ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
1800sf reroof for existing sfd (for sunrise powerlink grant program) if a re-roof project is proposed, the following specifications apply. Existing roofing material comp proposed roofing material comp shingles & build up roof manufacturer owens corning built up johns manville brand and model tru def aged copper /appex 4. 5 mfr color (if cool roof required) not cool roof---- built up off white 0662-0042a built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) 2/8/2016 plan change see cofa... T. T. Note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: January 25, 2016 Value: $10,674Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 22, 2016 | Permit id: Pds2016-Resalt- | |||||
1800sf reroof for existing sfd (for sunrise powerlink grant program) if a re-roof project is proposed, the following specifications apply. Existing roofing material comp proposed roofing material comp shingles & build up roof manufacturer owens corning built up johns manville brand and model tru def aged copper appex 4. 5 mfr color (if cool roof required) not cool roof---- built up off white 0662-0042a built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) 2 8 2016 plan change see cofa... T. T. Note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: January 25, 2016 Value: $10,674Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 22, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: April 22, 2016Permit status: Pass | Permit id: Pds2016-Resalt- |