Building Permits at 2015 Fulton Street Brooklyn NY 11233


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 2015 Fulton Street Brooklyn NY 11233 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Trace and repair source of water leak at 3rd floor apt and 3rd story public hall. Supply and install 90lb cap sheet to entire roof approx. 6 sq ft.
Date:  April 28, 2010

Permit type: Gc | Permit id: Ea33741
2010/04/280952015 Fulton Street Brooklyn Ny 11233
Provide automatic fuel drop to the above building until futher notice #2ulsh fuel . No prime and start necessary (212) 863-8781
Date:  March 5, 2014

Permit type: Util | Permit id: Ee18826
2014/03/050952015 Fulton Street Brooklyn Ny 11233
Replace the defective vent alarm on the fill line.
Date:  March 7, 2014

Permit type: Heat | Permit id: Ee18996
2014/03/070952015 Fulton Street Brooklyn Ny 11233
At basement: remove existing heating plant and provide and install new #2 oil fired boiler complete with coil to supply adequate heat to building. Su
Date:  January 10, 2014

Permit type: Heat | Permit id: Ee13484
2014/01/100952015 Fulton Street Brooklyn Ny 11233
As per rc # 2012143636409 (newyork environmental systems), perform asbestos abatement pursuant to hpd rc specification and title 15, chapter 1, rules
Date:  January 8, 2014

Permit type: Asbest | Permit id: Ee13433
2014/01/080952015 Fulton Street Brooklyn Ny 11233
At apt 3, at basement - demo and remove existing heating plant and oil tanks. Provide and install properly sized gas fired boiler complete with al

Permit type: Heat | Permit id: Ee13324
0952015 Fulton Street Brooklyn Ny 11233
At apt 3, at basement - demo and remove broken defective steps from public hall to basement and replace them with new wooden stairs to boiler room

Permit type: Gc | Permit id: Ee13487
0952015 Fulton Street Brooklyn Ny 11233
Roof: - trace, locate and repair the source of water leaks coming from roof to apt#3 room-n3. Supply and properly install modified bitumine type roofi
Date:  April 11, 2012

Permit type: Gc | Permit id: Ec26762
2012/04/110952015 Fulton Street Brooklyn Ny 11233
No electric to boiler ,trouble shoot and make repairs to restore electric to the boiler.
Date:  February 13, 2014

Permit type: Elec | Permit id: Ee17096
2014/02/130952015 Fulton Street Brooklyn Ny 11233
@ apt#3:: at private hall and kitchen repair floor with new underlayment and vct tiles. Approx. 1 sq. Ft. Remove all work related debris. Con
Date:  April 27, 2012

Permit type: Gc | Permit id: Ec27995
2012/04/270952015 Fulton Street Brooklyn Ny 11233
Supply and install new gas meter bar and new gas line to existing 75 gal gas hot water heater approx: lf. Existing gas hot water heater was install
Date:  May 23, 2012

Permit type: Plumb | Permit id: Ec28939
2012/05/230952015 Fulton Street Brooklyn Ny 11233
Provide single fuel drop with prime and start #2ulsh fuel fill tank. Please report any problems immediately to esb fuel unit (212) 863-8781
Date:  February 12, 2014

Permit type: Util | Permit id: Ee17128
2014/02/120952015 Fulton Street Brooklyn Ny 11233
Perform asbestos project monitoring, air sampling and analysis in accordance with hpd mini requirement contract specification for the above address in
Date:  January 16, 2014

Permit type: Asbest | Permit id: Ee13445
2014/01/160952015 Fulton Street Brooklyn Ny 11233
At apt 3, at basement - demo and remove existing heating plant and oil tanks. Provide and install properly sized gas fired boiler complete with al

Permit type: Heat | Permit id: Ee13324
0952015 Fulton Street Brooklyn Ny 11233
At apt 3, at basement - demo and remove broken defective steps from public hall to basement and replace them with new wooden stairs to boiler room

Permit type: Gc | Permit id: Ee13487
0952015 Fulton Street Brooklyn Ny 11233
At apt 3, at basement - demo and remove broken defective steps from public hall to basement and replace them with new wooden stairs to boiler room

Permit type: Gc | Permit id: Ee13487
0952015 Fulton Street Brooklyn Ny 11233
At apt 3, at basement - demo and remove existing heating plant and oil tanks. Provide and install properly sized gas fired boiler complete with al

Permit type: Heat | Permit id: Ee13324
0952015 Fulton Street Brooklyn Ny 11233
At apt 3, at basement - demo and remove broken defective steps from public hall to basement and replace them with new wooden stairs to boiler room

Permit type: Gc | Permit id: Ee13487
0952015 Fulton Street Brooklyn Ny 11233
At apt 3, at basement - demo and remove existing heating plant and oil tanks. Provide and install properly sized gas fired boiler complete with al

Permit type: Heat | Permit id: Ee13324
0952015 Fulton Street Brooklyn Ny 11233
At apt 3, at basement - demo and remove broken defective steps from public hall to basement and replace them with new wooden stairs to boiler room

Permit type: Gc | Permit id: Ee13487
0952015 Fulton Street Brooklyn Ny 11233
At apt 3, at basement - demo and remove existing heating plant and oil tanks. Provide and install properly sized gas fired boiler complete with al

Permit type: Heat | Permit id: Ee13324
0952015 Fulton Street Brooklyn Ny 11233
Trace and repair water leak at cellar . Replace the defective water heater with new 75 gals. Gas water heater including new copper pipe and shut off
Date:  March 31, 2010

Permit type: Heat | Permit id: Ea30597
2010/03/310952015 Fulton Street Brooklyn Ny 11233
Basement: clear main sewer stoppage. Pump/drain all standing water from basement. Leave basement free of all standing. If sewage, spread lime/s
Date:  March 31, 2010

Permit type: Stopag | Permit id: Ea30993
2010/03/310952015 Fulton Street Brooklyn Ny 11233
As per rc # 2010000115001 (b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, on ft. Of pipe in

Permit type: Asbest | Permit id: Ea31677
0952015 Fulton Street Brooklyn Ny 11233
As per mini rc # 2010000181801 (cuno enviornmental corp,) perform air sampling and analysis in accordance with hpd mini requirement contract specifica

Permit type: Asbest | Permit id: Ea31678
0952015 Fulton Street Brooklyn Ny 11233
As per mini rc # 2010000070201 (eas) and hpd specification, perform polarized light microscopy (plm) analysis of 2 samples for asbestos content util
Date:  April 12, 2010

Permit type: Asbest | Permit id: Ea31672
2010/04/120952015 Fulton Street Brooklyn Ny 11233
As per rc # 2010000115001 (b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, on ft. Of pipe in

Permit type: Asbest | Permit id: Ea31677
0952015 Fulton Street Brooklyn Ny 11233
As per mini rc # 2010000181801 (cuno enviornmental corp,) perform air sampling and analysis in accordance with hpd mini requirement contract specifica

Permit type: Asbest | Permit id: Ea31678
0952015 Fulton Street Brooklyn Ny 11233
As per mini rc # 2010000181801 (cuno enviornmental corp,) perform air sampling and analysis in accordance with hpd mini requirement contract specifica

Permit type: Asbest | Permit id: Ea31678
0952015 Fulton Street Brooklyn Ny 11233
As per rc # 2010000115001 (b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, on ft. Of pipe in

Permit type: Asbest | Permit id: Ea31677
0952015 Fulton Street Brooklyn Ny 11233
As per mini rc # 2010000181801 (cuno enviornmental corp,) perform air sampling and analysis in accordance with hpd mini requirement contract specifica

Permit type: Asbest | Permit id: Ea31678
0952015 Fulton Street Brooklyn Ny 11233
As per rc # 2010000115001 (b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, on ft. Of pipe in

Permit type: Asbest | Permit id: Ea31677
0952015 Fulton Street Brooklyn Ny 11233
Basement: clear main sewer stoppage. Pump drain all standing water from basement. Leave basement free of all standing. If sewage, spread lime ;s
Date:  March 31, 2010

Permit type: Stopag | Permit id: Ea30993
2010/03/310952015 Fulton Street Brooklyn Ny 11233
As per mini rc # 2010000181801 (cuno enviornmental corp,) perform air sampling and analysis in accordance with hpd mini requirement contract specifica

Permit type: Asbest | Permit id: Ea31678
0952015 Fulton Street Brooklyn Ny 11233
As per rc # 2010000115001 (b&n&k), perform asbestos abatement work as per hpd specification throughout basement and boiler room, on ft. Of pipe in

Permit type: Asbest | Permit id: Ea31677
0952015 Fulton Street Brooklyn Ny 11233
1)2nd story public hallway: - demolish the remaining partially broken and cracked ceiling plaster from 2nd story public hallway ceiling and restore wi
Date:  April 10, 2012

Permit type: Gc | Permit id: Ec26780
2012/04/100952015 Fulton Street Brooklyn Ny 11233
Rear of building and rear yard :- cut-out and remove completely the branches, vines and bushes from over rear of building fire escape balconies [3 sto
Date:  April 9, 2012

Permit type: Gc | Permit id: Ec26656
2012/04/090952015 Fulton Street Brooklyn Ny 11233
At apt 3, at basement - demo and remove broken defective steps from public hall to basement and replace them with new wooden stairs to boiler room
Date:  January 30, 2014

Permit type: Gc | Permit id: Ee13962
2014/01/300952015 Fulton Street Brooklyn Ny 11233
Vendor must coordinate the seal up same day of vacate order to the entire building; start date on 4/10/2012 thursday at 11:00pm [1] seal up a
Date:  April 11, 2014

Permit type: Gc | Permit id: Ee21447
2014/04/110952015 Fulton Street Brooklyn Ny 11233
At bsmt; locate leak appears coming from pipe leading to to first floor but not to be exclusive or main reason for flood. Make all necessary repai
Date:  January 21, 2014

Permit type: Plumb | Permit id: Ee14040
2014/01/210952015 Fulton Street Brooklyn Ny 11233
>>>>>>>>>>>>>heat related<<<<<<<<<<<<< at cellar: remove approx. Yards of rubbish and old con
Date:  February 28, 2014

Permit type: Gc | Permit id: Ee18408
2014/02/280952015 Fulton Street Brooklyn Ny 11233
Wood stringer between 2nd and 3rd story stair: - properly repair and secure the broken wood stringer at between 2nd and 3rd story. Note: - for acce
Date:  April 16, 2012

Permit type: Gc | Permit id: Ec26666
2012/04/160952015 Fulton Street Brooklyn Ny 11233
At cellar removed all rubbish approx: cubic yards and all construction materials storage to one side of the cellar remove all work related debr

Permit type: Gc | Permit id: Ee17910
0952015 Fulton Street Brooklyn Ny 11233
Temporary seal for vacant apartment 2.
Date:  December 31, 2013

Permit type: Gc | Permit id: Ee12934
2013/12/310952015 Fulton Street Brooklyn Ny 11233
Trace and repair leak effecting boiler operation at cellar ceiling at the time of this invitation to bid, it is not anticipated that this work wi
Date:  February 14, 2014
Value:   $102

Permit type: Plumb | Permit id: Ee17305
2014/02/14102952015 Fulton Street Brooklyn Ny 11233
Repair unopenable scuttle cover at roof. Scuttle cover to open and close properly.
Date:  October 6, 1999
Value:   $581

Permit type: Gc | Permit id: E012180
1999/10/06581952015 Fulton Street Brooklyn Ny 11233
At cellar removed all rubbish approx: cubic yards and all construction materials storage to one side of the cellar remove all work related debr

Permit type: Gc | Permit id: Ee17910
0952015 Fulton Street Brooklyn Ny 11233
At cellar removed all rubbish approx: cubic yards and all construction materials storage to one side of the cellar remove all work related debr

Permit type: Gc | Permit id: Ee17910
0952015 Fulton Street Brooklyn Ny 11233
At cellar removed all rubbish approx: cubic yards and all construction materials storage to one side of the cellar remove all work related debr

Permit type: Gc | Permit id: Ee17910
0952015 Fulton Street Brooklyn Ny 11233
Vendor must coordinate the seal up same day of vacate order to the entire building; start date on 4 10 2012 thursday at 11:00pm [1] seal up a
Date:  April 11, 2014

Permit type: Gc | Permit id: Ee21447
2014/04/110952015 Fulton Street Brooklyn Ny 11233
At cellar removed all rubbish approx: cubic yards and all construction materials storage to one side of the cellar remove all work related debr

Permit type: Gc | Permit id: Ee17910
0952015 Fulton Street Brooklyn Ny 11233
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.