ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
(apt. #6a) at entire apartment install (1) window guard. Remove all work related debris. Mini rc omo #k903913 contractor must sign and return Date: April 6, 2009Permit type: Gc | Permit id: E933808 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: April 19, 2006Permit type: Delead | Permit id: E630678 | |||||
Perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: November 23, 2010Permit type: Delead | Permit id: Eb15160 | |||||
Perform total lead analysis of 16 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: August 9, 2010Permit type: Delead | Permit id: Eb05987 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: December 23, 2010Permit type: Delead | Permit id: Eb18120 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: November 24, 2010Permit type: Delead | Permit id: Eb15573 | |||||
Perform total lead analysis of 11 dust wipe sample(s) via environmental protection agency (epa) sw8463050b-7000b method utilizing flame atomic absorpt Date: March 17, 2015Permit type: Delead | Permit id: Ef17389 | |||||
Address aka: 625 ocean ave, apt # d4. Tenant tel: 917-966-1389; 917-818-8147. As per hpds lead abatement requirement contracts and attached scope of Date: February 2, 2015Permit type: Delead | Permit id: Ef14319 | |||||
Public area: first (1st) story public hall ceiling near west side entrance; trace locate and repair water leak above. Repair, prime, and paint cei Date: September 28, 2005Permit type: Gc | Permit id: E609297 | |||||
As per rc #2006001254204 (enviro-probe, inc.), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: October 2, 2006Permit type: Delead | Permit id: E709629 | |||||
At 1st floor: repair the leaks above the ceiling restore the ceiling to its original condition. Child under 7yrs note: contractor must sign and r Date: September 5, 2006Permit type: Gc | Permit id: E706526 | |||||
Public area: abate leak at lobby ceiling and repair ceiling. Paint to cover s. W. P. Remove all work related debris. Note: contractor must contact h Date: July 26, 2006Permit type: Gc | Permit id: E701898 | |||||
Install 2 window guards in public hall at 1st and 5th floors approx. 58 wide. Note: vendor must sign and return with your bid. Date: June 15, 1999Permit type: Gc | Permit id: E008260 | |||||
Hpd removed chain and padlock from iron gate at right and left yards. Preventing 2nd means of egress. Date: December 21, 2015 Value: $57Permit type: Gc | Permit id: Eg09372 | |||||
Public parts............. Remove double cyclinder key operated lock at iron gate at west at north yard obstucting 2nd means of egress. At the time of Date: December 16, 2015 Value: $44Permit type: Gc | Permit id: Eg09169 | |||||
L/l-1 (clean only) thoroughly re-clean the following areas as per new york city health code section 173. 14 and as noted in the scope of work p Date: December 1, 2010 Value: $145Permit type: Delead | Permit id: Eb16264 | |||||
L/l-1 (clean only) thoroughly re-clean the following areas as per new york city health code section 173. 14 and as noted in the scope of work p Date: November 1, 2010 Value: $179Permit type: Delead | Permit id: Eb13998 | |||||
L/l-1 (clean only) thoroughly re-clean the following areas as per new york city health code section 173. 14 and as noted in the scope of work pursu Date: May 6, 2010 Value: $179Permit type: Delead | Permit id: Ea34869 | |||||
Apt 6a: bedroom 1 and 2, kitchen and bathroom reinstall existing window guard and install window stops, 1 each @ bedroom 1 and bathroom or a total of Date: June 13, 2009 Value: $213Permit type: Gc | Permit id: E941904 | |||||
Local law #1 violation : as per hpds abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new yor Date: December 6, 2006Permit type: Delead | Permit id: E715545 | |||||
Apt. #4g) install stops at livingroom window,install window guard complete at bathroom. Date: September 19, 2006 Value: $112Permit type: Gc | Permit id: E708545 | |||||
Apt 6e) at master bedroom, re-install w/g and stops. Remove all work related debris. Date: September 14, 2006 Value: $182Permit type: Gc | Permit id: E707989 | |||||
At apt.#4i) repair leaks under the sink restore to proper working order. Date: August 30, 2006 Value: $50Permit type: Plumb | Permit id: E706641 | |||||
Apartment #4h: install (2) one way screws and stops at livingroom. Install window guard complete at kitchen. Install one way screws and stops at ba Date: March 10, 2006 Value: $41Permit type: Gc | Permit id: E627388 | |||||
Apt # 6h kitchen: supply and install 1 new window guard. Master bedroom:reinstall 1 window guard. Living room: supply and install 1 new window guard Date: May 17, 2006 Value: $212Permit type: Gc | Permit id: E634133 | |||||
Apt. 2e: install window guard and stops in bedroom Date: March 7, 2005Permit type: Gc | Permit id: E523905 | |||||
Public hall 5th sty. Install 1 w/g & stops. 4th sty. 1 w/g install screws. 3rd sty. Reinstall 2 w/gs. 2nd sty. Reinstall 2 w/gs. 1st sty reinst Date: June 4, 1999 Value: $256Permit type: Gc | Permit id: E008139 | |||||
Public hall 5th sty. Install 1 w g & stops. 4th sty. 1 w g install screws. 3rd sty. Reinstall 2 w gs. 2nd sty. Reinstall 2 w gs. 1st sty reinst Date: June 4, 1999 Value: $256Permit type: Gc | Permit id: E008139 | |||||
Apt 6e) at master bedroom, re-install w g and stops. Remove all work related debris. Date: September 14, 2006 Value: $182Permit type: Gc | Permit id: E707989 | |||||
L l-1 (clean only) thoroughly re-clean the following areas as per new york city health code section 173. 14 and as noted in the scope of work pursu Date: May 6, 2010 Value: $179Permit type: Delead | Permit id: Ea34869 | |||||
L l-1 (clean only) thoroughly re-clean the following areas as per new york city health code section 173. 14 and as noted in the scope of work p Date: November 1, 2010 Value: $179Permit type: Delead | Permit id: Eb13998 | |||||
L l-1 (clean only) thoroughly re-clean the following areas as per new york city health code section 173. 14 and as noted in the scope of work p Date: December 1, 2010 Value: $145Permit type: Delead | Permit id: Eb16264 | |||||
As per rc #2006001254204 (enviro-probe, inc.), perform total lead analysis of 16 dust wipe sample(s) via environmental protection agency (epa) sw845- Date: July 10, 2006Permit type: Delead | Permit id: E700386 | |||||
As per rc #2006001254202 (enviro-probe, inc.), perform total lead analysis of 15 dust wipe sample(s) via environmental protection agency (epa) sw845 Date: October 31, 2005Permit type: Delead | Permit id: E612428 | |||||
As per rc #2005001319001 (enviro-probe, inc.), perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw845-3 Date: March 16, 2005Permit type: Delead | Permit id: E524745 | |||||
Local law #1 violation : as per rc #20050021221 (linear bk-e,qns) and attached scope of work thoroughly remove all lead violations as per new york ci Date: March 21, 2005Permit type: Delead | Permit id: E525184 | |||||
Apt. 2e: scrub and remove all mold mildew from bathroom walls , approx 65 sq. Ft. Prime and paint, use one (1) coat of stain killer, one (1) coat sem Date: March 10, 2005Permit type: Gc | Permit id: E523945 | |||||
Local law # 1 violation violation as per attached scope of work thoroughly remove all lead violations as per new york city administrative code 27-2 Date: June 2, 2009Permit type: Delead | Permit id: E937898 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: May 27, 2010Permit type: Delead | Permit id: Ea37085 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: May 3, 2010Permit type: Delead | Permit id: Ea34133 | |||||
Perform total lead analysis of 15 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: April 29, 2010Permit type: Delead | Permit id: Ea34100 | |||||
Perform total lead analysis of 03 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 18, 2009Permit type: Delead | Permit id: Ea10359 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 22, 2009Permit type: Delead | Permit id: Ea10682 | |||||
Perform total lead analysis of 07 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: September 28, 2009Permit type: Delead | Permit id: Ea11145 | |||||
Perform total lead analysis of 05 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 1, 2009Permit type: Delead | Permit id: Ea11595 | |||||
As per hpds lead abatement requirement contracts and attached scope of work thoroughly remove all lead violations as per new york city administrative Date: August 12, 2009Permit type: Delead | Permit id: Ea06333 | |||||
Perform total lead analysis of 02 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: October 9, 2009Permit type: Delead | Permit id: Ea12428 | |||||
Perform total lead analysis of 04 dust wipe sample(s) via environmental protection agency (epa) sw8453050-74 method utilizing flame atomic absorptio Date: May 13, 2010Permit type: Delead | Permit id: Ea35469 | |||||
Apt 3c) at 2nd room from east south, replace defective thermo window. Aluminum tpye brown color including inside and outside restoration. Approx. Date: September 25, 2006Permit type: Gc | Permit id: E707988 |