ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Existing commercial - 400amp heavy up Date: September 3, 2013Permit type: Electrical permit | Permit status: Finaled | Current use: Business building | Permit id: 647437 | |||||
Replace overhead transformer,cable and associated equipment in accordance with pepco plan no. 3435663. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row Date: November 6, 2013Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 304066 | |||||
Driveway permit: widen and pave shoulder as per plan and as directed by the dps inspector. Date: April 13, 2005Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 235836 |