ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
(use) use premises as a single-family dwelling. Date: October 28, 2008Permit id: Use2008-04748 | |||||
Hook up new fixtures in existing bathroom and kitchen. Hook up gas appliances furnace and stove. As per code. Date: October 3, 2008 Value: $4,000Permit id: Com2008-26895 | |||||
Date: September 29, 2008 Value: $500Permit id: Com2008-26361 | |||||
Original permit description:(com2007-12759)wire house to code install 15 circuits as per code Date: September 29, 2008Permit id: Com2008-26358 | |||||
Reinstate permit com2007-10096 issued on 4/2/07 for thirty day final inspectionoriginal permit description:(com2007-10096)install all necessary ductwork with 0 btu gas fired furnace with 2. 5 ton a/c as per code. Gas provided by others Date: September 29, 2008 Value: $6,400Permit id: Com2008-26437 | |||||
Construct 2 back decks (8 x 12 sq ft) with one rooftop deck (12 x 16 sq ft) as per code as per sketches signed & sealed by architectural engineer. Date: September 10, 2008 Value: $10,000Permit id: Com2008-23683 | |||||
Interior remodeling of exisiting structure. Insulation drywalll hardwood flors granite countertops cabinetry tile floor installation prep prime & paint. All as per code. Date: July 7, 2008 Value: $10,000Permit id: Com2008-18547 | |||||
Date: April 24, 2007Permit id: Com2007-12757 | |||||
Wire house to code install 15 circuits as per code Date: April 24, 2007 Value: $2,000Permit id: Com2007-12759 | |||||
Installing new drain lines and water lines throughout residence installing one kitchen one laundry room 3 bathrooms installing drain tile sump pump sewage ejection pump installing gas line to stove and furnace. Water heater is electric. As per code Date: April 11, 2007 Value: $9,000Permit id: Com2007-11085 | |||||
Install all necessary ductwork with 0 btu gas fired furnace with 2. 5 ton a/c as per code. Gas provided by others Date: April 2, 2007 Value: $6,000Permit id: Com2007-10096 | |||||
"rehab existing building and construct rer 1st floor addition 10x13 and rear 2nd floor addition 5-6""x13-0"" and 26x13 roof top wood deck per attatched sketches; per code as approved by bmza appeal no 152-06 as per sketch and code." Date: February 6, 2007 Value: $35,000Permit id: Com2007-03904 | |||||
Installing new water and drain lines throughout residence installing one kitchen one laundry room three 3 bathroom. Installing drain tile sump pump sewage ejection pump installing gas line to stove and furnace. Water heater is electric. All work as Date: December 13, 2005 Value: $8,000Permit id: Com2005-38465 | |||||
Lower basement floor curbing with reinforced concrete spread footing. As per attached sealed drawings. Date: September 12, 2005 Value: $5,000Permit id: Com2005-26900 | |||||
Interior demolition of existing building. Rehab internal partitions. Flooring and baths. As per drawings. No structural changes to building. Date: September 7, 2005 Value: $40,000Permit id: Com2005-26899 | |||||
Remove formstone clean cut point front of house. Date: August 22, 2005 Value: $2,200Permit id: Com2005-24895 | |||||
Rehab existing building and construct rer 1st floor addition 10x13 and rear 2nd floor addition 5-6"x13-0" and 26x13 roof top wood deck per attatched sketches; per code as approved by bmza appeal no 152-06 as per sketch and code. Date: February 6, 2007 Value: $35,000Expiration date: August 6, 2007 | Permit id: Com2007-03904 | |||||
Installing new drain lines and water lines throughout residence installing one kitchen one laundry room 3 bathrooms installing drain tile sump pump sewage ejection pump installing gas line to stove and furnace. Water heater is electric. As per code. Date: April 11, 2007 Value: $9,000Expiration date: October 11, 2007 | Permit id: Com2007-11085 | |||||
Installing new water and drain lines throughout residence installing one kitchen one laundry room three 3 bathroom. Installing drain tile sump pump sewage ejection pump installing gas line to stove and furnace. Water heater is electric. All work as per code. Total fixture= 14 all within existing structure. Date: December 13, 2005 Value: $8,000Expiration date: June 13, 2006 | Permit id: Com2005-38465 | |||||
Install all necessary ductwork with 0 btu gas fired furnace with 2. 5 ton a c as per code. Gas provided by others Date: April 2, 2007 Value: $6,000Expiration date: October 3, 2007 | Permit id: Com2007-10096 | |||||
Reinstate permit com2007-10096 issued on 4 2 07 for thirty day final inspectionoriginal permit description:(com2007-10096)install all necessary ductwork with 0 btu gas fired furnace with 2. 5 ton a c as per code. Gas provided by others Date: September 29, 2008 Value: $6,400Expiration date: October 29, 2009 | Permit id: Com2008-26437 |