ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Alteration permit Date: August 6, 2009Client: Masjid Baitul Mukarram | Permit status: Completed | Permit id: 230628 | |||||
Permit for the relocation of lot lines to create one (1) lot from three (3) existing lots (18, 20, 22 s. 43rd street); for the erection of a 43 high attached structure for use as a religious assembly with accessory classrooms and meeting rooms on the same lot with a two/three story building (interconnected by a stair tower), for use as an existing two family household living, (size and location as shown in the application). Date: February 6, 2015Client: Masjid Baitul Mukarram | Applicant: Thomas Citro | Permit type: Appeal | Permit status: Granted/prov | Completion date: December 4, 2015 | Permit id: 24581 | |||||
Alteration permit Date: August 6, 2009Client: Masjid Baitul Mukarram | Permit status: Completed | Permit id: 230628 | |||||
Zoning permit Date: November 14, 2016Client: Masjid Baitul Mukarram | Permit status: Completed | Permit id: 535680 | |||||
Permit for the relocation of lot lines to create one (1) lot from three (3) existing lots (18, 20, 22 s. 43rd street); for the erection of a 43 high attached structure for use as a religious assembly with accessory classrooms and meeting rooms on the same lot with a two three story building (interconnected by a stair tower), for use as an existing two family household living, (size and location as shown in the application). Date: February 6, 2015Client: Masjid Baitul Mukarram | Applicant: Thomas Citro | Permit type: Appeal | Permit status: Granted/prov | Completion date: December 4, 2015 | Permit id: 24581 | |||||
Cinderblock fence in rear yard Date: August 6, 2009Client: Masjid Baitul Mukarram | Permit type: Alteration permit | Permit status: Completed | Completion date: March 4, 2010 | Permit id: 230628 |