ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 95 Remove 1 pole and install 1 pole on 17th pl se . As indicated on attached prints. Wr#3406472 (heather duperly 202 388-2528 ) ( paul asmussen 202 388-2616 ) new pole cannot be installed within 15 of existing street trees, center to center. Existing street trees within or directly adjacent to the limits of work must be protected. All tree protection measures and excavation operations shall comply with ddot standard specifications for highways and structures sections 107, 207, and 611. None of the following shall occur within the dripline i. E. The ground area under the canopy of the tree: alteration or disturbance to existing grade, staging/storage of construction materials, equipment, soil, or debris; disposal of any liquids e. G. Concrete, gas, oil, paint; and blacktop, and trenching. All work shall be conducted so as to avoid injury to tree trunks, branches, and roots. Pruning and trimming activities shall only be performed under the consent and supervision of the ddot urban forestry ad Date: December 13, 2012 Contractor: Pepco Holdings IncPermit type: Over head work; pole installation (single or first one), over head work; pole removal (single or first one) | Permit status: Permit expired | Expiration date: July 12, 2013 | Permit id: Pa77764 | |||||
SCORE 95 Remove 1 pole and install 1 pole on 17th pl se . As indicated on attached prints. Wr#3406472 (heather duperly 202 388-2528 ) ( paul asmussen 202 388-2616 ) new pole cannot be installed within 15 of existing street trees, center to center. Existing street trees within or directly adjacent to the limits of work must be protected. All tree protection measures and excavation operations shall comply with ddot standard specifications for highways and structures sections 107, 207, and 611. None of the following shall occur within the dripline i. E. The ground area under the canopy of the tree: alteration or disturbance to existing grade, staging storage of construction materials, equipment, soil, or debris; disposal of any liquids e. G. Concrete, gas, oil, paint; and blacktop, and trenching. All work shall be conducted so as to avoid injury to tree trunks, branches, and roots. Pruning and trimming activities shall only be performed under the consent and supervision of the ddot urban forestry ad Date: January 9, 2013 Contractor: Pepco Holdings IncPermit status: Permit expired | Expiration date: July 12, 2013 | Permit id: Pa77764 |