| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Meetings for schnitzer project Date: December 1, 2014Permit type: Reviews | Permit status: Approved | Completion date: November 24, 2014 | Permit id: 2014-241539-000 | |||||
Tier 2 zoning confirmation letter Permit type: Land use review | Permit status: Closed | Completion date: December 10, 2014 | Permit id: 2014-247581-000 | |||||
Tier 2 zoning confirmation letter Permit type: Land use review | Permit status: Letter sent | Completion date: January 16, 2015 | Permit id: 2014-247581-000 | |||||
Lot confirmation for two lots. Permit type: Land use review | Permit status: Closed | Completion date: December 19, 2014 | Permit id: 2014-251765-000 | |||||
Lot confirmation for two lots. Permit type: Land use review | Permit status: Void/withdrawn | Completion date: January 13, 2015 | Permit id: 2014-251765-000 | |||||
F15/ 17th floor; ti, remove communication stair, remove partition walls on door side of offices, replace with doors, full height relites, new walls for conference rooms, one w/ full height/length glass wall, break room, open office space, flooring, ceiling, elec, plbg, finishes Date: December 23, 2014Permit type: Reviews | Permit status: Approved | Completion date: December 23, 2014 | Permit id: 2014-253012-000 | |||||
F15/ 17th floor; ti, remove communication stair, remove partition walls on door side of offices, replace with doors, full height relites, new walls for conference rooms, one w/ full height/length glass wall, break room, open office space, flooring, ceiling, elec, plbg, finishes Date: January 5, 2015Permit type: Intake | Permit status: Closed | Completion date: December 23, 2014 | Permit id: 2014-253021-000 | |||||
B1/ 17-18 floor stairwell infill Date: December 23, 2014Permit type: Reviews | Permit status: Approved | Completion date: December 23, 2014 | Permit id: 2014-253180-000 | |||||
B1/ 17-18th floor stairwell infill Date: January 16, 2015Permit type: Intake | Permit status: Closed | Completion date: December 23, 2014 | Permit id: 2014-253183-000 | |||||
B1/ spray applied fireproofing Date: March 13, 2015Permit type: Intake | Permit status: Closed | Completion date: March 13, 2015 | Permit id: 2014-253183-Dfs | |||||
Plumbing renovation at koin tower 17th floor for charter school capital1 sink, 2 dw Date: December 30, 2014Permit type: Intake | Permit status: Closed | Completion date: December 26, 2014 | Permit id: 2014-253824-000 | |||||
9th fl evanta cubicles & equipment Date: January 12, 2015Permit type: Reviews | Permit status: Approved | Completion date: January 12, 2015 | Permit id: 2015-103490-000 | |||||
9th fl evanta cubicles & equipment - power/voice/data Date: January 12, 2015Permit type: Intake | Permit status: Closed | Completion date: January 12, 2015 | Permit id: 2015-103493-000 | |||||
17th fl charter school capital - power/voice/data Date: January 14, 2015Permit type: Intake | Permit status: Closed | Completion date: January 14, 2015 | Permit id: 2015-104603-000 | |||||
Zoning confirmation letter - tier 3 Permit type: Land use review | Permit status: Closed | Completion date: January 14, 2015 | Permit id: 2015-104841-000 | |||||
Zoning confirmation letter - tier 3 Permit type: Land use review | Permit status: Letter sent | Completion date: January 29, 2015 | Permit id: 2015-104841-000 | |||||
9th & 10th floor security - rough-in only Date: January 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: January 18, 2015 | Permit id: 2015-106848-000 | |||||
9th & 10th floors - security - rough-in only Date: January 18, 2015Permit type: Intake | Permit status: Closed | Completion date: January 18, 2015 | Permit id: 2015-106849-000 | |||||
Reviews Date: January 27, 2015Permit status: Closed | Completion date: January 27, 2015 | Permit id: 2015-111155-000 | |||||
17-18th floor stairwell infill - power Date: February 4, 2015Permit type: Intake | Permit status: Closed | Completion date: February 4, 2015 | Permit id: 2015-114705-000 | |||||
Add and relocate sprinklers to accomodate charter school capitol t. I. Using standard response heads to match existing. 3 sets of plans. Date: February 5, 2015Permit type: Intake | Permit status: Closed | Completion date: February 5, 2015 | Permit id: 2015-115674-000 | |||||
B1/ 17th floor; ti, remove communication stair - install 3 new vav zones Date: March 4, 2015Permit type: Intake | Permit status: Closed | Completion date: February 12, 2015 | Permit id: 2015-118743-000 | |||||
Install 16 fire alarm strobes for charter school capitol t. I. 2 sets of plans. Date: March 3, 2015Permit type: Intake | Permit status: Closed | Completion date: March 3, 2015 | Permit id: 2015-128051-000 | |||||
Lobby remodel Date: March 19, 2015Permit type: Reviews | Permit status: Approved | Completion date: March 19, 2015 | Permit id: 2015-136981-000 | |||||
Lobby remodel Permit type: Intake | Permit status: Closed | Completion date: March 19, 2015 | Permit id: 2015-136984-000 | |||||
F4/ 3rd floor, provide lobby security door, maglocks, etc Date: April 1, 2015Permit type: Reviews | Permit status: Approved | Completion date: April 1, 2015 | Permit id: 2015-143491-000 | |||||
3rd fl schnitzer steel lobby security - access control Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-153091-000 | |||||
B1/ 14th floor - walls & ceiling demolition. No occupancy this permit Date: May 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 8, 2015 | Permit id: 2015-167283-000 | |||||
F1/ 14th floor - walls & ceiling demolition. No occupancy this permit Date: June 1, 2015Permit type: Intake | Permit status: Closed | Completion date: May 8, 2015 | Permit id: 2015-167301-000 | |||||
F18/ 5th floor aetna new tenant office remodel, new walls for offices, reception area, conference room and break room Date: July 6, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-196833-000 | |||||
F18/ 5th floor aetna new tenant office remodel, new walls for offices, reception area, conference room and breakroom Permit type: Intake | Permit status: Closed | Completion date: July 6, 2015 | Permit id: 2015-196836-000 | |||||
F5/ schnitzer steel - south 1/2 11,216 sq ft 3rd floor and 26,603 sq ft 4th floor new tenant remodel of existing tenant space Date: April 24, 2013Permit type: Intake | Permit status: Closed | Completion date: March 26, 2013 | Permit id: 2013-132308-000 | |||||
F15/ 10th floor evanta new tenant office remodel Date: August 9, 2013Permit type: Intake | Permit status: Closed | Completion date: August 1, 2013 | Permit id: 2013-187912-000 | |||||
Add five new sprinklers to protect under new staircase---2 sets of plans Date: October 23, 2013Permit type: Intake | Permit status: Closed | Completion date: October 23, 2013 | Permit id: 2013-220028-000 | |||||
10th fl evanta ti (additional work beyond original scope)- powerpr# koin 1104 Date: January 24, 2014Permit type: Intake | Permit status: Closed | Completion date: January 24, 2014 | Permit id: 2014-109484-000 | |||||
Construction Date: June 20, 2014Permit type: Intake | Permit status: Complete | Completion date: June 6, 2014 | Permit id: 2014-166592-000 | |||||
Push/pull 2. 5 ton water source heat pump above t-bar Date: September 2, 2014Permit type: Intake | Permit status: Closed | Completion date: September 2, 2014 | Permit id: 2014-206996-000 | |||||
5th fl aetna ti - power Date: July 22, 2015Permit type: Intake | Permit status: Closed | Completion date: July 22, 2015 | Permit id: 2015-205368-000 | |||||
B2/ koin 6 news - lower level 53 & - remove selected walls, and frame new partition walls Date: July 22, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 22, 2015 | Permit id: 2015-205585-000 | |||||
Plumbing renovation at koin tower 5th floor for aetna tibreak sink Date: July 27, 2015Permit type: Intake | Permit status: Closed | Completion date: July 27, 2015 | Permit id: 2015-207536-000 | |||||
Koin 6 news - lwr lvl 53 & - remove & add walls - power Date: August 17, 2015Permit type: Intake | Permit status: Closed | Completion date: August 17, 2015 | Permit id: 2015-218950-000 | |||||
F16/ suite 830; remove selected walls, open up space, ceiling, elec Date: August 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: August 18, 2015 | Permit id: 2015-220212-000 | |||||
#8 charles schwab ti - power Date: September 30, 2015Permit type: Intake | Permit status: Closed | Completion date: August 24, 2015 | Permit id: 2015-224352-000 | |||||
Relocate fire sprinklers for ti. Date: August 27, 2015Permit type: Intake | Permit status: Closed | Completion date: August 27, 2015 | Permit id: 2015-227228-000 | |||||
Limited energy electrical install 9 camera cctv system Date: September 3, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: September 15, 2015 | Permit id: 2015-231205-000 | |||||
B2/ suite 3 - skanska - add 2 small conference rooms to existing office space Date: September 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 8, 2015 | Permit id: 2015-233016-000 | |||||
#3 skanska add conference rooms #3 & 4 - power/voice/data Date: November 10, 2015Permit type: Intake | Permit status: Closed | Completion date: September 14, 2015 | Permit id: 2015-235714-000 | |||||
5th fl aetna ti - voice/data & a/v cabling Date: September 15, 2015Permit type: Intake | Permit status: Closed | Completion date: September 15, 2015 | Permit id: 2015-236837-000 | |||||
5th fl aetna ti - a/v terminations Date: September 15, 2015Permit type: Intake | Permit status: Closed | Completion date: September 15, 2015 | Permit id: 2015-236855-000 | |||||
Add 2 new strobes and split floor into four separate loops. Date: September 16, 2015Permit type: Intake | Permit status: Closed | Completion date: September 16, 2015 | Permit id: 2015-237328-000 | |||||
Fire alarm device replacement for elevator upgrade. Date: September 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 18, 2015 | Permit id: 2015-238542-000 | |||||
#8 charles schwab - security system Date: September 24, 2015Permit type: Intake | Permit status: Closed | Completion date: September 24, 2015 | Permit id: 2015-241892-000 | |||||
#8 charles schwab - voice/data Date: September 24, 2015Permit type: Intake | Permit status: Closed | Completion date: September 24, 2015 | Permit id: 2015-241927-000 | |||||
F2/ lobby renovations on multiple floors. Create atrium by removing part of the second floor deck and framing, add new stairs and beams, create spaces for future cafe on the first floor and future tenant on second floor, new bike storage room, update handrails and finishes to existing first floor stairs. Finish and lighting upgrades to elevator lobbies on flr 6, 7, 11 & 16 Date: October 23, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 23, 2015 | Permit id: 2015-255388-000 | |||||
F2/ lobby renovations on multiple floors. Create atrium by removing part of the second floor deck and framing, add new stairs and beams, create spaces for future cafe on the first floor and future tenant on second floor, new bike storage room, update handrails and finishes to existing first floor stairs. Finish and lighting upgrades to elevator lobbies on flr 6, 7, 11 & 16 Date: February 2, 2016Permit type: Intake | Permit status: Closed | Completion date: October 23, 2015 | Permit id: 2015-255401-000 | |||||
F2/revision for vestibule and entry modifications, north entry, addition to doors at east entry. Date: March 23, 2016Permit type: Intake | Permit status: Closed | Completion date: March 3, 2016 | Permit id: 2015-255401-Rev | |||||
11th fl demonstration suite Date: November 2, 2015Permit type: Reviews | Permit status: Approved | Completion date: November 2, 2015 | Permit id: 2015-259363-000 | |||||
11th fl demonstration suite - lights & outlets Date: November 2, 2015Permit type: Intake | Permit status: Closed | Completion date: November 2, 2015 | Permit id: 2015-259370-000 | |||||
Repositioning - atrium, bike room, lobbies upgrades 1st, mez, 6,7,11,16th floors - power Permit type: Intake | Permit status: Closed | Completion date: November 10, 2015 | Permit id: 2015-262822-000 | |||||
Koin tower, 2- sink rough-ins, 1- bottle filler Permit type: Intake | Permit status: Closed | Completion date: November 13, 2015 | Permit id: 2015-264871-000 | |||||
Suite 300-sprinklers-add/relocate for conference rooms. Date: December 1, 2015Permit type: Intake | Permit status: Closed | Completion date: November 30, 2015 | Permit id: 2015-270657-000 | |||||
Adding 3 strobes. Date: December 16, 2015Permit type: Intake | Permit status: Closed | Completion date: December 16, 2015 | Permit id: 2015-278285-000 | |||||
Street tree pruning permit Date: February 23, 2016Permit type: D - permit request | Permit status: Permit issued | Completion date: February 23, 2016 | Permit id: 2016-124203-000 | |||||
Lobby renovations on multiple floors-relocate sprinklers due to new ceilings, add sprinklers under new stairs. Date: March 16, 2016Permit type: Intake | Permit status: Closed | Completion date: March 14, 2016 | Permit id: 2016-134498-000 | |||||
#14 k & l gates wireless access points (waps) - datapr# koin 1094 Date: October 22, 2012Permit type: Intake | Permit status: Closed | Completion date: October 22, 2012 | Permit id: 2012-197153-000 | |||||
Complaint received - generator noise from varianced construction audible in nearby building. Permit type: Request | Permit status: Closed | Completion date: October 30, 2013 | Permit id: 2013-222959-000 | |||||
Complaint received - generator noise from varianced construction audible in nearby building. Permit type: Request | Permit status: Closed | Completion date: March 23, 2016 | Permit id: 2013-222959-000 | |||||
3rd fl schnitzer steel lobby security - access control Date: July 23, 2015Permit type: Intake | Permit status: Closed | Completion date: April 20, 2015 | Permit id: 2015-153091-000 | |||||
F18/ 5th floor aetna new tenant office remodel, new walls for offices, reception area, conference room and breakroom Date: July 15, 2015Permit type: Intake | Permit status: Closed | Completion date: July 6, 2015 | Permit id: 2015-196836-000 | |||||
B2 koin 6 news - lower level 53 & - remove selected walls, and frame new partition walls Date: July 22, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 22, 2015 | Permit id: 2015-205585-000 | |||||
F16 suite 830; remove selected walls, open up space, ceiling, elec Date: August 18, 2015Permit type: Reviews | Permit status: Approved | Completion date: August 18, 2015 | Permit id: 2015-220212-000 | |||||
B2 suite 3 - skanska - add 2 small conference rooms to existing office space Date: September 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: September 8, 2015 | Permit id: 2015-233016-000 | |||||
#3 skanska add conference rooms #3 & 4 - power voice data Date: November 10, 2015Permit type: Intake | Permit status: Closed | Completion date: September 14, 2015 | Permit id: 2015-235714-000 | |||||
5th fl aetna ti - voice data & a v cabling Date: September 15, 2015Permit type: Intake | Permit status: Closed | Completion date: September 15, 2015 | Permit id: 2015-236837-000 | |||||
5th fl aetna ti - a v terminations Date: September 15, 2015Permit type: Intake | Permit status: Closed | Completion date: September 15, 2015 | Permit id: 2015-236855-000 | |||||
#8 charles schwab - voice data Date: September 24, 2015Permit type: Intake | Permit status: Closed | Completion date: September 24, 2015 | Permit id: 2015-241927-000 | |||||
F2 lobby renovations on multiple floors. Create atrium by removing part of the second floor deck and framing, add new stairs and beams, create spaces for future cafe on the first floor and future tenant on second floor, new bike storage room, update handrails and finishes to existing first floor stairs. Finish and lighting upgrades to elevator lobbies on flr 6, 7, 11 & 16 Date: October 23, 2015Permit type: Reviews | Permit status: Approved | Completion date: October 23, 2015 | Permit id: 2015-255388-000 | |||||
F2 lobby renovations on multiple floors. Create atrium by removing part of the second floor deck and framing, add new stairs and beams, create spaces for future cafe on the first floor and future tenant on second floor, new bike storage room, update handrails and finishes to existing first floor stairs. Finish and lighting upgrades to elevator lobbies on flr 6, 7, 11 & 16 Date: February 2, 2016Permit type: Intake | Permit status: Closed | Completion date: October 23, 2015 | Permit id: 2015-255401-000 | |||||
F2 revision for vestibule and entry modifications, north entry, addition to doors at east entry. Date: March 23, 2016Permit type: Intake | Permit status: Closed | Completion date: March 3, 2016 | Permit id: 2015-255401-Rev | |||||
Repositioning - atrium, bike room, lobbies upgrades 1st, mez, 6,7,11,16th floors - power Permit type: Intake | Permit status: Closed | Completion date: November 10, 2015 | Permit id: 2015-262822-000 | |||||
Koin tower, 2- sink rough-ins, 1- bottle filler Permit type: Intake | Permit status: Closed | Completion date: November 13, 2015 | Permit id: 2015-264871-000 | |||||
Suite 300-sprinklers-add relocate for conference rooms. Date: December 1, 2015Permit type: Intake | Permit status: Closed | Completion date: November 30, 2015 | Permit id: 2015-270657-000 | |||||
Complaint received - generator noise from varianced construction audible in nearby building. Permit type: Request | Permit status: Closed | Completion date: October 30, 2013 | Permit id: 2013-222959-000 | |||||
Complaint received - generator noise from varianced construction audible in nearby building. Permit type: Request | Permit status: Closed | Completion date: March 23, 2016 | Permit id: 2013-222959-000 | |||||
F15 17th floor; ti, remove communication stair, remove partition walls on door side of offices, replace with doors, full height relites, new walls for conference rooms, one w full height length glass wall, break room, open office space, flooring, ceiling, elec, plbg, finishes Date: January 5, 2015Permit type: Intake | Permit status: Closed | Completion date: December 23, 2014 | Permit id: 2014-253021-000 | |||||
F4 3rd floor, provide lobby security door, maglocks, etc Date: April 8, 2015Permit type: Intake | Permit status: Closed | Completion date: April 1, 2015 | Permit id: 2015-143494-000 | |||||
B1 14th floor - walls & ceiling demolition. No occupancy this permit Date: May 8, 2015Permit type: Reviews | Permit status: Approved | Completion date: May 8, 2015 | Permit id: 2015-167283-000 | |||||
F1 14th floor - walls & ceiling demolition. No occupancy this permit Date: June 1, 2015Permit type: Intake | Permit status: Closed | Completion date: May 8, 2015 | Permit id: 2015-167301-000 | |||||
F18 5th floor aetna new tenant office remodel, new walls for offices, reception area, conference room and break room Date: July 6, 2015Permit type: Reviews | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2015-196833-000 | |||||
F18 5th floor aetna new tenant office remodel, new walls for offices, reception area, conference room and breakroom Date: July 15, 2015Permit type: Intake | Permit status: Closed | Completion date: July 6, 2015 | Permit id: 2015-196836-000 | |||||
Repair koin tower: replace handset brick at top of tower, reroof minor roofs at top. Date: September 18, 2000Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: June 25, 2002 | Current use: Apartments/condos (3 or more units) | Permit id: 2000-163413-000 | |||||
Rooftop radio antennas & equipment, remodel 34th floor for equipment room Date: April 11, 2001Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: February 25, 2002 | Current use: Business | Permit id: 2000-194717-000 | |||||
Scaffolding setup Date: December 3, 2002Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 30, 2003 | Current use: Business | Permit id: 2002-153724-000 | |||||
Ti - add interior partition to divide server room - 4th floor Date: December 24, 2009Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 30, 2010 | Current use: Business | Permit id: 2009-180655-000 |