ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 225a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 2, 2015 Contractor: Solarcity CorporationPermit type: Addn | Permit status: Completed | Completion date: April 21, 2016 | Permit id: Pds2015-Resalt- | |||||
SCORE 95 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 225a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: November 2, 2015 Contractor: Solarcity CorporationPermit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2015-Resalt- | |||||
New cell site for verizon new verizon wireless 389 sf lease are 1 verizon wireless 8x168" cmu block wall equipment enclosure 1 new standby generator diesel 1 new verizon wireless electrical meter 2 amp 1 at&t ciena box wall mounted with unistrut 1 sunwest enclosure wall mounted with unistrut 1 verizon wireless 35 tall monoeucalyptus 8 new verizon wireless 6 tall panel antennas 2 new verizon wireless raycaps near antennas 1 overhead utility runs for telephone and electrical service 1 new bore trench for hybrid cables 1 new verizon wiirelessgps antenna 1 new verizon wireless ilc panel Date: September 19, 2017 Value: $200,000Permit type: New primary comm structure | Permit status: Open | Permit id: Pds2017-Compri- | |||||
Final Date: June 18, 2009Permit status: Pass | Permit id: Pds2008-1003-20 | |||||
Combo frame Date: December 8, 2008Permit status: Fail | Permit id: Pds2008-1003-20 |