ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 20, 2008Permit type: Delead | Permit id: E912397 | |||||
Apt 2 remove all the obstruction at bathroom tub. Clear entire building waste line up to house trap and section up to street sewer main. Note: fiel Date: January 21, 2011Permit type: Stopag | Permit id: Eb20409 | |||||
National grid provide gas to boiler / hot water heater. Date: July 30, 2008Permit type: Util | Permit id: E904612 | |||||
Perform total lead analysis of 08 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 21, 2008Permit type: Delead | Permit id: E912680 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: November 19, 2008Permit type: Delead | Permit id: E916019 | |||||
(bkwest) local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-20 Date: October 2, 2008Permit type: Delead | Permit id: E910890 | |||||
Apt 2 remove loose plaster approximately 25 sq ft at ceiling and walls of north 4 room. Provide and install approximately 64 sq ft of 5/8 thick gwb Date: January 10, 2011Permit type: Gc | Permit id: Eb18993 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: January 26, 2011Permit type: Delead | Permit id: Eb20776 | |||||
Register boiler and hot water heater. Make all corrections to bring to code. Pay any additional fees with dob. Inconjunction with e911552. Date: October 31, 2008Permit type: Plumb | Permit id: E913682 | |||||
Bleed all the radiators throughout all the apartments. Provide adequate heat to entire apartments in the building. Install new pressure relief valve Date: February 8, 2011Permit type: Plumb | Permit id: Eb20383 | |||||
Apt 2 remove loose plaster approximately 25 sq ft at ceiling and walls of north 4 room. Provide and install approximately 64 sq ft of 5 8 thick gwb Date: January 10, 2011Permit type: Gc | Permit id: Eb18993 | |||||
National grid provide gas to boiler hot water heater. Date: July 30, 2008Permit type: Util | Permit id: E904612 | |||||
As per mini rc # 2010000070202 (eas), perform polarized light microscopy (plm) gravimetric matrix reduction analysis as per hpd specification of 4 n Date: April 22, 2010Permit type: Asbest | Permit id: Ea33357 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: April 26, 2012Permit type: Util | Permit id: Ec28311 | |||||
Provide and install one missing wired glass pane at front door of building. Include stops and caulking. Note: field dimension and quantities are to Date: May 17, 2010Permit type: Gc | Permit id: Ea35607 | |||||
1. Provide and install one new electrical light fixture at ceiling of 2nd story public hall. Include necessary electrical wire, switch and cover plate Date: August 31, 2010Permit type: Elec | Permit id: Eb08259 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 23, 2010Permit type: Delead | Permit id: Eb18135 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 1, 2013Permit type: Util | Permit id: Ee02892 | |||||
Replace broken vinyl tile with new 12x12 composition tiles matching to existing in the vestibule floor of the building,appr. S. F. Contractor mu Date: November 20, 2008Permit type: Gc | Permit id: E915543 | |||||
Remove damaged and mold filled sheetrock, approximately 1 sq ft in cellar. 2) install approximately 1 sq. Ft. Of 5/8 thick fireproof gwb at wa Date: December 1, 2010Permit type: Gc | Permit id: Eb15148 | |||||
Omo roof removal 218 street brooklym air monitoring provide air monitoring during asbestos removal at roof in accordance with all city, state Date: June 30, 2010Permit type: Asbest | Permit id: Ea35537 | |||||
Abate water leak at basement ceiling defective hot water supply pipe. Remove all work related debris. Non s. W. P. Note: contractor must c Permit type: Plumb | Permit id: Eb28948 | |||||
Contact hpd for acp omo roof replacement 218 street brooklym building is occupied. Roof must not start on thursday, friday or before a holida Date: June 17, 2010Permit type: Gc | Permit id: Ea35544 | |||||
Provide and install new fire rated steel hydraulic hatch door. Reframe with 2x6 the scuttle hatch. Include all the necessary flashing around scuttl Date: January 11, 2010Permit type: Gc | Permit id: Ea20967 | |||||
Properly secure the loose electrical light fixture at ceiling at public hall, 1st story at the time of this invitation to bid, it is not anticipa Date: August 18, 2010Permit type: Elec | Permit id: Eb07124 | |||||
@ cellar: remove all the illegal electric wire tapping from the electric meter panel box at cellar. Note: field dimension and quantities ar Date: April 10, 2012Permit type: Elec | Permit id: Ec26503 | |||||
Upgrade electrical system/rewire. Work must be done with all the applicable city, state and federal regulations and with all applycable permits. Permi Date: November 22, 2010Permit type: Elec | Permit id: Eb15122 | |||||
Scrape approximately 12 sq. Ft. At walls and ceilings of three stories public halls including hatch scuttle. Provide and install approximately 32 sq. Date: May 17, 2010Permit type: Gc | Permit id: Ea35635 | |||||
As per rc # 2010140911102 (b&n&k), perform asbestos abatement pursuant to hpd rc specification and title 15, chapter 1, rules of the city of new york, Date: June 1, 2010Permit type: Asbest | Permit id: Ea35523 | |||||
Cellar remove wet carpet approximately cubic yards. Pump out accumulation of sewer and water, including boiler room. Clean and disinfect entire ce Date: December 2, 2010Permit type: Stopag | Permit id: Eb16166 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 10, 2010Permit type: Delead | Permit id: Ea38449 | |||||
Con ed provide electricity to building public areas and heating plant/hot water heater Date: July 1, 2014Permit type: Util | Permit id: Ef02965 | |||||
Apt 3 remove one window guard at fire escape window. Repair two window guards. Include all the necessary one way screws and stops. Note: field dime Date: January 21, 2011 Value: $163Permit type: Gc | Permit id: Eb20396 | |||||
Apt #2) at bedroom : install (1) window guard. Remove all work related debris. Date: January 14, 2009 Value: $76Permit type: Gc | Permit id: E922988 | |||||
Apt #3) at bedroom : install (2) window guards, and at kitchen install (1) window guard. Remove all work related debris. Date: August 12, 2008 Value: $115Permit type: Gc | Permit id: E905724 | |||||
Apt #2) at kitchen : install (1) window guard, and at bedroom#2 install (2) window guards. Remove all work related debris. Date: August 12, 2008 Value: $100Permit type: Gc | Permit id: E905723 | |||||
Local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and Date: October 14, 2008Permit type: Delead | Permit id: E912090 | |||||
Abate water leak at basement ceiling defective hot water supply pipe. Remove all work related debris. Non s. W. P. Note: contractor must c Permit type: Plumb | Permit id: Eb28948 | |||||
Abate water leak at basement ceiling defective hot water supply pipe. Remove all work related debris. Non s. W. P. Note: contractor must c Permit type: Plumb | Permit id: Eb28948 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2014Permit type: Util | Permit id: Ef02965 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2012Permit type: Util | Permit id: Ed01512 | |||||
Upgrade electrical system rewire. Work must be done with all the applicable city, state and federal regulations and with all applycable permits. Permi Date: November 22, 2010Permit type: Elec | Permit id: Eb15122 | |||||
Abate water leak at basement ceiling defective hot water supply pipe. Remove all work related debris. Non s. W. P. Note: contractor must c Permit type: Plumb | Permit id: Eb28948 | |||||
Remove damaged and mold filled sheetrock, approximately 1 sq ft in cellar. 2) install approximately 1 sq. Ft. Of 5 8 thick fireproof gwb at wa Date: December 1, 2010Permit type: Gc | Permit id: Eb15148 | |||||
Con ed provide electricity to building public areas and heating plant hot water heater Date: July 1, 2013Permit type: Util | Permit id: Ee02892 | |||||
Abate water leak at basement ceiling defective hot water supply pipe. Remove all work related debris. Non s. W. P. Note: contractor must c Permit type: Plumb | Permit id: Eb28948 | |||||
Remove existing heating plant and install new boiler. Install new cast iron/steel gas boiler to supply adequate heat and hot water to building. Sup Date: November 19, 2008Permit type: Heat | Permit id: E915596 | |||||
As per rc # 2009000670001(b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, on 24 ft. Of pipe ins Date: November 24, 2008Permit type: Asbest | Permit id: E916442 | |||||
Cellar 1. Make all the necessary repairs to the gas boiler hot water system to provide adequate heat to apartment 3 at 3rd story. Include necessary Date: January 4, 2011Permit type: Heat | Permit id: Eb17587 | |||||
Cellar: at the gas meter bank make the nessary repairs in the gas piping to provide independant gas meter for 1st story apt and for the boiler in orde Date: October 15, 2008Permit type: Plumb | Permit id: E911552 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: February 8, 2010Permit type: Delead | Permit id: Ea24731 | |||||
Bleed all the baseboard heaters throughout all the apartments. Provide adequate heat to entire apartments in the building. Note: field dimension and Date: January 13, 2010Permit type: Plumb | Permit id: Ea21770 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: March 30, 2010Permit type: Delead | Permit id: Ea30786 | |||||
(bkwest) local law #1 violation : as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-20 Date: October 2, 2008Permit type: Delead | Permit id: E910902 | |||||
Perform total lead analysis of 14 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: February 22, 2010Permit type: Delead | Permit id: Ea26795 | |||||
As per mini rc # 20090000405701 (ny enviornmentl inc,) perform air sampling and analysis in accordance with hpd mini requirement contract specificat Date: December 8, 2008Permit type: Asbest | Permit id: E916443 | |||||
As per mini rc # 2009000203301 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 01 samples for asbestos content uti Date: December 18, 2008Permit type: Asbest | Permit id: E916441 | |||||
Alternative enforcement program service the existing gas fired heating unit to supply heat to all dwelling units. Note: contractor must contact Permit type: Heat | Permit id: Eb18465 | |||||
Perform total lead analysis of 08 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 16, 2008Permit type: Delead | Permit id: E912073 | |||||
Apt3 provide and install antiscold shower body at bathroom. Make all the necessary repair to to the wall tiles affected by the installation of the ne Date: January 14, 2010Permit type: Gc | Permit id: Ea21743 | |||||
Alternative enforcement program service the existing gas fired heating unit to supply heat to all dwelling units. Note: contractor must contact Permit type: Heat | Permit id: Eb18465 | |||||
Alternative enforcement program service the existing gas fired heating unit to supply heat to all dwelling units. Note: contractor must contact Permit type: Heat | Permit id: Eb18465 | |||||
Alternative enforcement program service the existing gas fired heating unit to supply heat to all dwelling units. Note: contractor must contact Permit type: Heat | Permit id: Eb18465 | |||||
Remove existing heating plant and install new boiler. Install new cast iron steel gas boiler to supply adequate heat and hot water to building. Sup Date: November 19, 2008Permit type: Heat | Permit id: E915596 | |||||
Alternative enforcement program service the existing gas fired heating unit to supply heat to all dwelling units. Note: contractor must contact Permit type: Heat | Permit id: Eb18465 | |||||
Provide and install one new electrical outlet at east wall in the east 1 room at apt 1. Include necessary electrical wire and cover plate. Make all th Date: January 6, 2010Permit type: Elec | Permit id: Ea20952 | |||||
Apt 1 tenant lucille acedvo @ (347) 422-0103 vendor is to remove existing broken glass pane from front thermal pane sash window in the livingroom , Date: May 13, 2011Permit type: Gc | Permit id: Eb30334 | |||||
National grid provide gas to boiler / hot water heater. Date: November 30, 2009Permit type: Util | Permit id: Ea17764 | |||||
Cellar: (gas boiler) make all necessary repairs to gas boiler to restore to proper working condition. Boiler is currently down. Repairs and or ser Date: January 20, 2012Permit type: Heat | Permit id: Ec18472 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: June 10, 2010Permit type: Delead | Permit id: Ea38450 | |||||
National grid provide gas to boiler / hot water heater. Date: July 1, 2013Permit type: Util | Permit id: Ee00937 | |||||
Apt 1 trace locate and repair the consealed water leak at ceiling of bathroom. Provide and install approximately 32 sq ft of 5/8 thick gwb at ceilin Date: December 29, 2010Permit type: Gc | Permit id: Eb18398 | |||||
Apt 1 trace locate and repair concealed water leak at ceiling in the clocet in north west 3 room. Provide and install approximately 32 sq. Ft of 5/8 Date: May 17, 2010Permit type: Gc | Permit id: Ea35623 | |||||
Make neccessary repairs to gas fired boiler to restore heat to the entire building alternative enforcement program note: contractor must contact Date: January 21, 2015Permit type: Heat | Permit id: Ef13692 | |||||
National grid provide gas to boiler / hot water heater. Date: July 1, 2012Permit type: Util | Permit id: Ed01353 | |||||
National grid provide gas to boiler / hot water heater. Date: July 1, 2011Permit type: Util | Permit id: Ec00282 | |||||
Apt 1 provide and install one new outlet at south wall in the north west 3 room. Include necessary wiring and cover plate. Note: field dimension Date: September 1, 2010Permit type: Elec | Permit id: Eb08287 | |||||
Apt 1 1. Provide and install one new electrical outlet at north wall of room north 1. Include electrical wire and cover plate. 2. Provide and insta Date: June 24, 2010Permit type: Elec | Permit id: Ea38704 | |||||
National grid provide gas to boiler / hot water heater. Date: June 8, 2010Permit type: Util | Permit id: Eb03856 | |||||
National grid provide gas to boiler / hot water heater. Date: July 1, 2014Permit type: Util | Permit id: Ef02596 | |||||
National grid provide gas to boiler hot water heater. Date: July 1, 2014Permit type: Util | Permit id: Ef02596 | |||||
National grid provide gas to boiler hot water heater. Date: June 8, 2010Permit type: Util | Permit id: Eb03856 | |||||
National grid provide gas to boiler hot water heater. Date: July 1, 2011Permit type: Util | Permit id: Ec00282 | |||||
National grid provide gas to boiler hot water heater. Date: July 1, 2012Permit type: Util | Permit id: Ed01353 | |||||
Apt 1 trace locate and repair the consealed water leak at ceiling of bathroom. Provide and install approximately 32 sq ft of 5 8 thick gwb at ceilin Date: December 29, 2010Permit type: Gc | Permit id: Eb18398 | |||||
National grid provide gas to boiler hot water heater. Date: July 1, 2013Permit type: Util | Permit id: Ee00937 | |||||
Apt 1 trace locate and repair concealed water leak at ceiling in the clocet in north west 3 room. Provide and install approximately 32 sq. Ft of 5 8 Date: May 17, 2010Permit type: Gc | Permit id: Ea35623 | |||||
National grid provide gas to boiler hot water heater. Date: November 30, 2009Permit type: Util | Permit id: Ea17764 |