ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Replacinggas service in accordance with washington gas plan no. 261236. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preco Date: January 31, 2014Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 308554 | |||||
Alteration pv solar system - roof mounted Date: September 14, 2012 Value: $26,500Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 611270 | |||||
Gorbachev residence pv system - ap #6112 7. 20kw system, modules, 2-3600w inverters, accumulater w/ 2-20amp breakers, 60amp disconnect w/40amp fuses connected ahead of mcb in ats Date: September 14, 2012Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 611536 | |||||
200amp generator Date: January 16, 2014Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 660612 | |||||
Electrical permit Date: December 15, 2008Permit status: Finaled | Current use: Single family dwelling | Permit id: 502111 |