ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
At apartment #2: install a new metal entrance door with buck and all related hardware. Remove all work related debris. Date: December 1, 2006Permit type: Gc | Permit id: E714771 | |||||
Public area: repair the wooden floor of hallway at 2nd story. Secure all wooden balustrades. Re-install floor covering. Note: contractor must co Date: August 4, 2005Permit type: Gc | Permit id: E603120 | |||||
Restore gas heating boiler and hot water heater to proper working order. Remove all work related debris. Contractor must sign and return Date: November 30, 2005Permit type: Heat | Permit id: E615453 | |||||
Con edison provide gas to boiler hot water heater. Date: April 20, 2006Permit type: Util | Permit id: E631346 | |||||
Keyspan provide gas to boiler/hot heater. Date: April 19, 2006Permit type: Util | Permit id: E631266 | |||||
(apt. #1) make all necessary repairs to gas fired boilder and restore to proper working order. Ensure adequate heat and hot water to entire building Date: January 8, 2007Permit type: Heat | Permit id: E718090 | |||||
Apartment #1 replace ceramic tiles in kitchen and bathroom approx: sq. Ft. (1sq. Ft tiles). Remove all work related debris. Note: contractor Date: April 28, 2006Permit type: Gc | Permit id: E631961 | |||||
Con edison provide electricity to building public areas and heating plant hot wate rheater. Date: April 20, 2006Permit type: Util | Permit id: E631345 | |||||
Keyspan provide gas to boiler hot heater. Date: April 19, 2006Permit type: Util | Permit id: E631266 |