ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 96 Roof mount residential solar pv with (n) 225 amp msp to (e) 2 amp msp with added (n) 2 a sub panel (in line with solar) and added (e) 2 amp sub panel for existing sfd- 12 27 2017 plan change see c of a......... Jm 11-27-17 planchange see c of a for detail... Lmy the scope of work is limited to upgrades of the existing main service panel, relocation of the existing loads, new sub-panels to accomodate solar loads, and relocation of existing panels in compliance with all zoning ordinances only, does not include additional new main service panels. This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: October 26, 2017 Contractor: Semper Solaris Construction IncPermit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- |