ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
New duplex/2 story with finished basement/attached garages/flat lot/complex Date: November 4, 2015Permit type: Application | Permit status: Approved | Completion date: August 10, 2015 | Permit id: 2015-214710-000 | |||||
Revision to raise the elevation of each unit 24. Additon of railing at first floor decks and stairs, new post on the first floor and change of beam size at second floor. Relocation of natural gas meters. Kitchen window c deleted, added 1 hose bib in each unit. Added windows over garage doors. Door & window schedule changes. Added structural details see attached summary detail Date: March 18, 2016Permit type: Application | Permit status: Approved | Completion date: February 10, 2016 | Permit id: 2015-214710-Rev | |||||
Temp power pole Date: December 15, 2015Permit type: Electrical inspections | Permit status: Approved | Completion date: December 16, 2015 | Permit id: 2015-277647-000 | |||||
San conn only: 2 lf of 8 csp main, (approx d=9), in ne 17th ave. Contractor shall connect to existing capped branch per std p-262 (approx l=15 and d=7) located approx. 6 from usmh (aaq930). Contractor to verify all depths and locations in field. Contact x37869 Date: January 22, 2016Permit type: Intake | Permit status: Closed | Completion date: January 22, 2016 | Permit id: 2016-109492-000 | |||||
New duplex 2 story with finished basement attached garages flat lot complex Date: November 4, 2015Permit type: Application | Permit status: Approved | Completion date: August 10, 2015 | Permit id: 2015-214710-000 |