ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Core and shell renovation of historic building for future (b) tenants, change of occupancy from (s1) to (b), remodel all 3 stories of annex portion of building; includes seismic upgrade to annex. Includes seismic upgrades to adjacent kalberer tower per stipulation of temporary certificate of occupancy of permit 00-159263co; ; site work includes work in row and street trees/landscaping Date: March 7, 2016Permit type: Application | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-234960-000 | |||||
Demo interior non structural elements and some structural floor slab inside unoccupied mason ehrman annex building. Includes demo of a section of floor slab for construction access to the basement. No work in adjacent kalberer building this permit. Date: November 25, 2015Permit type: Application | Permit status: Approved | Completion date: October 30, 2015 | Permit id: 2015-234960-Dmo | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Application | Permit status: Approved | Completion date: April 1, 2016 | Permit id: 2015-234960-Rev | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Issuance/intake | Permit status: Intake | Completion date: April 1, 2016 | Permit id: 2015-234960-Rev | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Process management | Permit status: Closed | Completion date: April 5, 2016 | Permit id: 2015-234960-Rev | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Planning and zoning | Permit status: Not reqd | Completion date: April 1, 2016 | Permit id: 2015-234960-Rev | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Site development | Permit status: Approved | Completion date: April 7, 2016 | Permit id: 2015-234960-Rev | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Structural | Permit status: Approved | Completion date: April 14, 2016 | Permit id: 2015-234960-Rev | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Water bureau review | Permit status: Not reqd | Completion date: April 6, 2016 | Permit id: 2015-234960-Rev | |||||
Need plans Permit type: Intake | Permit status: Approved | Completion date: September 24, 2015 | Permit id: 2015-241649-000 | |||||
Need plans Permit type: Life safety | Permit status: Not reqd | Completion date: September 24, 2015 | Permit id: 2015-241649-000 | |||||
Need plans Permit type: Fire bureau | Permit status: Not reqd | Completion date: September 24, 2015 | Permit id: 2015-241649-000 | |||||
Sprinkler - alterations to sprinkler system for bldg renovation, including new 4 service to existing system Date: April 12, 2016Permit type: Intake | Permit status: Approved | Completion date: March 11, 2016 | Permit id: 2016-133932-000 | |||||
Move generator day tank 4ft south and re-pipe for seismic work see permit 15-234960cogenerator located in the basement. Surface test piping. Date: March 11, 2016Permit type: Intake | Permit status: Closed | Completion date: March 11, 2016 | Permit id: 2016-133936-000 | |||||
Update interior and ready for ti Permit type: Intake | Permit status: Closed | Completion date: April 4, 2016 | Permit id: 2016-144660-000 | |||||
Office renovation and add (3) sets of mens and womens restrooms Date: April 15, 2016Permit type: Intake | Permit status: Closed | Completion date: April 15, 2016 | Permit id: 2016-153316-000 | |||||
Core and shell renovation of historic building for future (b) tenants, change of occupancy from (s1) to (b), remodel all 3 stories of annex portion of building; includes seismic upgrade to annex. Includes seismic upgrades to adjacent kalberer tower per stipulation of temporary certificate of occupancy of permit 00-159263co; ; site work includes work in row and street trees landscaping Date: March 7, 2016Permit type: Application | Permit status: Approved | Completion date: September 11, 2015 | Permit id: 2015-234960-000 | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Application | Permit status: Approved | Completion date: April 1, 2016 | Permit id: 2015-234960-Rev | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Issuance/intake | Permit status: Intake | Completion date: April 1, 2016 | Permit id: 2015-234960-Rev | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Process management | Permit status: Closed | Completion date: April 5, 2016 | Permit id: 2015-234960-Rev | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Planning and zoning | Permit status: Not reqd | Completion date: April 1, 2016 | Permit id: 2015-234960-Rev | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Site development | Permit status: Approved | Completion date: April 7, 2016 | Permit id: 2015-234960-Rev | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Structural | Permit status: Approved | Completion date: April 14, 2016 | Permit id: 2015-234960-Rev | |||||
Revision-modification to the length of tower east shear wall (at grid line 9. 8 & appprox. Between grid lines b-d; level 1-level 7updates to g008 occupant safety plan egress strategy at stair s1 vesibules(grid line d & between grid lines 9-10; level2-level 7). Use existing vestibules at stair s1 in lieu of temporary vestibules. Modifications to the deck-edge support structural framing along west side of tower (at grid line 1. 8 & between grid lines b-h; basement -l7)revise location of temporary partition at basement between grids e and f and grids 8 - 9. Permit type: Water bureau review | Permit status: Not reqd | Completion date: April 6, 2016 | Permit id: 2015-234960-Rev | |||||
Need plans Permit type: Intake | Permit status: Approved | Completion date: September 24, 2015 | Permit id: 2015-241649-000 | |||||
Need plans Permit type: Life safety | Permit status: Not reqd | Completion date: September 24, 2015 | Permit id: 2015-241649-000 | |||||
Need plans Permit type: Fire bureau | Permit status: Not reqd | Completion date: September 24, 2015 | Permit id: 2015-241649-000 | |||||
Update interior and ready for ti Permit type: Intake | Permit status: Closed | Completion date: April 4, 2016 | Permit id: 2016-144660-000 | |||||
Ti interior only first tenant this space 4th floor Date: May 1, 2003Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: May 28, 2003 | Current use: Business | Permit id: 2003-118285-000 | |||||
Office tis for 72,7 sf of 7 story office bldg including basement. Date: May 28, 2004Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: September 23, 2004 | Current use: Business | Permit id: 2004-011596-000 | |||||
New walls to create one new office on seventh floor Date: March 6, 2006Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: July 17, 2006 | Current use: Business | Permit id: 2006-113324-000 | |||||
Ti for server room -- combine (e) server room with (e) storage room for enlarged server room. New ups system in server room with new cooling units on roof. Date: June 26, 2007Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: March 25, 2008 | Current use: Business | Permit id: 2007-141416-000 | |||||
Construction of two pier foundations for two joint-use overhead catenary system(ocs) light pole that will penetrate the building basement vault under the sidewalk along nw 5th ave and water meter vault relocation in basement Date: August 6, 2007Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: April 29, 2008 | Current use: Business | Permit id: 2007-141691-000 | |||||
Ti on 2nd floor. Add wall to separate work spaces, finish work Date: August 17, 2011Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Final | Completion date: October 12, 2011 | Current use: Business | Permit id: 2011-167346-000 | |||||
6th floor addition of new non-bearing partition to create two offices from existing conference room, addition of new door & relite Client: Neighbors West Northwest | Permit type: Alteration | Permit status: Under review | Current use: Business | Permit id: 2017-109246-000 |