ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Ivy slope replanting and monitoring per condition of lu case 13-184179adhold open until november 20, 2016 Date: November 20, 2014Permit type: Intake | Permit status: Approved | Completion date: November 20, 2014 | Permit id: 2014-240328-000 | |||||
Hazardous materials-6 gallon diesel standby generator system Date: January 29, 2015Permit type: Intake | Permit status: Approved | Completion date: December 1, 2014 | Permit id: 2014-243605-000 | |||||
Hazardous/tank - installation of 6 gal generator fuel tank #1 (s/n 44438) Date: January 29, 2015Permit type: Intake | Permit status: Approved | Completion date: January 29, 2015 | Permit id: 2015-111808-000 | |||||
New non-illuminated 40sf sign on west elevation Date: March 4, 2015Permit type: Intake | Permit status: Closed | Completion date: March 4, 2015 | Permit id: 2015-128771-000 | |||||
Install irrigation control wires/ low voltage 1 circuit Date: March 11, 2015Permit type: Intake | Permit status: Closed | Completion date: March 11, 2015 | Permit id: 2015-132352-000 | |||||
Irrigation wire installation for landscape system Date: March 13, 2015Permit type: Intake | Permit status: Closed | Completion date: March 13, 2015 | Permit id: 2015-133386-000 | |||||
Sprinkler - relocate existing pipe and sprinklers to maintain coverage in area of work. Add sidewall head to cover new ceiling pocket, add sprinklers as needed Date: April 1, 2015Permit type: Intake | Permit status: Approved | Completion date: March 24, 2015 | Permit id: 2015-139084-000 | |||||
Excavate behind existing retaining wall and fill with and backfill with low density cdf Date: April 3, 2015Permit type: Application | Permit status: Approved | Completion date: March 25, 2015 | Permit id: 2015-139741-000 | |||||
New flag pole and foundations Date: March 26, 2015Permit type: Application | Permit status: Approved | Completion date: March 26, 2015 | Permit id: 2015-140396-000 | |||||
B2/ room 129, vault; install spacesaver mobile file system Date: April 3, 2015Permit type: Reviews | Permit status: Approved | Completion date: April 3, 2015 | Permit id: 2015-145008-000 | |||||
Row sanitary sewer. - pbot note location Date: July 6, 2011Permit type: Intake | Permit status: Closed | Completion date: July 6, 2011 | Permit id: 2011-155138-000 | |||||
New one-story warehouse and associated site work for redevelopment of city of portland water bureau facilities. Date: November 8, 2012Permit type: Application | Permit status: Approved | Completion date: March 14, 2012 | Permit id: 2012-113163-000 | |||||
Revision - to dfs 07 - suspended ceiling design change Date: May 23, 2014Permit type: Application | Permit status: Approved | Completion date: March 14, 2014 | Permit id: 2012-113163-Rev | |||||
Revision - retain existing fueling station, generator building and driveway between upper and lower parking lots. N kerby lot has been removed from the scope of work. Addtional revions made to accomodate the exsisting conditions. Date: January 5, 2015Permit type: Application | Permit status: Approved | Completion date: September 29, 2014 | Permit id: 2012-113163-Rev | |||||
New - 1853 sf storage canopy at warehouse loading dock (canopy plans included in main permit 12-113163 co plans due to size needs separate permit) Date: November 8, 2012Permit type: Application | Permit status: Approved | Completion date: July 2, 2012 | Permit id: 2012-157398-000 | |||||
New - 4 sf trash enclosure (plans are with main permit 12-113163 co plans but due to size needs separate permit) Date: November 8, 2012Permit type: Application | Permit status: Approved | Completion date: July 11, 2012 | Permit id: 2012-157400-000 | |||||
Demolish 5468 sf shed (no basement) Date: November 8, 2012Permit type: Application | Permit status: Approved | Completion date: September 24, 2012 | Permit id: 2012-160241-000 | |||||
New 2-story 44, 8 sq ft office building with green roof, steel frame with rainscreen envelope design and elevator. Nfpa 13 sprinkler system. Date: August 1, 2013Permit type: Application | Permit status: Approved | Completion date: January 18, 2013 | Permit id: 2013-101210-000 | |||||
Dfs for steel stairs and guardrails Date: August 22, 2014Permit type: Application | Permit status: Approved | Completion date: June 19, 2014 | Permit id: 2013-101210-Dfs | |||||
Dfs - storefront glazing Date: August 22, 2014Permit type: Application | Permit status: Approved | Completion date: July 3, 2014 | Permit id: 2013-101210-Dfs | |||||
Dfs for attachment of metal panels Date: September 3, 2014Permit type: Application | Permit status: Approved | Completion date: July 23, 2014 | Permit id: 2013-101210-Dfs | |||||
Level 1 seismic for hangers and supports Date: October 10, 2014Permit type: Application | Permit status: Approved | Completion date: July 25, 2014 | Permit id: 2013-101210-Dfs | |||||
Dfs for skylights Date: September 25, 2014Permit type: Application | Permit status: Approved | Completion date: August 13, 2014 | Permit id: 2013-101210-Dfs | |||||
Dfs for hvac rooftop equipment, seismic Date: March 2, 2015Permit type: Application | Permit status: Approved | Completion date: August 22, 2014 | Permit id: 2013-101210-Dfs | |||||
Dfs for suspended ceilings Date: October 10, 2014Permit type: Application | Permit status: Approved | Completion date: August 29, 2014 | Permit id: 2013-101210-Dfs | |||||
Dfs for pwb ops roof hatch attachment Date: January 20, 2015Permit type: Application | Permit status: Approved | Completion date: November 13, 2014 | Permit id: 2013-101210-Dfs | |||||
Dfs - seismic for electrical systems Date: January 20, 2015Permit type: Application | Permit status: Approved | Completion date: November 26, 2014 | Permit id: 2013-101210-Dfs | |||||
Dfs for ops building ships ladder Date: January 20, 2015Permit type: Application | Permit status: Approved | Completion date: December 12, 2014 | Permit id: 2013-101210-Dfs | |||||
Rev 01 new water service from tillamook - new meter to be installed by wb Date: March 6, 2014Permit type: Application | Permit status: Approved | Completion date: January 14, 2014 | Permit id: 2013-101210-Rev | |||||
Revision - change embed details on north face ov sw-2 at ls and the roof, grid b (3/mnt-s 310). Contractor cut out seven rebar to access through connection embed Date: June 17, 2014Permit type: Application | Permit status: Approved | Completion date: June 6, 2014 | Permit id: 2013-101210-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; site plan revised to show generator blg to remain, new exterior staircase by others, small change to grading, revised landscaping plan, Permit type: Application | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2013-101210-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; site plan revised to show generator blg to remain, new exterior staircase by others, small change to grading, revised landscaping plan, Permit type: Issuance/intake | Permit status: Intake | Completion date: May 26, 2015 | Permit id: 2013-101210-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; site plan revised to show generator blg to remain, new exterior staircase by others, small change to grading, revised landscaping plan, Permit type: Process management | Permit status: Closed | Completion date: May 26, 2015 | Permit id: 2013-101210-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; site plan revised to show generator blg to remain, new exterior staircase by others, small change to grading, revised landscaping plan, Permit type: Planning and zoning | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2013-101210-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; site plan revised to show generator blg to remain, new exterior staircase by others, small change to grading, revised landscaping plan, Permit type: Structural | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2013-101210-Rev | |||||
47 zone, 100-ton vav, hw reheat, two 10 mbh condensing boiler, circ pumps w/vsd, 20-ton hrv, four 1. 5-ton & one 2. 5-ton ductless splits, plans w/co Date: August 1, 2013Permit type: Intake | Permit status: Closed | Completion date: January 23, 2013 | Permit id: 2013-101235-000 | |||||
Demolish existing two story concrete frame building with raised loading dock. Date: August 1, 2013Permit type: Application | Permit status: Approved w/ cond | Completion date: January 18, 2013 | Permit id: 2013-101264-000 | |||||
Office improvements on first and second floors to existing 2-story 26,0 sq ft office/operations building. No occupancy change. Date: August 1, 2013Permit type: Application | Permit status: Approved | Completion date: January 18, 2013 | Permit id: 2013-101265-000 | |||||
Revision - clarify special inspections requirements Date: February 4, 2014Permit type: Application | Permit status: Approved | Completion date: November 14, 2013 | Permit id: 2013-101265-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; ops bldg interior tenant improvements have been removed from scope of work; new closed added to osp 2nd floor; exiting path reconfigured. Permit type: Application | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2013-101265-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; ops bldg interior tenant improvements have been removed from scope of work; new closed added to osp 2nd floor; exiting path reconfigured. Permit type: Issuance/intake | Permit status: Intake | Completion date: May 26, 2015 | Permit id: 2013-101265-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; ops bldg interior tenant improvements have been removed from scope of work; new closed added to osp 2nd floor; exiting path reconfigured. Permit type: Process management | Permit status: Closed | Completion date: May 26, 2015 | Permit id: 2013-101265-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; ops bldg interior tenant improvements have been removed from scope of work; new closed added to osp 2nd floor; exiting path reconfigured. Permit type: Planning and zoning | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2013-101265-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; ops bldg interior tenant improvements have been removed from scope of work; new closed added to osp 2nd floor; exiting path reconfigured. Permit type: Site development | Permit status: Not reqd | Completion date: May 26, 2015 | Permit id: 2013-101265-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; ops bldg interior tenant improvements have been removed from scope of work; new closed added to osp 2nd floor; exiting path reconfigured. Permit type: Structural | Permit status: Approved | Completion date: July 6, 2015 | Permit id: 2013-101265-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; ops bldg interior tenant improvements have been removed from scope of work; new closed added to osp 2nd floor; exiting path reconfigured. Permit type: Structural | Permit status: Not reqd | Completion date: July 6, 2015 | Permit id: 2013-101265-Rev | |||||
New 1 sf concrete masonry trash enclosure with metal roof. Date: August 1, 2013Permit type: Application | Permit status: Approved | Completion date: January 18, 2013 | Permit id: 2013-101290-000 | |||||
Hvac ductwork will be asdusted to complement partition changes on first and second floors Date: August 1, 2013Permit type: Intake | Permit status: Closed | Completion date: January 28, 2013 | Permit id: 2013-107748-000 | |||||
Add amp panel with 6 circuitsfaxed Date: March 1, 2013Permit type: Intake | Permit status: Closed | Completion date: March 1, 2013 | Permit id: 2013-122205-000 | |||||
Alarm - installation of new fire system designed to meet nfpa 72 & ossc requirements Date: October 10, 2013Permit type: Intake | Permit status: Approved | Completion date: September 24, 2013 | Permit id: 2013-209140-000 | |||||
Phase ii: maintenance building electrical work. Date: April 3, 2014Permit type: Intake | Permit status: Closed | Completion date: January 14, 2014 | Permit id: 2014-104837-000 | |||||
Card access system and video - low volt Date: February 19, 2014Permit type: Intake | Permit status: Closed | Completion date: February 19, 2014 | Permit id: 2014-118260-000 | |||||
Plumbing fixtures for new office building. Date: March 20, 2014Permit type: Intake | Permit status: Closed | Completion date: March 19, 2014 | Permit id: 2014-128785-000 | |||||
Sani conn: 195 of csp sanitary sewer in n tillamook st at 6 branch 526 from manhole (abc498) at intersection of n kerby & n tillamook. Branch 18 long, 8 deep. Contractor to verify location & depth of connection in field. Date: April 3, 2014Permit type: Intake | Permit status: Closed | Completion date: April 3, 2014 | Permit id: 2014-134923-000 | |||||
Install 56 of sanitary sewer, 6 of storm sewer and 3 of water service. Date: April 3, 2014Permit type: Intake | Permit status: Closed | Completion date: April 3, 2014 | Permit id: 2014-134934-000 | |||||
Sprinkler - install new wet sprinkler system to fully protect new 2-story building Date: May 27, 2014Permit type: Intake | Permit status: Approved | Completion date: May 8, 2014 | Permit id: 2014-153654-000 | |||||
Racking for piping, wood and metals Date: June 17, 2014Permit type: Application | Permit status: Approved | Completion date: May 9, 2014 | Permit id: 2014-154846-000 | |||||
New nonilluminated 40sf sign on west elevation Date: May 20, 2014Permit type: Intake | Permit status: Closed | Completion date: May 15, 2014 | Permit id: 2014-157265-000 | |||||
Convert existing conference room to two individual office spaces, Date: July 2, 2014Permit type: Application | Permit status: Approved | Completion date: July 2, 2014 | Permit id: 2014-178477-000 | |||||
Underground installation of double-check 676 -la dcva. Installation of 4 water line (fire line) Date: September 11, 2014Permit type: Intake | Permit status: Approved | Completion date: August 29, 2014 | Permit id: 2014-206135-000 | |||||
Install underground sanitary sewer, storm sewer and water line - for building located by parking Date: August 29, 2014Permit type: Intake | Permit status: Closed | Completion date: August 29, 2014 | Permit id: 2014-206172-000 | |||||
Hvac control wiring. Low voltage Date: October 6, 2014Permit type: Electrical inspections | Permit status: Approved | Completion date: March 2, 2015 | Permit id: 2014-222049-000 | |||||
Sanitary only connection to bes mh abc5 located at the intersection of n wheeler pl and n kerby ave. Contractor will need to make multiple bends in row from property line due to utility obstructions. Follow details p262/p257. Date: October 22, 2014Permit type: Intake | Permit status: Closed | Completion date: October 22, 2014 | Permit id: 2014-229060-000 | |||||
Alarm-install of new fire alarm system designed to meet nfpa 72 & ossc requirements Date: November 13, 2014Permit type: Intake | Permit status: Approved | Completion date: October 27, 2014 | Permit id: 2014-230775-000 | |||||
Construct freestanding exterior stair between upper and lower parking lots Date: October 27, 2015Permit type: Application | Permit status: Approved | Completion date: August 25, 2015 | Permit id: 2015-225029-000 | |||||
Cap (3) sewer lines from demolished building Date: September 11, 2015Permit type: Intake | Permit status: Closed | Completion date: September 11, 2015 | Permit id: 2015-235220-000 | |||||
Programmatic permit water bureau Date: July 17, 2015Permit type: A - research | Permit status: Title 11 permit required | Completion date: November 2, 2015 | Permit id: 2015-259180-000 | |||||
Construct a prefabricated 5,0 sf metal storage building for portland water bureau. Date: February 4, 2016Permit type: Application | Permit status: Approved | Completion date: November 10, 2015 | Permit id: 2015-263258-000 | |||||
Install two restroom exhaust fans. Date: February 9, 2016Permit type: Intake | Permit status: Closed | Completion date: November 30, 2015 | Permit id: 2015-268027-000 | |||||
Plumbing fixtures and drainage for new heavy vehicle storage building. Date: December 16, 2015Permit type: Plumbing inspections | Permit status: Approved | Completion date: April 13, 2016 | Permit id: 2015-278160-000 | |||||
Renovate fleet garage with nonconforming upgrade option 2 - compliance deadline of december 31, 2016 Permit type: Land use review | Permit status: Letter sent | Completion date: August 12, 2008 | Permit id: 2008-125391-000 | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; site plan revised to show generator blg to remain, new exterior staircase by others, small change to grading, revised landscaping plan, Date: September 4, 2015Permit type: Application | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2013-101210-Rev | |||||
Revision - new 2nd floor connection between ops and maintenance bldgs; ops bldg interior tenant improvements have been removed from scope of work; new closed added to osp 2nd floor; exiting path reconfigured. Date: September 4, 2015Permit type: Application | Permit status: Approved | Completion date: May 26, 2015 | Permit id: 2013-101265-Rev | |||||
Phase ii: maintenance building electrical work. Faxed. Date: April 3, 2014Permit type: Intake | Permit status: Closed | Completion date: January 14, 2014 | Permit id: 2014-104837-000 | |||||
Renovate fleet garage with nonconforming upgrade option 2 - compliance deadline of december 31, 2016 Permit type: Land use review | Permit status: Letter sent | Completion date: August 12, 2008 | Permit id: 2008-125391-000 | |||||
47 zone, 100-ton vav, hw reheat, two 10 mbh condensing boiler, circ pumps w vsd, 20-ton hrv, four 1. 5-ton & one 2. 5-ton ductless splits, plans w co Date: August 1, 2013Permit type: Intake | Permit status: Closed | Completion date: January 23, 2013 | Permit id: 2013-101235-000 | |||||
Office improvements on first and second floors to existing 2-story 26,0 sq ft office operations building. No occupancy change. Date: August 1, 2013Permit type: Application | Permit status: Approved | Completion date: January 18, 2013 | Permit id: 2013-101265-000 | |||||
Extend 2nd floor into stairwell over down stairs to 1st floor creating @ 1 sf of additional office work area Date: April 11, 2000Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: June 7, 2000 | Current use: Business | Permit id: 2000-142510-000 | |||||
Ti- existing tenant(water bureau) expand 2 offices into 3 Date: June 29, 2000Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: January 22, 2001 | Current use: Business | Permit id: 2000-158815-000 | |||||
Two new modular structures - foundation, ramps, stair and deck- see parent permit for site mitigation etc. Date: September 16, 2005Client: Northeast Coalition Of Neighbors | Permit type: New construction | Permit status: Under inspection | Current use: Business | Permit id: 2005-157193-000 | |||||
New canopy, trench drain, and new landscaping for purpose of non-conforming upgrades. (canopy, including footings, is a deferred submittal) demolish existing fleet garage canopy. See comment Date: August 3, 2006Client: Northeast Coalition Of Neighbors | Permit type: New construction | Permit status: Final | Completion date: January 8, 2007 | Current use: Factory/industrial | Permit id: 2005-153592-000 | |||||
New modular structure for security personnel; new exterior ada ramps, foundation, and stairs Date: July 20, 2006Client: Northeast Coalition Of Neighbors | Permit type: New construction | Permit status: Final | Completion date: February 14, 2007 | Current use: Business | Permit id: 2006-147703-000 | |||||
Demolish westinghouse building, mitigate contamination and replace with paved storage area and water quality swale - see comments Date: March 21, 2007Client: Northeast Coalition Of Neighbors | Permit type: Demolition | Permit status: Final | Completion date: January 15, 2008 | Current use: Business | Permit id: 2007-109132-000 | |||||
New lunch room with sink & d w; convert old lunchroom to workspace; new security door to lab area Date: June 30, 2008Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: October 2, 2008 | Current use: Business | Permit id: 2008-141816-000 | |||||
Renovate fleet garage for the portland water bureau new meter shop. Add pv and hot water solar panels at roof. Seismic upgrade. Partial change of occupancy to lower hazard. See comments Date: July 22, 2008Client: Northeast Coalition Of Neighbors | Permit type: Alteration | Permit status: Final | Completion date: May 12, 2010 | Current use: Business | Permit id: 2008-115273-000 | |||||
Demolish 3618 sf foundry building - no basement Date: November 8, 2012Client: Northeast Coalition Of Neighbors | Permit type: Demolition | Permit status: Final | Completion date: July 23, 2013 | Current use: Factory/industrial | Permit id: 2012-160244-000 | |||||
Demolish 6721 sf carpentry building Date: November 8, 2012Client: Northeast Coalition Of Neighbors | Permit type: Demolition | Permit status: Final | Completion date: May 2, 2014 | Current use: Factory/industrial | Permit id: 2012-160245-000 |