ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
F4/ demo, interior work and ada exterior lifts Date: March 23, 2015Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2015 | Permit id: 2015-138155-000 | |||||
F4/ demo selected partition walls, doors, ceiling, floor assemblys; basement, first floor, 2nd floor, paint, patch. See 15-169714fa for build-out/ ti work Date: March 30, 2015Permit type: Intake | Permit status: Closed | Completion date: March 23, 2015 | Permit id: 2015-138175-000 | |||||
Ff4/ basement, ground and second floor improvements. See 15- 138175fa for interior demolition work Permit type: Intake | Permit status: Closed | Completion date: May 12, 2015 | Permit id: 2015-169714-000 | |||||
Ff4/ basement, ground and second floor improvements. See 15- 138175fa for interior demolition work Permit type: Environmental services | Permit status: Approved | Completion date: May 15, 2015 | Permit id: 2015-169714-000 | |||||
Art open house/first thursday Date: June 3, 2015Permit type: Intake | Permit status: Complete | Completion date: May 29, 2015 | Permit id: 2015-177626-000 | |||||
1st & 2nd floor remodel - power Permit type: Intake | Permit status: Closed | Completion date: June 1, 2015 | Permit id: 2015-178567-000 | |||||
Plumbing renovation at us custom house 1st and 2nd floor4 pantries w/ sink, ice maker, dw, coffee, water disspencer Date: June 2, 2015Permit type: Intake | Permit status: Closed | Completion date: June 2, 2015 | Permit id: 2015-179064-000 | |||||
F12/ nw 8th ave. Exterior accessibility lifts for access to interior of building Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-188843-000 | |||||
Exterior accessibility lifts - power Date: June 22, 2015Permit type: Intake | Permit status: Closed | Completion date: June 22, 2015 | Permit id: 2015-190174-000 | |||||
First thursday open house Date: July 1, 2015Permit type: Intake | Permit status: Complete | Completion date: June 30, 2015 | Permit id: 2015-194152-000 | |||||
Job# 93047 (4)ckts for pumps Date: July 15, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: October 28, 2014 | Permit id: 2014-183819-000 | |||||
Approval of the following exterior alterations to the landmarks structure in the central city plan district: modifications of the stair set from the sidewalk to the exterior courtyard (5 steps), fronting nw 8th avenue for installation of a wheel chair incline lift. Modify two existing fixed iron security gates within the arched colonnade with the addition of hinges to swing gates. All metal gates and security assemblies will be painted gloss industrial black to match existing color and finish. Reposition two handrails to the centerline of courtyard columns, and one new handrail located on the south west corner of the steps. Relocate the existing ada signage behind the existing bicycle loop. The interior courtyard steps ( steps) will receive a standard wheel chair incline lift in a straight run. Approved per the approved site plans, exhibits c-1 through c-6, signed and dated november 16, 2015, subject to the following conditions:a. As part of the building permit application submittal, Date: November 20, 2015Permit type: Land use review | Permit status: Completed | Completion date: July 27, 2015 | Permit id: 2015-205954-000 | |||||
1st thursday event, with live band & dj Date: July 31, 2015Permit type: Intake | Permit status: Complete | Completion date: July 24, 2015 | Permit id: 2015-206951-000 | |||||
Weworks- basement, 1st and 2nd floors- alteration to the fire sprinklers as needed for t. I.- 14 heads10- new heads, 4- relocate Date: August 12, 2015Permit type: Intake | Permit status: Closed | Completion date: August 12, 2015 | Permit id: 2015-217087-000 | |||||
8-13-15 noise complaint - amplified music Permit type: Request | Permit status: Closed | Completion date: August 13, 2015 | Permit id: 2015-217591-000 | |||||
1st & 2nd floor wework remodel - voice/data-audio/video-security Date: August 17, 2015Permit type: Intake | Permit status: Closed | Completion date: August 17, 2015 | Permit id: 2015-219256-000 | |||||
F18/1st fl-partial 2nd fl-replace existing vav boxes, revise ducting, install smoke dampers at supply return & exhaust shafts. Date: September 10, 2015Permit type: Intake | Permit status: Closed | Completion date: August 28, 2015 | Permit id: 2015-227833-000 | |||||
Approval of two permanent banner signs on the landmark us custom house in the river district subdistrict of the central city plan district-each about 32 square feet in area and one each located at the northeast and southeast corner of the building-and two plaque-type signs and mounted on columns on the loggia on the west elevation, one each on either side of the stair into the courtyard-per the approved site plans, exhibits c-1 through c-6, signed and dated 02/19/2016, subject to the following conditions:a. As part of the building permit application submittal, the following development-related condition (b) must be noted on each of the four required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page- case file lu 15-2351 hr. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. All penetrations of anchors, rods, s Date: February 29, 2016Permit type: Land use review | Permit status: Completed | Completion date: September 16, 2015 | Permit id: 2015-235110-000 | |||||
F15/ wework, phase 1. 5 - build-out remainder of second floor. See 15-169714 fa for phase- 1 work. New offices, partitions, plumbing, electrical, finishes, ceiling Date: November 18, 2015Permit type: Intake | Permit status: Closed | Completion date: October 9, 2015 | Permit id: 2015-248892-000 | |||||
Replace fire alarm panel and upgrade basement, 1st, and 2nd floors to current code in a 2 phase process. Date: October 19, 2015Permit type: Intake | Permit status: Closed | Completion date: October 19, 2015 | Permit id: 2015-252707-000 | |||||
2nd fl ph 1. 5 ti - power Date: October 27, 2015Permit type: Intake | Permit status: Closed | Completion date: October 27, 2015 | Permit id: 2015-256723-000 | |||||
2nd fl ph 1. 5 ti - voice/data Date: October 28, 2015Permit type: Intake | Permit status: Closed | Completion date: October 28, 2015 | Permit id: 2015-257609-000 | |||||
F23/2nd flr - replace existing penumatic vav boces and install smoke dampers at shaft 5, elec Date: December 18, 2015Permit type: Intake | Permit status: Closed | Completion date: November 27, 2015 | Permit id: 2015-268721-000 | |||||
Plumbing renovation at us custom house 1st and 2nd floorpantry w/ sink, ice maker, dw, coffee, water disspencer Date: December 18, 2015Permit type: Intake | Permit status: Closed | Completion date: December 18, 2015 | Permit id: 2015-279096-000 | |||||
F17/ phase 2; partial third floor, area 3a; walls, doors, relites, storefront type walls, ceiling, elec, plbg, finishes Date: December 28, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 28, 2015 | Permit id: 2015-281931-000 | |||||
F17/ phase 2; partial third floor, area 3a; walls, doors, relites, storefront type walls, offices, ceiling, elec, plbg, finishes Date: January 12, 2016Permit type: Intake | Permit status: Closed | Completion date: December 28, 2015 | Permit id: 2015-281935-000 | |||||
Plumbing renovation at us customs house area 3a 3rd floor phase 2sink, dw, coffee, im, water cooler, Date: January 6, 2016Permit type: Intake | Permit status: Closed | Completion date: January 5, 2016 | Permit id: 2016-100469-000 | |||||
Ph2 3rd fl area 3a ti - power Date: January 11, 2016Permit type: Intake | Permit status: Closed | Completion date: January 11, 2016 | Permit id: 2016-103092-000 | |||||
Ph2 3rd fl area 3a ti - voice/data Date: January 11, 2016Permit type: Intake | Permit status: Closed | Completion date: January 11, 2016 | Permit id: 2016-103377-000 | |||||
3rd floor- area 3a- alteration to the fire alaem system as needed for partial t. I.- 21 devices total 7- smoke detectors, 4- strobes, 9- h/s, 1 nac panel Date: January 27, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2016-112034-000 | |||||
F5/install smoke dampers and mechanical shafts, replace four pneumatic vav boxes, elec. Date: February 22, 2016Permit type: Intake | Permit status: Closed | Completion date: February 11, 2016 | Permit id: 2016-120134-000 | |||||
Install (1) non-illuminated projecting sign, 31. 5 sq ft, north elevation, sign a Date: March 9, 2016Permit type: Intake | Permit status: Closed | Completion date: March 4, 2016 | Permit id: 2016-130826-000 | |||||
Install (1) non-illuminated projecting sign, 31. 5 sq ft, south elevation, sign b Date: March 9, 2016Permit type: Intake | Permit status: Closed | Completion date: March 4, 2016 | Permit id: 2016-130828-000 | |||||
Install (1) non-illuminated wall sign, 7 sq ft, west elevation, sign c Date: March 9, 2016Permit type: Intake | Permit status: Closed | Completion date: March 4, 2016 | Permit id: 2016-130830-000 | |||||
Install (1) non-illuminated wall sign, 7 sq ft, west elevation, sign d Date: March 9, 2016Permit type: Intake | Permit status: Closed | Completion date: March 4, 2016 | Permit id: 2016-130832-000 | |||||
Prewire and install of access systemfaxed Date: March 27, 2013Permit type: Electrical inspections | Permit status: Approved | Completion date: July 7, 2015 | Permit id: 2013-132719-000 | |||||
Ff4/ wework, phase 1- basement, ground and partial second floor improvements. See 15- 138175fa for interior demolition work Date: July 10, 2015Permit type: Intake | Permit status: Closed | Completion date: May 12, 2015 | Permit id: 2015-169714-000 | |||||
Ff4/ wework, phase 1, dfs 01 for interior storefront partition system Date: September 8, 2015Permit type: Intake | Permit status: Closed | Completion date: August 14, 2015 | Permit id: 2015-169714-Dfs | |||||
1st & 2nd floor wework remodel - power/voice/data cable tray/fire alarm system Date: July 24, 2015Permit type: Intake | Permit status: Closed | Completion date: June 1, 2015 | Permit id: 2015-178567-000 | |||||
Plumbing renovation at us custom house 1st and 2nd floor3 pantries w/ sink, ice maker, dw, coffee, water disspencer7/20/15 jns pmsi was entered by mistake on application per kevin johnson the new plumber is rayborns plumbing Date: June 2, 2015Permit type: Intake | Permit status: Closed | Completion date: June 2, 2015 | Permit id: 2015-179064-000 | |||||
F12/ wework- lifts - exterior accessibility lifts for access to interior of building Date: December 11, 2015Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-188843-000 | |||||
8-13-15 noise complaint - amplified music Permit type: Request | Permit status: Closed | Completion date: August 13, 2015 | Permit id: 2015-217591-000 | |||||
1st & 2nd floor wework remodel - voice data-audio video-security Date: August 17, 2015Permit type: Intake | Permit status: Closed | Completion date: August 17, 2015 | Permit id: 2015-219256-000 | |||||
F18 1st fl-partial 2nd fl-replace existing vav boxes, revise ducting, install smoke dampers at supply return & exhaust shafts. Date: September 10, 2015Permit type: Intake | Permit status: Closed | Completion date: August 28, 2015 | Permit id: 2015-227833-000 | |||||
Approval of two permanent banner signs on the landmark us custom house in the river district subdistrict of the central city plan district-each about 32 square feet in area and one each located at the northeast and southeast corner of the building-and two plaque-type signs and mounted on columns on the loggia on the west elevation, one each on either side of the stair into the courtyard-per the approved site plans, exhibits c-1 through c-6, signed and dated 02 19 2016, subject to the following conditions:a. As part of the building permit application submittal, the following development-related condition (b) must be noted on each of the four required site plans or included as a sheet in the numbered set of plans. The sheet on which this information appears must be labeled zoning compliance page- case file lu 15-2351 hr. All requirements must be graphically represented on the site plan, landscape, or other required plan and must be labeled required. B. All penetrations of anchors, rods, s Date: February 29, 2016Permit type: Land use review | Permit status: Completed | Completion date: September 16, 2015 | Permit id: 2015-235110-000 | |||||
F15 wework, phase 1. 5 - build-out remainder of second floor. See 15-169714 fa for phase- 1 work. New offices, partitions, plumbing, electrical, finishes, ceiling Date: November 18, 2015Permit type: Intake | Permit status: Closed | Completion date: October 9, 2015 | Permit id: 2015-248892-000 | |||||
2nd fl ph 1. 5 ti - voice data Date: October 28, 2015Permit type: Intake | Permit status: Closed | Completion date: October 28, 2015 | Permit id: 2015-257609-000 | |||||
F23 2nd flr - replace existing penumatic vav boces and install smoke dampers at shaft 5, elec Date: December 18, 2015Permit type: Intake | Permit status: Closed | Completion date: November 27, 2015 | Permit id: 2015-268721-000 | |||||
Plumbing renovation at us custom house 1st and 2nd floorpantry w sink, ice maker, dw, coffee, water disspencer Date: December 18, 2015Permit type: Intake | Permit status: Closed | Completion date: December 18, 2015 | Permit id: 2015-279096-000 | |||||
F17 phase 2; partial third floor, area 3a; walls, doors, relites, storefront type walls, ceiling, elec, plbg, finishes Date: December 28, 2015Permit type: Reviews | Permit status: Approved | Completion date: December 28, 2015 | Permit id: 2015-281931-000 | |||||
F17 phase 2; partial third floor, area 3a; walls, doors, relites, storefront type walls, offices, ceiling, elec, plbg, finishes Date: January 12, 2016Permit type: Intake | Permit status: Closed | Completion date: December 28, 2015 | Permit id: 2015-281935-000 | |||||
Ph2 3rd fl area 3a ti - voice data Date: January 11, 2016Permit type: Intake | Permit status: Closed | Completion date: January 11, 2016 | Permit id: 2016-103377-000 | |||||
3rd floor- area 3a- alteration to the fire alaem system as needed for partial t. I.- 21 devices total 7- smoke detectors, 4- strobes, 9- h s, 1 nac panel Date: January 27, 2016Permit type: Intake | Permit status: Closed | Completion date: January 27, 2016 | Permit id: 2016-112034-000 | |||||
F5 install smoke dampers and mechanical shafts, replace four pneumatic vav boxes, elec. Date: February 22, 2016Permit type: Intake | Permit status: Closed | Completion date: February 11, 2016 | Permit id: 2016-120134-000 | |||||
F4 demo, interior work and ada exterior lifts Date: March 23, 2015Permit type: Reviews | Permit status: Approved | Completion date: March 23, 2015 | Permit id: 2015-138155-000 | |||||
F4 demo selected partition walls, doors, ceiling, floor assemblys; basement, first floor, 2nd floor, paint, patch. See 15-169714fa for build-out ti work Date: March 30, 2015Permit type: Intake | Permit status: Closed | Completion date: March 23, 2015 | Permit id: 2015-138175-000 | |||||
Ff4 wework, phase 1- basement, ground and partial second floor improvements. See 15- 138175fa for interior demolition work Date: July 10, 2015Permit type: Intake | Permit status: Closed | Completion date: May 12, 2015 | Permit id: 2015-169714-000 | |||||
Ff4 wework, phase 1, dfs 01 for interior storefront partition system Date: September 8, 2015Permit type: Intake | Permit status: Closed | Completion date: August 14, 2015 | Permit id: 2015-169714-Dfs | |||||
Art open house first thursday Date: June 3, 2015Permit type: Intake | Permit status: Complete | Completion date: May 29, 2015 | Permit id: 2015-177626-000 | |||||
1st & 2nd floor wework remodel - power voice data cable tray fire alarm system Date: July 24, 2015Permit type: Intake | Permit status: Closed | Completion date: June 1, 2015 | Permit id: 2015-178567-000 | |||||
Plumbing renovation at us custom house 1st and 2nd floor3 pantries w sink, ice maker, dw, coffee, water disspencer7 20 15 jns pmsi was entered by mistake on application per kevin johnson the new plumber is rayborns plumbing Date: June 2, 2015Permit type: Intake | Permit status: Closed | Completion date: June 2, 2015 | Permit id: 2015-179064-000 | |||||
F12 wework- lifts - exterior accessibility lifts for access to interior of building Date: December 11, 2015Permit type: Intake | Permit status: Closed | Completion date: June 19, 2015 | Permit id: 2015-188843-000 |