ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Mechanical retrofit of farquhar middle school Date: October 29, 2007 Value: $822,000Permit type: Commercial building | Permit status: Issued | Current use: Educational building | Permit id: 468818 | |||||
Farquhar middle school - 1 control wiring Date: December 12, 2003Permit type: Electrical permit | Permit status: Issued | Current use: Educational building | Permit id: 327456 | |||||
Fire alarm system with low voltage devices at mcps - william h. Farquar middle school Date: July 14, 2004Permit type: Electrical permit | Permit status: Finaled | Completion date: October 12, 2004 | Current use: Educational building | Permit id: 351624 | |||||
1 electrical heating equip: 5hp; 1 electrical heating: 1 hp Date: July 20, 2004Permit type: Electrical permit | Permit status: Issued | Current use: Educational building | Permit id: 352350 | |||||
Mcps - farquhar middle school Date: October 31, 2007Permit type: Electrical permit | Permit status: Issued | Current use: Educational building | Permit id: 469793 | |||||
Farquhar middle school Date: June 26, 2007Permit type: Mechanical permit | Permit status: Issued | Current use: Educational building | Permit id: 457885 | |||||
Farquhar middle school Date: July 19, 2004Permit type: Mechanical permit | Permit status: Issued | Current use: Educational building | Permit id: 352053 | |||||
Abandongas service in accordance with washington gas plan no. 702706. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: September 23, 2016Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354487 | |||||
Install new 2" gas service in accordance with washington gas plan no. 444913. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Date: December 10, 2014Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 327329 |