ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
As per the requirement contract with hpd apartment # 5-g supply and install the missing or repair/replace the defective window guards throughout Date: August 15, 2014Permit type: Gc | Permit id: Ef03951 | |||||
As per the requirement contract with hpd apartment # 5-g supply and install the missing or repair replace the defective window guards throughout Date: August 15, 2014Permit type: Gc | Permit id: Ef03951 | |||||
(apt.#3c) scrub down and remove all mold & mildew from bathroom walls and ceiling approx. (1 sq. Ft.) prime area with stainkiller and paint area. Date: September 13, 2004Permit type: Gc | Permit id: E507527 | |||||
Apt# 4c, bathroom: demolish and repair approx. Sq. Ft. Of ceiling and replace with water resistant sheetrock, plaster prime and paint (2) coats wi Date: October 8, 2009Permit type: Gc | Permit id: Ea11792 | |||||
As per requirement contract apt 6j repair or replace 1 window guard at entire apartment. Remove all work related debris contractor must Date: January 9, 2013Permit type: Gc | Permit id: Ed13400 | |||||
As per the requirement contract with hpd. Apartment # 6j: ==> supply and install total (2) new window guards complete as follows: bedroom # 2 (1 Date: August 27, 2014Permit type: Gc | Permit id: Ef04608 | |||||
As per requirement contract: apt 5c supply and install 1 window guard(s) and repair 2 window guard(s) at entire apartment. Remove all work relate Date: June 24, 2013Permit type: Gc | Permit id: Ed24351 | |||||
Apt. #5c) at bathroom: trace, locate, and repair concealed water leak. Demolish and repair 35 sq. Ft. Of ceiling with sheetrock. Tape, compound, p Date: August 1, 2007Permit type: Gc | Permit id: E802621 | |||||
As per rc #20000027582a (emsl), perform total lead analysis of dust wipe sample(s) via environmental protection agency (epa) sw845-3050-74 meth Date: March 16, 2001Permit type: Delead | Permit id: E117733 | |||||
As per mini rc (apt#3-h) repair the existing total (5) window guards as follows: at bedroom #1 (1), at bedroom #2 (1), kitchen (2), living room ( Date: March 5, 2012Permit type: Gc | Permit id: Ec21506 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: November 30, 2005Permit type: Delead | Permit id: E615790 | |||||
As per rc # 2006001274402 (enviro-probe inc), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: June 5, 2006Permit type: Delead | Permit id: E635651 | |||||
Erp doh lead abatement violation: as per attached scope of work thoroughly remove all lead violations as per new york city health order to abate nui Date: December 19, 2005Permit type: Delead | Permit id: E617766 | |||||
As per the requirement contract with h. P. D and h. P. D/doh guidelines, install/repair window guards: at apartment # 1j , repair w/g at: Date: February 13, 2016Permit type: Gc | Permit id: Eg11381 | |||||
As per rc # 2006001274402 (enviro-probe inc), perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: March 27, 2006Permit type: Delead | Permit id: E628699 | |||||
As per the requirement contract with h. P. D and h. P. D doh guidelines, install repair window guards: at apartment # 1j , repair w g at: Date: February 13, 2016Permit type: Gc | Permit id: Eg11381 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: March 7, 2012Permit type: Delead | Permit id: Ec24218 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: February 6, 2012Permit type: Delead | Permit id: Ec20058 | |||||
As per requirement contract apt 5j repair or replace 4 window guards at entire apartment. Remove all work related debris contractor must Date: January 9, 2013Permit type: Gc | Permit id: Ed13399 | |||||
Local law # 1 violation: as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 an Date: August 28, 2008Permit type: Delead | Permit id: E907170 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 23, 2008Permit type: Delead | Permit id: E909727 | |||||
Apt. 3j bathroom, repair concealed water leak from above. Scrape,plaster and paint the entire bathroom cieling to avert mold and mildew. Remove all wor Date: October 20, 2008Permit type: Gc | Permit id: E911692 | |||||
As per rc #2004000522201 (enviro-probe inc), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: April 30, 2004Permit type: Delead | Permit id: E422703 | |||||
As per rc #2004000522201 (enviro-probe inc), perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw845-305 Date: June 23, 2004Permit type: Delead | Permit id: E426439 | |||||
Local law #1 violation : proactive as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as pe Date: February 14, 2006Permit type: Delead | Permit id: E624399 | |||||
Erp doh lead abatement violation: as per attached scope of work thoroughly remove all lead violations as per new york city health order to abate nuis Date: December 19, 2005Permit type: Delead | Permit id: E617763 | |||||
As per rc # 2007003353401 (eastern anal. Svc.,inc), perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8 Date: May 22, 2007Permit type: Delead | Permit id: E730968 | |||||
As per rc #2007001218401 (enviro-probe, inc.), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: January 3, 2007Permit type: Delead | Permit id: E717428 | |||||
Apartment #2b: repair concealed water leak at kitchen ceiling from apt. Above; perform restoration of the ceiling in kitchen, approximately 6 squa Date: October 31, 2005Permit type: Gc | Permit id: E612461 | |||||
As per rc # 2006001274402 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: January 4, 2006Permit type: Delead | Permit id: E619605 | |||||
As per the requirement contract with hpd. Apartment #6b: supply and install total (4) new window guards complete as follows: bedroom#1 (1), be Date: July 22, 2013Permit type: Gc | Permit id: Ee00771 | |||||
Apartment #6b: abate approximately square feet of mold and mildew from bedroom #1 east and west walls from bedroom #2 east, south and west wa Date: March 4, 2005Permit type: Gc | Permit id: E523352 | |||||
As per rc # 2006001274402 (enviro-probe inc), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: January 18, 2006Permit type: Delead | Permit id: E620639 | |||||
As per rc # 2006001274402 (enviro-probe inc), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: March 2, 2006Permit type: Delead | Permit id: E626373 | |||||
As per rc # 2006001274402 (enviro-probe inc), perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: January 9, 2006Permit type: Delead | Permit id: E619871 | |||||
As per the requirement contract with hpd. Apartment #5b: ==> supply and install total (4) new window guards complete as follows: bedroom # 1 (1) Date: August 20, 2014Permit type: Gc | Permit id: Ef04291 | |||||
( apt # 5b ) at bathrm ==>properly restore the defective / broken ceiling approx 6 sq. Ft. And prime and paint with two coats of paint the entir Date: February 11, 2015Permit type: Gc | Permit id: Ef14786 | |||||
Perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: March 8, 2012Permit type: Delead | Permit id: Ec24346 | |||||
(apt. #5b) at bathroom: trace, locate and repair cascading water leak at the shower stall. Demolish and repair damaged ceiling, approx. 12 sq. Ft. W Date: January 22, 2007Permit type: Gc | Permit id: E717854 | |||||
As per the requirement contract with h. P. D and h. P. D/doh guidelines, install/repair window guards: at apartment # 5b , at (es2) , (es1) an Date: February 9, 2016Permit type: Gc | Permit id: Eg11382 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: April 2, 2012Permit type: Delead | Permit id: Ec26235 | |||||
As per the requirement contract with h. P. D and h. P. D doh guidelines, install repair window guards: at apartment # 5b , at (es2) , (es1) an Date: February 9, 2016Permit type: Gc | Permit id: Eg11382 | |||||
( apt # 5b ) at bathrm ==>properly restore the defective broken ceiling approx 6 sq. Ft. And prime and paint with two coats of paint the entir Date: February 11, 2015Permit type: Gc | Permit id: Ef14786 | |||||
As per rc # 2006001274402 (enviro-probe inc), perform total lead analysis of 06 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: December 6, 2005Permit type: Delead | Permit id: E616184 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: November 18, 2005Permit type: Delead | Permit id: E614500 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: July 24, 2013Permit type: Delead | Permit id: Ee02981 | |||||
As per the requirement contract with hpd. Apartment # 3g: supply and install total (2) new window guards complete as follows: bedroom#1 (2). Date: August 5, 2013Permit type: Gc | Permit id: Ee02600 | |||||
Apt. #4h ,demo and repair approx 32 sq. Ft. Of damaged and sagging bathroom cieling directly over wash basin and tub. Repair using water proof shtro Date: April 20, 2012Permit type: Gc | Permit id: Ec27549 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: November 16, 2012Permit type: Delead | Permit id: Ed10119 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: October 15, 2012Permit type: Delead | Permit id: Ed08016 | |||||
As per rc # 2006001274402 (enviro-probe inc), perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: November 21, 2005Permit type: Delead | Permit id: E614398 | |||||
(apt. #5f) trace, locate and repair leaks at kitchen ceiling. Restore ceiling and wall, approx 16 sq. Ft. To original condition, prime and paint. I Date: September 20, 2005Permit type: Gc | Permit id: E608006 | |||||
Apartment #5f, bathroom: plaster repair the defective plastered surfaces of the ceiling approx. Sq. Ft. And west wall 4 sq. Ft. Prime with stai Date: October 9, 2012Permit type: Gc | Permit id: Ed07631 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: November 19, 2012Permit type: Delead | Permit id: Ed10377 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: July 9, 2014Permit type: Delead | Permit id: Ef00643 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: June 23, 2014Permit type: Delead | Permit id: Ee26462 | |||||
As pr requirement contract apt 5f supply and install 1 window guard complete at entire apartment. Remove all work related debris contrac Date: January 9, 2013Permit type: Gc | Permit id: Ed13398 | |||||
As per the requirement contract with hpd. Apartment # 5f: ==> supply and install total (4) new window guards complete as follows: bedroom #1 (2) Date: August 26, 2014Permit type: Gc | Permit id: Ef04609 | |||||
Attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2056. 11 and as noted in the scope of work p Date: January 26, 2016Permit type: Delead | Permit id: Eg11172 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8463050b-7000b method utilizing flame atomic absorpt Date: January 29, 2016Permit type: Delead | Permit id: Eg11736 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: February 23, 2015Permit type: Delead | Permit id: Ef15867 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-7000b method utilizing flame atomic absorpti Date: January 21, 2016Permit type: Delead | Permit id: Eg11093 | |||||
At apartment # 5h , at kitchen :- trace and properly repair the source of concealed water leak from above apartment over the ceiling. Properly repa Date: December 11, 2015Permit type: Gc | Permit id: Eg08680 | |||||
As per the requirement contract with h. P. D and h. P. D/doh guidelines, install/repair window guards: at apartment # 5h , at (en1) and ( Date: February 9, 2016Permit type: Gc | Permit id: Eg11386 | |||||
As per the requirement contract with h. P. D and h. P. D doh guidelines, install repair window guards: at apartment # 5h , at (en1) and ( Date: February 9, 2016Permit type: Gc | Permit id: Eg11386 | |||||
As per requirement contract with hpd. (apt# 6c) supply and install total (3) window guards complete as follows: bedroom#1 (2), bedroom#2 ( Date: January 10, 2013Permit type: Gc | Permit id: Ed13167 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: November 19, 2012Permit type: Delead | Permit id: Ed10378 | |||||
Local law #1 violation : proactive as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as p Date: February 17, 2006Permit type: Delead | Permit id: E624821 | |||||
As per rc # 2006001274402 (enviro-probe inc), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: May 15, 2006Permit type: Delead | Permit id: E633636 | |||||
As per mini rc (apt#5d) supply and install missing window guards throughout the entire apartment. Estimated quantity = 1 remove all work Date: May 18, 2012Permit type: Gc | Permit id: Ec28643 | |||||
Flashing parapet walls with water proof cement, bulkhead area including elevator bulkhead approximately (1 sq. Ft.) provide and install new alumin Date: July 3, 2002Permit type: Gc | Permit id: E222747 | |||||
At apartment # 6h ( es1 ) livingroom :- trace and properly repair the source of active water leak from the roof over the ceiling , at the roof, provi Date: July 23, 2014Permit type: Gc | Permit id: Ef01329 | |||||
As per mini rc (apt #6h) supply and install (3) window guards complete at north (2) room. Remove all work related debris contractor must s Date: May 29, 2012Permit type: Gc | Permit id: Ec29235 | |||||
As per requirement contract apt. 6h supply and install total (4) new window guards complete as follows: bedroom#1 (2), bedroom#2 (1), living room Date: December 20, 2012Permit type: Gc | Permit id: Ed12182 | |||||
(apt.#6h) repair damaged wood floor in kitchen and supply and install new v. C. T tiles to match. (4 sq. Ft.) note: contractor must contact hpd @ Date: December 18, 2004Permit type: Gc | Permit id: E515473 | |||||
Locate and repair concealed water leak over private hallway and kitchen ceiling in apartment #6h. Restore private hall ceiling, finish with (1) coat Date: January 28, 2004Permit type: Gc | Permit id: E414309 | |||||
Perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: November 4, 2009Permit type: Delead | Permit id: Ea14935 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 29, 2009Permit type: Delead | Permit id: Ea20747 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: November 24, 2009Permit type: Delead | Permit id: Ea16896 | |||||
Apt#4a: provide restoration for cracked bathroom ceiling over the bathtub. Prime and paint to match existing colors. Approx. (10) Date: December 14, 2009Permit type: Gc | Permit id: Ea18849 | |||||
Local law #1 violation : pro-active as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as Date: November 30, 2005Permit type: Delead | Permit id: E615783 | |||||
As per rc # 2006001274404 (enviro-probe inc), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-30 Date: July 7, 2006Permit type: Delead | Permit id: E700108 | |||||
Properly repair with similar material. The loose bricks at front court, south east corner of parapet wall approx 5 sq ft. Remove all work related de Date: August 6, 2004Permit type: Gc | Permit id: E504414 | |||||
Perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: February 4, 2009Permit type: Delead | Permit id: E925684 | |||||
(at public area): at rear yard remove construction material (stored in black bags) and refrigerator (including doors) approx cubic yards. Remove Date: January 18, 2007Permit type: Gc | Permit id: E718303 | |||||
As per the requirement contract with h. P. D and h. P. D/doh guidelines, install/repair window guards: at public parts , at public hall stai Date: February 17, 2016Permit type: Gc | Permit id: Eg11384 | |||||
Punlic hall at public hall stairs between 5th and 6th story at south section , provide / install total of seven (7) wire mesh window glass pane Date: June 10, 2014Permit type: Gc | Permit id: Ee25159 | |||||
Supply and install new casement window at 2nd story public hall in south section of building at the east and west window guards. All rubbish to be rem Date: October 5, 2001Permit type: Gc | Permit id: E200694 | |||||
Public area: at north east corner front of building. Install new cement corner stone ( lin . Ft.) re-install railing strike and re-point (16 lin. Date: September 4, 2003Permit type: Gc | Permit id: E403227 | |||||
At public hall 4th story, make all necessary repairs to the exposed electrical wires and replace two defective florescent light fixtures similar to Date: June 5, 2014Permit type: Elec | Permit id: Ee25160 | |||||
Public area: supply and install new marble treads to match. 1st. And 10th treads up from lobby floor. Date: May 25, 2004Permit type: Gc | Permit id: E424111 | |||||
(public area) replace marble tread, approx. X 60, 1st step up and the riser, approx. 6 x 56 , 2nd step up from the 1st floor public hallway. Date: November 14, 2005Permit type: Gc | Permit id: E601116 | |||||
Public hallway: replace broken wire glass @ 1st floor lower sash under the stairwell. All debris must be removed and disposed appropriately. Date: February 2, 2010Permit type: Gc | Permit id: Ea22087 | |||||
Remove, replace and reset, two (2) broken and defective marble treads at lobby stairs, entrance of building, 1st down from bottom and 2nd tread up fr Date: September 1, 2000Permit type: Gc | Permit id: E103571 | |||||
Apt. 2d: replace defective valves at bathrm. Hot water at tub and baisn sink, with new valve, (2) Date: May 21, 2014 Value: $36Permit type: Gc | Permit id: Ee24289 | |||||
Apt. 4j: bathrm: install window guards Date: January 17, 2014 Value: $88Permit type: Gc | Permit id: Ee14232 | |||||
Apt: 4a- bed # 2 reinstall existing window guard with wrong screw. Date: January 17, 2013 Value: $55Permit type: Gc | Permit id: Ed14401 | |||||
Apt 2j; living room: reinstall 1 w/g; bedroom: install 3 w/gs; kitchen: reinstall 1 w/g. Date: June 4, 2012 Value: $177Permit type: Gc | Permit id: Ec30812 | |||||
(local law# 1 - clean only). Thoroughly re-clean the following areas as per new york city administrative code 27-2506. 11 and as noted in the scope of Date: March 23, 2012 Value: $104Permit type: Delead | Permit id: Ec25732 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: October 30, 2009Permit type: Delead | Permit id: Ea14983 | |||||
(apt. #4a) install 1 stops at livingroom (1), kitchen (1) and bedroom #2 (5). Install 1 window guard complete at bedroom #1. Repair 1 window gurad Date: December 22, 2009 Value: $176Permit type: Gc | Permit id: Ea20232 | |||||
Apt #5a) at bedroom door : remove (1) the illegal tower bolt installed. Remove all work related debris. Date: April 28, 2009Permit type: Gc | Permit id: E937085 | |||||
Apt 5d) at bathroom, kitchen, bedroom#3, and living room : re-install (1 each rooms) window guard correctly. Remove all work related debris. Date: September 12, 2007 Value: $155Permit type: Gc | Permit id: E806315 | |||||
Clean & dust wipe only: adjacent sample only for - right bedroom from apt foyer. (see e717209 for 1st omo created). Date: May 15, 2007 Value: $160Permit type: Delead | Permit id: E730553 | |||||
Doh clean & dust wipe only: rm # 11 right bedroom from apartment foyer. Date: December 27, 2006 Value: $155Permit type: Delead | Permit id: E717209 | |||||
(local law# 1 violation - clean only). Thoroughly re-clean the following areas as per new york city administrative code 27-2506. 11 and as noted in th Date: January 24, 2006 Value: $144Permit type: Delead | Permit id: E622279 | |||||
Doh clean dws only: room #1, apartment entrance foyer from public hallway room #6, front room (bedroom) from bathroom foyer Date: February 15, 2006 Value: $129Permit type: Delead | Permit id: E624924 | |||||
Apartment #5b: bedroom: repair 2 window guards and stops. Bedroom #2: repair 2 window guards and stops. Kitchen: repair 1 window guard and stops Date: March 2, 2005 Value: $41Permit type: Gc | Permit id: E523355 | |||||
Public hallway: 1st. Floor: install 1 window guard and stop. Date: March 16, 2004 Value: $56Permit type: Gc | Permit id: E418931 | |||||
Doh clean and dust wipe only in the following area: 1) room #1 room : entrance foyer from entrance Date: April 8, 2004 Value: $398Permit type: Delead | Permit id: E421062 | |||||
(apt #. 2d) at bthrm, trace, locate and repair concealed water leak at ceiling from above. Date: October 17, 2000Permit type: Plumb | Permit id: E107397 | |||||
L/l 38 abate: abate as per rc #0040077 . Thoroughly remove all lead violations as per new york city health code section 173. 14 and as noted in the sco Date: September 29, 2000 Value: $330Permit type: Delead | Permit id: E106169 | |||||
(apt #. 4f) at lvngrm, air conditioned window, install window stops. Date: August 23, 2000Permit type: Gc | Permit id: E103442 | |||||
(apt #. 4f) reinstall window guards and stops at kitchen and bthrm. Date: August 23, 2000 Value: $90Permit type: Gc | Permit id: E103439 | |||||
(apt #. 4f) at bdrm re-install (2) window guards and stops. Date: August 23, 2000Permit type: Gc | Permit id: E103434 | |||||
L l 38 abate: abate as per rc #0040077 . Thoroughly remove all lead violations as per new york city health code section 173. 14 and as noted in the sco Date: September 29, 2000 Value: $330Permit type: Delead | Permit id: E106169 | |||||
Apt 2j; living room: reinstall 1 w g; bedroom: install 3 w gs; kitchen: reinstall 1 w g. Date: June 4, 2012 Value: $177Permit type: Gc | Permit id: Ec30812 | |||||
Punlic hall at public hall stairs between 5th and 6th story at south section , provide install total of seven (7) wire mesh window glass pane Date: June 10, 2014Permit type: Gc | Permit id: Ee25159 | |||||
As per the requirement contract with h. P. D and h. P. D doh guidelines, install repair window guards: at public parts , at public hall stai Date: February 17, 2016Permit type: Gc | Permit id: Eg11384 |