Contractor to replace existing line from property to face of curb per city std p-262; pbot note location, excavation. Date: March 12, 2015Permit type: Intake | Permit status: Closed | Completion date: March 12, 2015 | Permit id: 2015-132790-000 | |||||
Alarm-fire alarm sprinkler monitoring Date: March 27, 2015Permit type: Intake | Permit status: Approved | Completion date: March 20, 2015 | Permit id: 2015-137037-000 | |||||
Convert existing r-2 building to r-1 hotel, remodel 4 stories mezzanine and roof deck, 39 rooms including bunk room, full seismic upgrade; ground floor includes laundry area, storage, restroom, reception area, lounge and coffee bar; mezzanine level includes storage/housekeeping and restrooms; floors 2-4 sleeping rooms, communal restrooms; new roof deck with stairs; new exterior lighting Date: September 2, 2014Permit type: Application | Permit status: Approved | Completion date: May 15, 2014 | Permit id: 2014-157327-000 | |||||
Dfs for fire escape addition Date: January 5, 2015Permit type: Application | Permit status: Approved | Completion date: December 15, 2014 | Permit id: 2014-157327-Dfs | |||||
Dfs for roof top terrace railing barriers, planter boxes and benches, roof connections Date: May 13, 2015Permit type: Application | Permit status: Approved | Completion date: April 23, 2015 | Permit id: 2014-157327-Dfs | |||||
Revision-value added revision infill cavity in wall between 2nd floor and the 4th floor Date: October 22, 2014Permit type: Application | Permit status: Approved | Completion date: October 22, 2014 | Permit id: 2014-157327-Rev | |||||
Revision- eliminate fire/smoke guard at ground floor elevator shaft opening, change from roll down fire/smoke guards to hinged fire/smoke doors at 3rd and 4th floor. Minor floor plan changes at stair elevator area for floors 2-4. No exterior changes. Date: December 31, 2014Permit type: Application | Permit status: Approved | Completion date: December 31, 2014 | Permit id: 2014-157327-Rev | |||||
Value added revision to add 3 partition walls at bunk room, increases occupancy by 3 people, revision to unit 6 on floors 3 and 4 to make these units accessible Date: May 13, 2015Permit type: Application | Permit status: Approved | Completion date: April 23, 2015 | Permit id: 2014-157327-Rev | |||||
Two 10-ton, 5-zone vrf splits. 12 cfm hru for venitlation air to each fan coil, fire dampers in ventilation air at each unit rated wall penetration, fsds at shaft wall penetrations. One commercial dryer vent and combustion air, elevator vent w/mod interlocked w/fa Date: November 14, 2014Permit type: Intake | Permit status: Closed | Completion date: August 7, 2014 | Permit id: 2014-190408-000 | |||||
Revisions on plans, ducts below rated fl/clgs, each fl efs independant to roof , transfer and mua for dryers, notes on plans Date: April 7, 2015Permit type: Intake | Permit status: Closed | Completion date: April 7, 2015 | Permit id: 2014-190408-Rev | |||||
Plumbing fixtures for renovation of historical building./ add 1 sanitary sewer 5/1/15 Date: September 15, 2014Permit type: Intake | Permit status: Closed | Completion date: September 15, 2014 | Permit id: 2014-212866-000 | |||||
Complete remodel of bldg into hotel/cafe/ add (3) 200amp service per checksheet 11/14/14 Date: November 20, 2014Permit type: Intake | Permit status: Closed | Completion date: October 16, 2014 | Permit id: 2014-226402-000 | |||||
Revision to review changes needed to review split of panel Date: March 24, 2015Permit type: Intake | Permit status: Closed | Completion date: March 10, 2015 | Permit id: 2014-226402-Rev | |||||
Add low voltage permitting. 3 x data locations, 2 x hvac systems, 1 x security camera system Date: September 29, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: October 14, 2015 | Permit id: 2015-243743-000 | |||||
Fire escape testing for certification Date: December 16, 2015Permit type: Application | Permit status: Approved | Completion date: November 23, 2015 | Permit id: 2015-268246-000 | |||||
Convert existing r-2 building to r-1 hotel, remodel 4 stories + mezzanine and roof deck, 39 rooms including bunk room, full seismic upgrade; ground floor includes laundry area, storage, restroom, reception area, lounge and coffee bar; mezzanine level includes storage/housekeeping and restrooms; floors 2-4 sleeping rooms, communal restrooms; new roof deck with stairs; new exterior lighting Date: September 2, 2014Permit type: Application | Permit status: Approved | Completion date: May 15, 2014 | Permit id: 2014-157327-000 | |||||
Two 10-ton, 5-zone vrf splits. 12 cfm hru for venitlation air to each fan coil, fire dampers in ventilation air at each unit rated wall penetration, fsds at shaft wall penetrations. One commercial dryer vent and combustion air, elevator vent w/mod interlocked w/fabds rhunterj- 07/07/15-added reinspection fee Date: November 14, 2014Permit type: Intake | Permit status: Closed | Completion date: August 7, 2014 | Permit id: 2014-190408-000 | |||||
Convert existing r-2 building to r-1 hotel, remodel 4 stories + mezzanine and roof deck, 39 rooms including bunk room, full seismic upgrade; ground floor includes laundry area, storage, restroom, reception area, lounge and coffee bar; mezzanine level includes storage housekeeping and restrooms; floors 2-4 sleeping rooms, communal restrooms; new roof deck with stairs; new exterior lighting Date: September 2, 2014Permit type: Application | Permit status: Approved | Completion date: May 15, 2014 | Permit id: 2014-157327-000 | |||||
Revision- eliminate fire smoke guard at ground floor elevator shaft opening, change from roll down fire smoke guards to hinged fire smoke doors at 3rd and 4th floor. Minor floor plan changes at stair elevator area for floors 2-4. No exterior changes. Date: December 31, 2014Permit type: Application | Permit status: Approved | Completion date: December 31, 2014 | Permit id: 2014-157327-Rev | |||||
Two 10-ton, 5-zone vrf splits. 12 cfm hru for venitlation air to each fan coil, fire dampers in ventilation air at each unit rated wall penetration, fsds at shaft wall penetrations. One commercial dryer vent and combustion air, elevator vent w mod interlocked w fabds rhunterj- 07 07 15-added reinspection fee Date: November 14, 2014Permit type: Intake | Permit status: Closed | Completion date: August 7, 2014 | Permit id: 2014-190408-000 | |||||
Plumbing fixtures for renovation of historical building. Add 1 sanitary sewer 5 1 15 Date: September 15, 2014Permit type: Intake | Permit status: Closed | Completion date: September 15, 2014 | Permit id: 2014-212866-000 | |||||
Complete remodel of bldg into hotel cafe add (3) 200amp service per checksheet 11 14 14 Date: November 20, 2014Permit type: Intake | Permit status: Closed | Completion date: October 16, 2014 | Permit id: 2014-226402-000 |