Pre-construction meeting required contact mc. Dps inspector richard long @ 301-370-3709 install 8-inch dip water connection as shown on wssc approved plan #04-0s-0457. All work must be in accordance with the approved plans and the "montgomery county specifications for utility construction permit" dated july, 2003. Prior to release of this permit, complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Disturbed areas shall be fine graded & sodded. Roadways shall be kept free of mud & debris. Materials & equipment shall not be stored in right-of-way. Notify mc. Dps inspector when work is complete. Date: July 11, 2006Permit type: Public right of way | Permit status: Completed | Current use: Public utility | Permit id: 246644 |