| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Amend permit com2014-09305 and/or plan no. 2014-894 issued 12/22/14 - modified swm structure includes 1 settling basin and 3 circular concrete storage tanks as per plans as per code. Date: June 11, 2015 Value: $10,682,488Permit id: Com2015-08700 | |||||
Original permit description:(com2014-09305)replacement of existing earthen stormwater retention pond with proposed concrete stormwater retention structure. New swm structure to include 3 lift stations piping for stormwater treatment applications a treat Date: May 15, 2015Permit id: Com2015-11164 | |||||
Original permit description:(com2014-16389)railroad track shift at curtis bay grading ( no parking lots buildings or impervious area is proposed ) as per plans and as per code. Date: February 12, 2015Permit id: Com2015-03286 | |||||
Replacement of existing earthen stormwater retention pond with proposed concrete stormwater retention structure. New swm structure to include 3 lift stations piping for stormwater treatment applications a treatment building ( x 32) and relocation of Date: December 22, 2014 Value: $8,760,000Permit id: Com2014-09305 | |||||
Installation of security system (a) - 13 devices as per code. Date: September 11, 2014 Value: $2,305Permit id: Com2014-19288 | |||||
Railroad track shift at curtis bay grading ( no parking lots buildings or impervious area is proposed ) as per plans and as per code. Date: August 14, 2014 Value: $50,000Permit id: Com2014-16389 | |||||
Installation of two lift stations and associated forcemain pipes to transfer stormwater collected on-site to a stormwater retention pond for treatment and processing for reuse applications. Date: June 25, 2014 Value: $300,000Permit id: Com2013-14976 | |||||
Installation of one (1) fire alarm system with assocaited devices to accommodate the first and second floors as per plans and as per code. Date: September 26, 2013 Value: $18,964Permit id: Com2013-08870 | |||||
Amend permit#com2011-21729 issued 2-15-12 w/completion date of 2-15-13 to extend for 6 months. Original permit description:(com2011-21729)construction of new concrete storage pad reclaim conveyor stacking conveyor and all associated appurtenances. Exist Date: March 13, 2013Permit id: Com2013-03934 | |||||
Roof replacement. Tear of existing. Replace rotted plywood. Install ice shield. Install centimark 45 mil reinforced epdm roofing install flashing vent and drip edge as per code Date: June 27, 2012 Value: $27,445Permit id: Com2012-13512 | |||||
Non structural alterations; exterior work; to install 252 roof mounted solar panels . 1 inverter 64. 76 as per plans as per code. Date: May 9, 2012 Value: $252,000Permit id: Com2012-07780 | |||||
Amend permit#com2011-21729 issued on 2-15-12 with plans#2011-1471 to add prime contractor as listed above. Original permit description:(com2011-21729)construction of new concrete storage pad reclaim conveyor stacking conveyor and all associated appurtena Date: April 5, 2012Permit id: Com2012-07256 | |||||
Construction of new concrete storage pad reclaim conveyor stacking conveyor and all associated appurtenances. Existing access road will be relocated. New dust suppression system will be installed. Stormwater runoff will be stored and used for dust suppr Date: February 15, 2012 Value: $100,000Permit id: Com2011-21729 | |||||
Request for time extension on permit com2011-00844 issued on 02/16/11 with original completion date of 08/16/11. Original permit description:(com2011-00844)interior work: 7 sq ft: modifications near and within the tank frame process alterations which Date: September 28, 2011Permit id: Com2011-20803 | |||||
Interior work: 7 sq ft: modifications near and within the tank frame process alterations which include process tank k6 new pad maintenance cat-walk and a shed expansion as per plans as per code. Date: February 16, 2011 Value: $60,000Permit id: Com2011-00844 | |||||
Exterior work - overhead water piping 25 x 25 prefab building (no occupancy). Date: December 20, 2010 Value: $800,000Permit id: Com2010-19378 | |||||
New water tank above ground welded steel diameter x high. Date: October 21, 2010 Value: $188,000Permit id: Com2010-21836 | |||||
Partial permits subject to all conditions of agreement to do footing and foundation only. Pending action on application for plan (# 2010-1209) the issuance of the general permit and the understanding that the engineer/architect will comply with the b Date: September 15, 2010 Value: $100,000Permit id: Com2010-20689 | |||||
(use) use building b for truck and trailer service and repair Date: July 30, 2007Permit id: Com2005-37949 | |||||
Use premises for maintenance shop Date: March 23, 2007Permit id: Use2007-01221 | |||||
Reinstate permit # com2006-10898 for thirty(30) days for final inspectionoriginal permit description:(com2006-10898)construct maintenance building addition (locker rooms restrooms office and storage as per plans and code. Separate fire alarm and low v Date: March 19, 2007Permit id: Com2007-08269 | |||||
Interior work to install fire alarm system as per plans as per code. Date: March 13, 2007 Value: $8,000Permit id: Com2007-06583 | |||||
Tank installation and concrete pad 71x as per plans and code. Date: February 2, 2007 Value: $200,000Permit id: Com2007-01248 | |||||
Amend permit #com2006-10898 issued on 6/6/06 with plans #2006-5 to add contractors as listed aboveextent completion date original permit description:(com2006-10898)construct maintenance building addition (locker rooms restrooms office and storage as Date: January 24, 2007Permit id: Com2007-02539 | |||||
Amend permit # com2006-10898 issued on 6/6/06 with plans # 2006-5 to add contractor as listed aboveoriginal permit description:(com2006-10898)construct maintenance building addition (locker rooms restrooms office and storage as per plans and code. Se Date: October 13, 2006Permit id: Com2006-31812 | |||||
Increase service fromm 2 to 600amp 120/2 volt as per code. Date: September 26, 2006 Value: $5,000Permit id: Com2006-29651 | |||||
Replace hvac equipment and ductwork as per code Date: September 6, 2006 Value: $80,000Permit id: Com2006-27392 | |||||
Construct maintenance building addition (locker rooms restrooms office and storage as per plans and code. Separate fire alarm and low voltage permit required. Date: June 6, 2006 Value: $70,000Permit id: Com2006-10898 | |||||
(use) use shed to thaw coal rail cars Date: January 9, 2006Permit id: Com2006-00788 | |||||
"construction of pre-engineered canopy building 23-8""x3 for existing coal ore handling and storage facility." Date: November 2, 2005 Value: $225,000Permit id: Com2005-24862 | |||||
Partial permit subject to all conditions of agreement on file to install footings foundation under ground utilities including site clearing shoring excavation sediment and erosion control measures for storage building pending action on application fo Date: September 26, 2005 Value: $45,000Permit id: Com2005-28575 | |||||
Partial permits subject to all conditions of agreement to do footing and foundation only. Pending action on application for plan (# 2010-1209) the issuance of the general permit and the understanding that the engineer/architect will comply with the baltimore city building fire and related code-2007. Date: September 15, 2010 Value: $100,000Expiration date: December 15, 2010 | Permit id: Com2010-20689 | |||||
Reinstate permit # com2006-10898 for thirty(30) days for final inspectionoriginal permit description:(com2006-10898)construct maintenance building addition (locker rooms restrooms office and storage as per plans and code. Separate fire alarm and low voltage permit required. Date: March 19, 2007Expiration date: April 19, 2007 | Permit id: Com2007-08269 | |||||
Amend permit #com2006-10898 issued on 6/6/06 with plans #2006-5 to add contractors as listed aboveextent completion date original permit description:(com2006-10898)construct maintenance building addition (locker rooms restrooms office and storage as per plans and code. Separate fire alarm and low voltage permit required. Date: January 24, 2007Expiration date: July 24, 2007 | Permit id: Com2007-02539 | |||||
Amend permit#com2011-21729 issued 2-15-12 w/completion date of 2-15-13 to extend for 6 months. Original permit description:(com2011-21729)construction of new concrete storage pad reclaim conveyor stacking conveyor and all associated appurtenances. Existing access road will be relocated. New dust suppression system will be installed. Stormwater runoff will be stored and used for dust suppression system. This will be a zero stormwater discharge site after construction is complete. Bulkhead repair and maintenance building replacement will be submitted under separate permit. Date: March 13, 2013Expiration date: September 12, 2013 | Permit id: Com2013-03934 | |||||
Construction of new concrete storage pad reclaim conveyor stacking conveyor and all associated appurtenances. Existing access road will be relocated. New dust suppression system will be installed. Stormwater runoff will be stored and used for dust suppression system. This will be a zero stormwater discharge site after construction is complete. Bulkhead repair and maintenance building replacement will be submitted under separate permit. Date: February 15, 2012 Value: $100,000Expiration date: February 15, 2013 | Permit id: Com2011-21729 | |||||
Amend permit#com2011-21729 issued on 2-15-12 with plans#2011-1471 to add prime contractor as listed above. Original permit description:(com2011-21729)construction of new concrete storage pad reclaim conveyor stacking conveyor and all associated appurtenances. Existing access road will be relocated. New dust suppression system will be installed. Stormwater runoff will be stored and used for dust suppression system. This will be a zero stormwater discharge site after construction is complete. Bulkhead repair and maintenance building replacement will be submitted under separate permit. Date: April 5, 2012Expiration date: February 15, 2013 | Permit id: Com2012-07256 | |||||
Replacement of existing earthen stormwater retention pond with proposed concrete stormwater retention structure. New swm structure to include 3 lift stations piping for stormwater treatment applications a treatment building ( x 32) and relocation of an existing gravel access road as per plans and as per code. Date: December 22, 2014 Value: $8,760,000Expiration date: December 22, 2016 | Permit id: Com2014-09305 | |||||
Original permit description:(com2014-09305)replacement of existing earthen stormwater retention pond with proposed concrete stormwater retention structure. New swm structure to include 3 lift stations piping for stormwater treatment applications a treatment building ( x 32) and relocation of an existing gravel access road as per plans and as per code. Date: May 15, 2015Expiration date: December 22, 2016 | Permit id: Com2015-11164 | |||||
Request for time extension on permit com2011-00844 issued on 02/16/11 with original completion date of 08/16/11. Original permit description:(com2011-00844)interior work: 7 sq ft: modifications near and within the tank frame process alterations which include process tank k6 new pad maintenance cat-walk and a shed expansion as per plans as per code. Date: September 28, 2011Expiration date: March 23, 2012 | Permit id: Com2011-20803 | |||||
Amendment to permit#186421 with new completion date. 6/03 Date: January 31, 2003 Value: $80,000Expiration date: June 26, 2003 | Permit id: Com2002-18001 | |||||
Amend permit # com2002-18001 issued 1/31/03 to extend completion date to 12/26/03 Date: June 5, 2003Expiration date: December 5, 2003 | Permit id: Com2003-29468 | |||||
1 amp service and 1 ckt Date: November 28, 2003 Value: $1,000Expiration date: May 31, 2004 | Permit id: Com2003-42358 | |||||
Construction of pre-engineered canopy building 23-8"x3 for existing coal ore handling and storage facility. Date: November 2, 2005 Value: $225,000Expiration date: November 2, 2006 | Permit id: Com2005-24862 | |||||
Partial permit subject to all conditions of agreement on file to install footings foundation under ground utilities including site clearing shoring excavation sediment and erosion control measures for storage building pending action on application for plan # 12 (2005) the issuance of the general permit and the understanding that the engineer/architect will comply with the 2003 edition of the baltimore city building fire and related codes as per plans. Date: September 26, 2005 Value: $45,000Expiration date: August 26, 2006 | Permit id: Com2005-28575 | |||||
Amend permit # com2006-10898 issued on 6/6/06 with plans # 2006-5 to add contractor as listed aboveoriginal permit description:(com2006-10898)construct maintenance building addition (locker rooms restrooms office and storage as per plans and code. Separate fire alarm and low voltage permit required. Date: October 13, 2006Expiration date: April 13, 2007 | Permit id: Com2006-31812 | |||||
Stormwater storage pond retrofit as per plans as per code. Date: October 5, 2016 Value: $330,885Expiration date: October 5, 2017 | Permit id: Com2016-22444 | |||||
Amend permit com2014-09305 and or plan no. 2014-894 issued 12 22 14 - modified swm structure includes 1 settling basin and 3 circular concrete storage tanks as per plans as per code. Date: June 11, 2015 Value: $10,682,488Expiration date: June 11, 2018 | Permit id: Com2015-08700 | |||||
Amend permit: add contractor .(original permit:com2015-08700:amend permit com2014-09305 and or plan no. 2014-894 issued 12 22 14 - modified swm structure includes 1 settling basin and 3 circular concrete storage tanks as per plans as per code.)original permit description:(com2015-08700)amend permit com2014-09305 and or plan no. 2014-894 issued 12 22 14 - modified swm structure includes 1 settling basin and 3 circular concrete storage tanks as per plans as per code. Date: February 8, 2017Expiration date: June 11, 2018 | Permit id: Com2017-02872 | |||||
Amend permit #com2006-10898 issued on 6 6 06 with plans #2006-5 to add contractors as listed aboveextent completion date original permit description:(com2006-10898)construct maintenance building addition (locker rooms restrooms office and storage as per plans and code. Separate fire alarm and low voltage permit required. Date: January 24, 2007Expiration date: July 24, 2007 | Permit id: Com2007-02539 | |||||
Amend permit # com2002-18001 issued 1 31 03 to extend completion date to 12 26 03 Date: June 5, 2003Expiration date: December 5, 2003 | Permit id: Com2003-29468 | |||||
Partial permit subject to all conditions of agreement on file to install footings foundation under ground utilities including site clearing shoring excavation sediment and erosion control measures for storage building pending action on application for plan # 12 (2005) the issuance of the general permit and the understanding that the engineer architect will comply with the 2003 edition of the baltimore city building fire and related codes as per plans. Date: September 26, 2005 Value: $45,000Expiration date: August 26, 2006 | Permit id: Com2005-28575 | |||||
Increase service fromm 2 to 600amp 120 2 volt as per code. Date: September 26, 2006 Value: $5,000Expiration date: March 26, 2007 | Permit id: Com2006-29651 | |||||
Request for time extension on permit com2011-00844 issued on 02 16 11 with original completion date of 08 16 11. Original permit description:(com2011-00844)interior work: 7 sq ft: modifications near and within the tank frame process alterations which include process tank k6 new pad maintenance cat-walk and a shed expansion as per plans as per code. Date: September 28, 2011Expiration date: March 23, 2012 | Permit id: Com2011-20803 | |||||
Amend permit#com2011-21729 issued 2-15-12 w completion date of 2-15-13 to extend for 6 months. Original permit description:(com2011-21729)construction of new concrete storage pad reclaim conveyor stacking conveyor and all associated appurtenances. Existing access road will be relocated. New dust suppression system will be installed. Stormwater runoff will be stored and used for dust suppression system. This will be a zero stormwater discharge site after construction is complete. Bulkhead repair and maintenance building replacement will be submitted under separate permit. Date: March 13, 2013Expiration date: September 12, 2013 | Permit id: Com2013-03934 | |||||
Amend permit # com2006-10898 issued on 6 6 06 with plans # 2006-5 to add contractor as listed aboveoriginal permit description:(com2006-10898)construct maintenance building addition (locker rooms restrooms office and storage as per plans and code. Separate fire alarm and low voltage permit required. Date: October 13, 2006Expiration date: April 13, 2007 | Permit id: Com2006-31812 | |||||
Partial permits subject to all conditions of agreement to do footing and foundation only. Pending action on application for plan (# 2010-1209) the issuance of the general permit and the understanding that the engineer architect will comply with the baltimore city building fire and related code-2007. Date: September 15, 2010 Value: $100,000Expiration date: December 15, 2010 | Permit id: Com2010-20689 | |||||
Amendment to permit#186421 with new completion date. 6 03 Date: January 31, 2003 Value: $80,000Expiration date: June 26, 2003 | Permit id: Com2002-18001 |