 Value: $494Permit type: Delead | Permit id: Eb06168 | |||||
L/l 38 abate: abate as per rc #0040077 . Thoroughly remove all lead violations as per new york city health code section 173. 14 and as noted in the sco Date: October 16, 2000Permit type: Delead | Permit id: E107374 | |||||
L l 38 abate: abate as per rc #0040077 . Thoroughly remove all lead violations as per new york city health code section 173. 14 and as noted in the sco Date: October 16, 2000Permit type: Delead | Permit id: E107374 | |||||
Apt 4a; living room; install 2 w g stops; kitchen; reinstall 1 w g ; bedroom 1; reinstall 2 w gs; bathroom; reinstall 1 w g; bedroom 2; reinstall Date: September 22, 2011 Value: $77Permit type: Gc | Permit id: Ec07980 | |||||
Apt 6c; living room; install 2 w g stops and reinstall 1 w g; bedroom ; install 3 w g stops; bathroom; reinstall 1 w g stop and install 1 w g stop. Date: September 22, 2011 Value: $58Permit type: Gc | Permit id: Ec07984 | |||||
Apt 6f; living room; install 1 w g stop, reinstall 1 w g stop and 1 w g; kitchen; reinstall 1 w g and install 2 w g stops. Date: September 22, 2011 Value: $60Permit type: Gc | Permit id: Ec07990 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: September 13, 2012Permit type: Delead | Permit id: Ed06194 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: June 26, 2013Permit type: Delead | Permit id: Ed25207 | |||||
In apartment #3g bathroom trace and locate leak above basin and tub make repair demolish ceiling and wall sheetrock and plaster patch, tape, compound, Date: May 24, 2006Permit type: Gc | Permit id: E634506 | |||||
Perform total lead analysis of 13 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 15, 2011Permit type: Delead | Permit id: Ec15231 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: January 31, 2012Permit type: Delead | Permit id: Ec19391 | |||||
L/l 38 abate: abate as per rc # k114426 thoroughly remove all lead violations as per new york city health code section 173. 14 and as noted in the sco Date: February 22, 2001Permit type: Delead | Permit id: E114324 | |||||
L l 38 abate: abate as per rc # k114426 thoroughly remove all lead violations as per new york city health code section 173. 14 and as noted in the sco Date: February 22, 2001Permit type: Delead | Permit id: E114324 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: February 13, 2012Permit type: Delead | Permit id: Ec20390 | |||||
As per mini rc (apt#1-f) supply and install total (11) window guards as follows: bedroom#1 (2), bedroom#2 (3), bedroom#3 (2), kitchen (1), livin Date: January 26, 2012Permit type: Gc | Permit id: Ec18583 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 10, 2010Permit type: Delead | Permit id: Eb09291 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 17, 2010Permit type: Delead | Permit id: Eb09964 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: November 14, 2011Permit type: Delead | Permit id: Ec12414 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: January 17, 2012Permit type: Delead | Permit id: Ec18091 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: August 3, 2010Permit type: Delead | Permit id: Eb05893 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 15, 2011Permit type: Delead | Permit id: Ec15225 | |||||
Apt # 1a - bathroom - install approx 32 sq. Ft. Of bathroom ceramic floor tiles. Remove all work related debris. Non- s. W. P. Note: contractor Date: November 5, 2010Permit type: Gc | Permit id: Eb13990 | |||||
Apt #1a) at bathroom wall : install new electrical outlet and switch. Remove all work related debris. Non s. W. P. Note: contractor must conta Date: November 18, 2008Permit type: Elec | Permit id: E915072 | |||||
Perform total lead analysis of 09 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 18, 2008Permit type: Delead | Permit id: E919578 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 15, 2009Permit type: Delead | Permit id: Ea09444 | |||||
Apt #1a) at bathroom : square off ceiling, install 5/8 water proof sheetrock, tape, prime and paint bathroom ceiling. Remove all work related debris Date: November 18, 2008Permit type: Gc | Permit id: E915071 | |||||
Apt #1a) at bathroom : square off ceiling, install 5 8 water proof sheetrock, tape, prime and paint bathroom ceiling. Remove all work related debris Date: November 18, 2008Permit type: Gc | Permit id: E915071 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: April 9, 2010Permit type: Delead | Permit id: Ea32075 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 15, 2011Permit type: Delead | Permit id: Ec15233 | |||||
As per rc # 2007003353401 (eastern anal. Svc.,inc), perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8 Date: June 7, 2007Permit type: Delead | Permit id: E732290 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: April 15, 2010Permit type: Delead | Permit id: Ea32097 | |||||
( apt 6f ) at kitchen => replace with new the (2) broken / defective glass at the upper and lower sash window. At kitchen=> replace with new the brok Date: May 2, 2011Permit type: Gc | Permit id: Eb29690 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: May 3, 2010Permit type: Delead | Permit id: Ea34380 | |||||
( apt 6f ) at kitchen => replace with new the (2) broken defective glass at the upper and lower sash window. At kitchen=> replace with new the brok Date: May 2, 2011Permit type: Gc | Permit id: Eb29690 | |||||
Perform total lead analysis of 06 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 21, 2012Permit type: Delead | Permit id: Ec31953 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: December 27, 2011Permit type: Delead | Permit id: Ec15535 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: November 14, 2011Permit type: Delead | Permit id: Ec12412 | |||||
As per mini rc apt. #4a) supply and install 2 window guards complete at entire apartment. Remove all work related debris contractor mus Date: June 22, 2012Permit type: Gc | Permit id: Ec30916 | |||||
Perform total lead analysis of 12 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 8, 2011Permit type: Delead | Permit id: Ec14621 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 15, 2011Permit type: Delead | Permit id: Ec15228 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: November 14, 2011Permit type: Delead | Permit id: Ec12333 | |||||
Apt 5e) at bathroom : trace, locate, and repair concealed water leak. At bathroom demolish and repair 8 sq. Ft. Of ceiling and sq. Ft. Of west wall Date: September 14, 2007Permit type: Gc | Permit id: E806051 | |||||
Apartment #1b, bathroom: provide and install a new glass shower door to replace the existing broken one. Leave in safe condition, and in propper Date: September 7, 2017Permit type: Gc | Permit id: Ei02935 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: April 5, 2017Permit type: Delead | Permit id: Eh14922 | |||||
As per the requirement contract with h. P. D and h. P. D doh guidelines, install repair window guards ---- apt # 2f ---- install one (1) n Date: May 1, 2017Permit type: Gc | Permit id: Eh14123 |