ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 67 28 sqft re-roof if a re-roof project is proposed, the following specifications apply. Existing roofing material conc. Tile proposed roofing material conc. Tile manufacturer underlayment replacement using same tile brand and model color (if cool roof required) built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: December 14, 2017 | Permit id: Pds2017-Resalt- | |||||
Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrades of the existing main service panel, relocation of the existing loads, new sub-panels to accomodate solar loads, and relocation of existing panels in compliance with all zoning ordinances only, does not include additional new main service panels. This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 15, 2017Permit type: Addn | Permit status: Completed | Completion date: December 28, 2017 | Permit id: Pds2017-Resalt- | |||||
Final Date: March 10, 2005Permit status: Pass | Permit id: Pds2002-1005-20 |