ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
(use) (new operator) use premises for a bed & breakfast establishment with 2 eff & 5 ru:1st fl: common areas warming kitchen accessory office & 1ru2nd fl: 1eff & 2ru3rd fl: 1eff & 2ru per bmza 166-88x (use of roof top de Date: July 28, 2010Permit id: Use2010-01818 | |||||
Replace affected wood facade & replace with same look and design as per code. Date: June 9, 2006 Value: $2,500Permit id: Com2006-17688 | |||||
Replace 3 tubs 3 w/c 3 lavs cap off 2 bar sinks as per code no other plumb work behind walls Date: February 2, 2006 Value: $4,000Permit id: Com2006-03814 | |||||
Retail store womens clothing store Date: April 18, 2002Permit id: Com2002-00713 | |||||
(use) (new operator) use premises for a bed & breakfast establishment with 2 eff & 5 ru:1st fl: common areas warming kitchen accessory office & 1ru2nd fl: 1eff & 2ru3rd fl: 1eff & 2ru per bmza 166-88x (use of roof top deck prohibit until certification or repairs are completed per inspector) Date: July 28, 2010Permit id: Use2010-01818 | |||||
Continue to use premises for a bed and breakfast. Change of ownership. No expiration date Date: August 27, 2003Permit id: Com2003-30756 | |||||
Non-structural alterations/interior work 612 sq. Ft. - removal of lighting fixtures partitions and flooring as per code. Demo only separate permit required for tenant fit-out Date: May 25, 2016 Value: $3,700Expiration date: November 25, 2016 | Permit id: Com2016-13571 | |||||
(use) use premises for five rooming units and two commercial uses. Five (5) rooming units: 2nd & 3rd floors 1st floor -office(s) 1st floor street-unoccupied commercial space. Date: June 8, 2016Permit id: Use2016-02136 | |||||
Authorization to proceed all work to be completed as per plans in chap files. Paint the facade. Roycroft pewter sw 288 (sherwin williams) - to be used for 1st floor panels and trim boards 2nd and 3rd floor window trim and sill and the cornice black hc-1 (benjamin moore) - 1st floor small border trim and window mullions classic burgundy hc-182 (benjamin moore - to be used for the door colonial revival sw 2832 (sherwin williams) - 2nd and 3rd floor brick facade and stone headers. Date: July 1, 2016 Value: $500Expiration date: January 1, 2017 | Permit id: Com2016-17107 | |||||
Amend permit: add contractor .(original permit:com2016-22245:for tenant space known as 1714b thames street: 2nd and 3rd floor upgrades only no work to be completed on 1st floor except for new gas supply for new roof top units connecting to existing service on the 1st floor (all other notes are for reference only for future work to be completed under separate permit) minor interior demolition installation of new mechanical system minor power lighting and data upgrades minor plumbing upgrades with connection made; interior partition and finish renovations as well as removal of rooftop condensing units and wood supports install structural reinforcement for new air handling unit on rooftop and minor repairs as needed to railings and roof as per plans as per code. Separate permit required for sprinkler system and fire alarm.)original permit description:(com2016-22245)for tenant space known as 1714b thames street: 2nd and 3rd floor upgrades only no work to be completed on 1st floor except fo Date: November 9, 2016Expiration date: November 2, 2017 | Permit id: Com2016-28705 | |||||
Authorization to proceed all work to be completed as per plans in chap files. Install new 30" x 48" hanging wood blade sign from new metal bracket attached above storefront window as per plans on file and per code bracket to be attached into first floor storefront wood panel below the storefront cornice. Date: July 1, 2016 Value: $250Expiration date: January 1, 2017 | Permit id: Com2016-17096 | |||||
Non-structural alterations/interior work - for tenant space know as 1714 b thames street. Modify existing wet pipe system w/ 2 relocations and 3 add. As per code. Date: November 15, 2016 Value: $3,300Expiration date: May 15, 2017 | Permit id: Com2016-28531 | |||||
For tenant space known as 1714b thames street: 2nd and 3rd floor upgrades only no work to be completed on 1st floor except for new gas supply for new roof top units connecting to existing service on the 1st floor (all other notes are for reference only for future work to be completed under separate permit) minor interior demolition installation of new mechanical system minor power lighting and data upgrades minor plumbing upgrades with connection made; interior partition and finish renovations as well as removal of rooftop condensing units and wood supports install structural reinforcement for new air handling unit on rooftop and minor repairs as needed to railings and roof as per plans as per code. Separate permit required for sprinkler system and fire alarm. Date: November 2, 2016 Value: $207,000Expiration date: November 2, 2017 | Permit id: Com2016-22245 | |||||
Relocate and add outlets; light fixtures and 5 switches to existing tennant space Date: June 13, 2016 Value: $10,000Expiration date: December 13, 2016 | Permit id: Com2016-15241 | |||||
(use) use 1st floor as retail space (retail sales of high-end handbags and watches) Date: July 8, 2016Permit id: Use2016-03094 | |||||
(use)convert the rooming units on 2nd and 3rd fl for office use only Date: April 28, 2017Permit id: Use2016-04830 | |||||
Interior fit-out of apartment on ground floor of an existing 3 story building of approximately 545 gross square feet 7 square feet including pass-thru courtyard includes new walls doors furniture and rebalancing hvac systems electrical plumbing as per plans as per code. Separate permit required for sprinkler systema and fire alarm. Date: May 26, 2017 Value: $40,000Expiration date: November 26, 2017 | Permit id: Com2017-08784 | |||||
Amend permit: add contractor .(original permit:com2017-08784:interior fit-out of apartment on ground floor of an existing 3 story building of approximately 545 gross square feet 7 square feet including pass-thru courtyard includes new walls doors furniture and rebalancing hvac systems electrical plumbing as per plans as per code. Separate permit required for sprinkler systema and fire alarm.)original permit description:(com2017-08784)interior fit-out of apartment on ground floor of an existing 3 story building of approximately 545 gross square feet 7 square feet including pass-thru courtyard includes new walls doors furniture and rebalancing hvac systems electrical plumbing as per plans as per code. Separate permit required for sprinkler systema and fire alarm. Date: June 7, 2017Expiration date: November 26, 2017 | Permit id: Com2017-11372 | |||||
Non-structural alterations interior work 612 sq. Ft. - removal of lighting fixtures partitions and flooring as per code. Demo only separate permit required for tenant fit-out Date: May 25, 2016 Value: $3,700Expiration date: November 25, 2016 | Permit id: Com2016-13571 | |||||
Non-structural alterations interior work - for tenant space know as 1714 b thames street. Modify existing wet pipe system w 2 relocations and 3 add. As per code. Date: November 15, 2016 Value: $3,300Expiration date: May 15, 2017 | Permit id: Com2016-28531 | |||||
Replace 3 tubs 3 w c 3 lavs cap off 2 bar sinks as per code no other plumb work behind walls Date: February 2, 2006 Value: $4,000Expiration date: August 2, 2006 | Permit id: Com2006-03814 |