ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
At cellar: light ( ignite) gas h/w heater and restore to pwo. At the time of this invitation to bid, it is not anticipated that this work will distu Date: December 2, 2010Permit type: Heat | Permit id: Eb16393 | |||||
Public area : at 1st story public hall stairs : install (2) balusters. Remove all work related debris. Date: March 5, 2009 Value: $29Permit type: Gc | Permit id: E929690 | |||||
At cellar: light ( ignite) gas h w heater and restore to pwo. At the time of this invitation to bid, it is not anticipated that this work will distu Date: December 2, 2010Permit type: Heat | Permit id: Eb16393 | |||||
Provide and install low water cut off. Replace aquastat, operating pressuretrol, and glass guage assembly. Make all necessary repairs to restore hot Date: December 7, 2010Permit type: Heat | Permit id: Eb16692 | |||||
Apt#2: provide and install 90il capsheet to cover section of the roof over the bathroom ceiling approx 100sf. Install sheetrock, approx 35 s/f. Prime Date: November 23, 2010Permit type: Gc | Permit id: Eb15305 | |||||
Cellar / boiler heat make all necessary repairs to #2 oil fired burner in order to restore an adequate supply of heat and hot water to the entire bl Date: November 4, 2010Permit type: Heat | Permit id: Eb14110 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problemsimmediately to esb fuel unit. (212) 863-8781 Date: October 29, 2010Permit type: Util | Permit id: Eb13906 | |||||
Apt#2: provide and install a new shower body. Restore the dismantled wall tiles approx 10s/f. Remove all work related debris. Note: contractor Date: November 22, 2010Permit type: Gc | Permit id: Eb15304 | |||||
Provide single fuel drop with prime and start #2 fuel fill tank. Please report any problems immediately to esb fuel unit. (212) 863-8781 Date: November 18, 2010Permit type: Util | Permit id: Eb15340 | |||||
At cellar:clear main sewer stoppage from main house trap into street and from house trap back into bldg. To correct condition of sewage backing into bo Date: December 3, 2010Permit type: Stopag | Permit id: Eb16396 | |||||
Make all necessary repairs to #2 oil boiler to restore to proper working order. Restore heat. Note: contractor must contact hpd at 718 623-6929 wi Date: November 26, 2010Permit type: Heat | Permit id: Eb15881 | |||||
Cellar provide and install new gas fired water heater sufficent to meet the building demand and recovery for hot water ( minimum gallon) ensuring Date: December 10, 2010Permit type: Plumb | Permit id: Eb16847 | |||||
Cellar boiler heat make all necessary repairs to #2 oil fired burner in order to restore an adequate supply of heat and hot water to the entire bl Date: November 4, 2010Permit type: Heat | Permit id: Eb14110 | |||||
Apt#2: provide and install a new shower body. Restore the dismantled wall tiles approx 10s f. Remove all work related debris. Note: contractor Date: November 22, 2010Permit type: Gc | Permit id: Eb15304 | |||||
Apt#2: provide and install 90il capsheet to cover section of the roof over the bathroom ceiling approx 100sf. Install sheetrock, approx 35 s f. Prime Date: November 23, 2010Permit type: Gc | Permit id: Eb15305 |