| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
For the complete demolition of an existing, attached, three (3) story structure. Structure to be demolished by hand and with hand held tools only. Pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. A covered walkway or sidewalk closure shall be required within 8 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits are required. 21 day posting and notice required per a-303. 2 newly exposed walls to be treated permit received from downstairs Date: August 14, 2017Permit type: Demolition permit | Permit status: Completed | Completion date: October 2, 2017 | Permit id: 802274 | |||||
For the complete demolition of an existing structure. No use on property. Separate use premit required prior to occupancy. Date: August 14, 2017Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 14, 2017 | Permit id: 802273 | |||||
For the erection of an attached structure (maximum height nte 38 feet) with cellar, roof deck on second floor rear accessed through second floor rear , roof deck above fourth floor with access structure (size nte sq. Ft, and maximum height nte fee). ( size and location as shown on the attached plan). For use as a two family household living. Date: September 27, 2017Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 27, 2017 | Permit id: 817413 | |||||
For the erection of an attached structure (maximum height nte 38 feet) with cellar, roof deck on second floor rear accessed through second floor rear , roof deck above fourth floor with access structure (size nte sq. Ft,and maximum height nte fee). (details including size and location as shown on the attached plan). For use as a two family household living. Seperate permit required for electrical, mechanical, plumbing and sprinkler (13-r system) work. Work includes underpinning of foundation as per details shown on the attached plan. Engineer shall be at site for excavation and underpinning. Contractor shall provide temporary shoring prior to excavation for underpinning to protect adjacent properties. Date: September 27, 2017Permit type: New construction permit | Permit status: Active | Completion date: November 7, 2017 | Permit id: 817416 | |||||
SCORE 89 Seal lateral pa20171861643 (sfd)"self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: July 7, 2017 Contractor: Pipeline Plumbing LlcPermit type: Plumbing permit | Permit status: Active | Completion date: August 28, 2017 | Permit id: 797697 | |||||
SCORE 100 For the installation of a fire suppression system in accordance with nfpa 2007, standard 13r to include a 2-inch diameter service line and backflow prevention assembly. Date: December 7, 2017 Contractor: Elite Fire ProtectionPermit type: Suppression permit | Permit status: Active | Completion date: December 7, 2017 | Permit id: 830113 |