ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Private sump pump drainage connection to row install sump pump drain connection within the county right of way. Sump pump drain will be connected into the county storm drain structure or pipe as directed by the dps inspector. Concrete epoxy non? Shrink grout will be used to patch the drainpipe. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. (requires ra-1316 ) work shall be complete as directed by the dps row inspector. Date: August 24, 2015Permit type: Public right of way | Permit status: Completed | Current use: House drain | Permit id: 341053 |