| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Alarm Date: October 29, 2015Permit id: Ele2015-00276 | |||||
Request for time extension on permit com2008-036 issued on 02/08/2008 with orginal completion date of 08/08/2008. Amend permit com2008-036 issued on 02-08-08 to add the following additional work; 6 additional circuits needed as per code. Original per Date: August 1, 2008 Value: $200Permit id: Com2008-21123 | |||||
Add connector and lights (45) fixtures (6) fixture as per code Date: February 8, 2008Permit id: Com2008-03680 | |||||
Drywall front bedroom front room in basement office living room kitchen rear foyer hardwood floors and or laminate throughout 1st floor carpet 2nd floor and new kitchen cabinets counter tops and appliances. As per code. Date: February 6, 2008 Value: $9,000Permit id: Com2008-03298 | |||||
Original permit description:(com2007-17464)replace water lines wha cpvc to existing one group one laundry connection one kitchen sink. Replace nat gas water heater. Replace waste to one bath group and one laundry connection and one kitchen sink. As per Date: December 11, 2007Permit id: Com2007-37611 | |||||
Install 200amp service and ckt breaker panel. Work as per code. Date: November 6, 2007 Value: $1,000Permit id: Com2007-34267 | |||||
Install 2 ton electric a/c 24 0 btu and install duct system to heat and cool each room. As per code. Date: October 31, 2007 Value: $5,600Permit id: Com2007-33615 | |||||
Remove formstone from front facade. Power wash point off. Then cut and point. As per code. Date: June 19, 2007 Value: $2,000Permit id: Com2007-19344 | |||||
Replace water lines wha cpvc to existing one group one laundry connection one kitchen sink. Replace nat gas water heater. Replace waste to one bath group and one laundry connection and one kitchen sink. As per code. Date: June 5, 2007 Value: $2,100Permit id: Com2007-17464 | |||||
Install new front window and door. New drywall on 1st floor. Pergo or hardwood in livingroom and office. Tile in bathroom and kitchen. Removal of trash/debris associated with work. Vinyl siding rear on rear of house. As per code. Date: May 16, 2007 Value: $27,000Permit id: Com2007-15415 | |||||
Request for time extension on permit com2008-036 issued on 02/08/2008 with orginal completion date of 08/08/2008. Amend permit com2008-036 issued on 02-08-08 to add the following additional work; 6 additional circuits needed as per code. Original permit description:(com2008-03680)add connector and lights (45) fixtures (6) fixture as per code Date: August 1, 2008 Value: $200Expiration date: February 1, 2009 | Permit id: Com2008-21123 | |||||
Original permit description:(com2007-17464)replace water lines wha cpvc to existing one group one laundry connection one kitchen sink. Replace nat gas water heater. Replace waste to one bath group and one laundry connection and one kitchen sink. As per code. Date: December 11, 2007Expiration date: January 11, 2008 | Permit id: Com2007-37611 | |||||
Install new front window and door. New drywall on 1st floor. Pergo or hardwood in livingroom and office. Tile in bathroom and kitchen. Removal of trash debris associated with work. Vinyl siding rear on rear of house. As per code. Date: May 16, 2007 Value: $27,000Expiration date: November 16, 2007 | Permit id: Com2007-15415 | |||||
Install 2 ton electric a c 24 0 btu and install duct system to heat and cool each room. As per code. Date: October 31, 2007 Value: $5,600Expiration date: May 1, 2008 | Permit id: Com2007-33615 | |||||
Request for time extension on permit com2008-036 issued on 02 08 2008 with orginal completion date of 08 08 2008. Amend permit com2008-036 issued on 02-08-08 to add the following additional work; 6 additional circuits needed as per code. Original permit description:(com2008-03680)add connector and lights (45) fixtures (6) fixture as per code Date: August 1, 2008 Value: $200Expiration date: February 1, 2009 | Permit id: Com2008-21123 |