ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
New ac for existing sfd. Date: October 29, 2014Permit type: Combination : 80 - a | Permit status: Permit issued | Permit id: Pds2014-Resalt- | |||||
SCORE 67 48 sqft re-roof for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingles proposed roofing material asphalt shingles manufacturer malarkey brand and model highlander color (if cool roof required) dove white crrc #0850-0014 built-up roofing assembly system number per attached listing report (if applicable) n a specific exemption from cool roof requirements (if applicable) no required building inspector field verification (if applicable) yes note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: September 12, 2017 | Permit id: Pds2017-Resalt- |