For the complete demolition of an existing, semi-detached, two (2) story structure. Structure to be demolished by hand and with hand held tools only. Pedestrian protection to be in place prior to start of work and to be maintained during all demolition activities. . A covered walkway or sidewalk closure shall be required within 8 feet of building facade in accordance with section 3306 of the ibc. Separate building and or streets department permits are required. 21 day posting and notice required. Newly exposed walls to be treated. Date: November 14, 2017Permit type: Demolition permit | Permit status: Active | Completion date: December 1, 2017 | Permit id: 798051 | |||||
SCORE 100 "seal lateral" - abandoned laterals shall have the house trap removed and the pipe shall be hermetically sealed by a cap or plug at the curb line - "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" Date: May 17, 2017 Contractor: Shegda Construction CorpPermit type: Plumbing permit | Permit status: Active | Completion date: June 9, 2017 | Permit id: 784503 | |||||
Complete demolition of existing structure. Erect four story structure for use as nine family household living. Date: February 1, 2017Permit type: Zoning/use permit | Permit status: Completed | Completion date: February 2, 2017 | Permit id: 746621 |