ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Construction of parking lot (212 spaces - estimated total lod is 108 000sf (2. 48 acres) total paved area is 600sf (1. 85 acres) total swm area is 27 000sf (. 62 acres)grading - estimated cut = 2 450cy estimated fill = 0cy) with vehicular access from existing baltimore sun main entrance as well as proposed vehicular access from east cromwell street installation of lighting and stormwater management facilities accessible parking spaces and an accessible route from the parking lot to the east cromwell right-of-way as per plans as per code. Separate permit required for all work on the right-of-way. Date: June 22, 2017 Value: $350,000Expiration date: June 22, 2018 | Permit id: Com2017-09110 | |||||
Amend permit: add prime contractor .(original permit:com2017-09110:construction of parking lot (212 spaces - estimated total lod is 108 000sf (2. 48 acres) total paved area is 600sf (1. 85 acres) total swm area is 27 000sf (. 62 acres)grading - estimated cut = 2 450cy estimated fill = 0cy) with vehicular access from existing baltimore sun main entrance as well as proposed vehicular access from east cromwell street installation of lighting and stormwater management facilities accessible parking spaces and an accessible route from the parking lot to the east cromwell right-of-way as per plans as per code. Separate permit required for all work on the right-of-way.)original permit description:(com2017-09110)construction of parking lot (212 spaces - estimated total lod is 108 000sf (2. 48 acres) total paved area is 600sf (1. 85 acres) total swm area is 27 000sf (. 62 acres)grading - estimated cut = 2 450cy estimated fill = 0cy) with vehicular access from existing baltimore sun main entrance a Date: August 14, 2017Expiration date: June 22, 2018 | Permit id: Com2017-59233 |