ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Two entrance monuments Date: August 12, 2013 Value: $14,200Permit type: Commercial building | Permit status: Stop work | Current use: Commercial miscellaneous struc | Permit id: 635411 | |||||
Bridge/foot bridge Date: March 20, 2014 Value: $8,500Permit type: Commercial building | Permit status: Issued | Current use: Commercial miscellaneous struc | Permit id: 635412 | |||||
Must have preconstruction meeting with dps row inspector prior to beginning of construction. Construct waterconnections only at the intersection in accordance with wssc plans and specifications . Work shall comply with montgomery county specifications for utility construction permit the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures and traffic controls shall comply with the mcdot a Date: December 17, 2012Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 285076 | |||||
Olney springs... Temporary driveway @ 18241 bowie mill road for sales trailer and temporary parking lot access. Must have preconstruction meeting with dps row inspector prior to construction. Construct temporary driveway. Proper precautions must be taken to keep the roadways free of mud, debris or other obstructions. Prior to release this permit remove temporary driveway. Complete repair (restoration of right of way including haul routes) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be complete as directed by the dps inspector and in accordance with ada & aba accessibility guidelines. Md dnr permit Date: January 18, 2013Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 286437 | |||||
Construct waterline connections in accordance with wssc plans and specifications. Work shall comply with montgomery county specifications for utility construction permit the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures and traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Xml:namespac Date: August 5, 2013Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 297344 |